| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | ₹10.0 L | L1 | Admitted-Finance |
| 2 | L2₹10.3 L+₹26,924.06 (2.68%)Admitted-Finance | ₹10.3 L+₹26,924.06 (2.68%) | L2 | Admitted-Finance |
| 3 | L3₹10.7 L+₹71,272 (7.11%)Admitted-Finance | ₹10.7 L+₹71,272 (7.11%) | L3 | Admitted-Finance |
| 4 | L4₹12.2 L+₹2.2 L (21.7%)Admitted-Finance | ₹12.2 L+₹2.2 L (21.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sudha Constructions L3 | B RAMAKRISHNA REDDY L2 | OM INTERIORS L1 | nasar ahmed L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Scaffolding Work for plastering the newly constructed brick wall on the outer surface | 1 | LS | 1,00,000 ₹1,18,000 | 63,215 ₹74,593.7 | 55,000 ₹64,900 | 38,000 ₹44,840 Lowest |
| 2.00 | Dismantling Works | 1 | Flat | 20,000 ₹23,600 Lowest | 49,999 ₹58,998.82 | 60,000 ₹70,800 | 29,000 ₹34,220 |
| 3.00 | Providing and constructing single-brick / Half Brick thick walls. | 15 | Sqm. | 1,500 ₹26,550 | 1,400 ₹24,780 | 1,300 ₹23,010 Lowest | 1,800 ₹31,860 |
| 4.00 | Providing and constructing, Full Brick (230mm thick) walls. | 13 | Cum | 9,000 ₹1,38,060 | 2,222 ₹34,085.48 Lowest | 2,500 ₹38,350 | 10,050 ₹1,54,167 |
| 5.00 | Providing and laying screed concrete under flooring in general areas other than bathrooms and toilets. | 6 | Cum | 10,000 ₹70,800 Lowest | 12,000 ₹84,960 | 10,000 ₹70,800 Lowest | 11,500 ₹81,420 |
| 6.00 | Providing, cutting, straightening, bending tying and placing in position TOR steel reinforcements, for Brickwork and for RCC Chajja over the Window in the newly created bedroom: | 12 | kg | 150 ₹2,124 | 550 ₹7,788 | 500 ₹7,080 | 105 ₹1,486.8 Lowest |
| 7.00 | Providing and casting, R.C.C lintels. | 4 | Rm. | 2,000 ₹9,440 Lowest | 2,100 ₹9,912 | 2,200 ₹10,384 | 8,900 ₹42,008 |
| 8.00 | Repairs to damaged R.C.C members. | 1 | Sqm. | 3,000 ₹3,540 Lowest | 5,000 ₹5,900 | 5,000 ₹5,900 | 6,300 ₹7,434 |
| 9.00 | Providing and rendering back plaster for wall dado in C.M 1:4 (rough finish/ smooth finish) - 20 mm thick. | 140 | Sqm. | 720 ₹1,18,944 | 550 ₹90,860 | 500 ₹82,600 Lowest | 680 ₹1,12,336 |
| 10.00 | Providing and rendering back plaster CM 1:4 (rough/ smooth finish) - 15 mm thick - for old/ existing walls. The work shall be executed as indicated in item 9 above but for 15 mm thick plaster. | 12 | Sqm. | 720 ₹10,195.2 | 500 ₹7,080 | 475 ₹6,726 Lowest | 560 ₹7,929.6 |
Tender Value
₹10 L
Closing Date
23 Jul 2026, 1:00 pmClosed
Regional Director
RBI, Hyderabad
Additions, alterations, and renovation to Flat No. 502 of Manjeera Building to create additional Bedroom
2026_RBI_283721_1
RBI_HYD_10_7_2026
Limited
Civil Works
Works
RBI Officers Quarters, Ameerpet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
24 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
23 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scaffolding Work for plastering the newly constructed brick wall on the outer surface | 1 | LS | - | - |
| 2 | Dismantling Works | 1 | Flat | - | - |
| 3 | Providing and constructing single-brick / Half Brick thick walls. | 15 | Sqm. | - | - |
| 4 | Providing and constructing, Full Brick (230mm thick) walls. | 13 | Cum | - | - |
| 5 | Providing and laying screed concrete under flooring in general areas other than bathrooms and toilets. | 6 | Cum | - | - |
| 6 | Providing, cutting, straightening, bending tying and placing in position TOR steel reinforcements, for Brickwork and for RCC Chajja over the Window in the newly created bedroom: | 12 | kg | - | - |
| 7 | Providing and casting, R.C.C lintels. | 4 | Rm. | - | - |
| 8 | Repairs to damaged R.C.C members. | 1 | Sqm. | - | - |
| 9 | Providing and rendering back plaster for wall dado in C.M 1:4 (rough finish/ smooth finish) - 20 mm thick. | 140 | Sqm. | - | - |
| 10 | Providing and rendering back plaster CM 1:4 (rough/ smooth finish) - 15 mm thick - for old/ existing walls. The work shall be executed as indicated in item 9 above but for 15 mm thick plaster. | 12 | Sqm. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TenderDocument.pdf
Tender Documents • 0.81 MB
BOQ_331001.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .