Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹4.5 L+₹163.02 (0.04%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest | |
| 3 | L3₹4.7 L+₹12,470.02 (2.74%)Rejected-AOC | L3 | Rejected-AOC 3rd lowest |
Tender Value
₹6 L
EMD Value
₹15,000
Closing Date
24 Aug 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE LSGD OTTAPPALAM BLOCK PANCHAYATH
O/O Assistant Executive Engineer LSGD Sub division , Ottappalam Block Panchayath,679101
MATTUMMAL COLONY ROAD PR 42 THRIKKADEERI G P
2020_LSGD_377285_1
AE/01/TENDER/2020-21
Open Tender
Civil Works - Roads
Item Rate
180 days
O/O Assistant Executive Engineer LSGD Sub division
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,344
Yes
online
₹15,000
Yes
22 Sept 2020
17 Aug 2020
26 Aug 2020
17 Aug 2020
24 Aug 2020
17 Aug 2020
180 days
Amount
Road Concreting
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
MUHAMMED MUSTHAFA.P
K Saidalavi
Bidder Name
Raveendran M
K Saidalavi
MUHAMMED MUSTHAFA.P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_534679.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .