| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-Finance | ₹11.8 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | Ashraf K.A. L1 |
|---|---|---|---|---|
| 1.00Detailed Estimate | ||||
| 1.00 | OD116704/2024-2025:Engaging wood cutter for cutting trees and branches standing in dangerous condition | 3 | Day | 1,438.74 ₹4,316.22 Lowest |
| 1.00 | OD116705/2024-2025:Hiring chainsaw with motor for wood cutting | 3 | Day | 797.87 ₹2,393.61 Lowest |
| 1.00 | OD116816/2024-2025:Engaging mobile crane with all accessories | 3 | Day | 8,643.96 ₹25,931.88 Lowest |
| 1.00 | OD116851/2024-2025:Engaging man mazdoor for clearing silt from the deck slab of bridge, vegetation growth of sub structure, hand rails etc complete. | 25 | each | 1,238.97 ₹30,974.25 Lowest |
| 1.00 | 3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 96 | cum | 614.67 ₹59,008.32 Lowest |
| 1.01 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 8.1 | cum | 86.76 ₹702.76 Lowest |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 18.9 | cum | 8,053.54 ₹1,52,211.91 Lowest |
| 1.01 | 12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 | 16.2 | cum | 10,057.03 ₹1,62,923.89 Lowest |
| 1.01 | 15.4.A:Providing and laying Pitching on slopes laid over prepared filter media including boulder Stone/Boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications | 144 | cum | 4,379.88 ₹6,30,702.72 Lowest |
Tender Value
₹10.7 L
EMD Value
₹26,810
Closing Date
12 Jun 2026, 2:00 pmClosed
Assistant Executive Engineer
O/o The Assistant Executive Engineer PWD Bridges subdivision,Kakkanad
GENERAL-Bridge Safety Works - Kumbalangi Perumpadappu Bridge-Bridge Safety works - Kumbalangi Perumpadappu Bridge - Maintenance work for Approach road-General Civil Work
2025_PWD_819714_5
PWD/BR/TR/15251/2024_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Kumbalangi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹26,810
Yes
15 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | OD116704/2024-2025:Engaging wood cutter for cutting trees and branches standing in dangerous condition | - | Day | - | - |
| 1.002 | OD116705/2024-2025:Hiring chainsaw with motor for wood cutting | - | Day | - | - |
| 1.003 | OD116816/2024-2025:Engaging mobile crane with all accessories | - | Day | - | - |
| 1.004 | OD116851/2024-2025:Engaging man mazdoor for clearing silt from the deck slab of bridge, vegetation growth of sub structure, hand rails etc complete. | - | each | - | - |
| 1.005 | 3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | - | cum | - | - |
| 1.006 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 1 | cum | - | - |
| 1.007 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 1 | cum | - | - |
| 1.008 | 12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 | 1 | cum | - | - |
| 1.009 | 15.4.A:Providing and laying Pitching on slopes laid over prepared filter media including boulder Stone/Boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1444443.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
nitsbd.pdf
Tender Documents • 1.66 MB
BOQ_1444443.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].