Tender Value
₹39.0 L
EMD Value
₹39,000
Closing Date
4 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Nadiad Irrigation Division Nadiad
Construction of HR Gate at ch. 0 ft. and pipe type VRB at ch. 920 ft. on Uttarsanda Distry Ex. Nadiad Branch Canal
288194
Online Tender Notice No. 22 of 2025-26
Open
Civil - All
Kheda
6 documents required · 5 mandatory · 1 optional
₹1,500
Yes
Executive Engineer Nadiad Irrigation Division, Nadiad
₹39,000
Yes
21 Mar 2026
21 Mar 2026
21 Mar 2026
4 Apr 2026
21 Mar 2026
BILL OF QUANTITIES
Name of work - Construction of HR Gate at Ch. 0 ft. and Pipe Type VRB at Ch. 920 ft. on
Uttarsanda Distry Ex. Nadiad Branch Canal.
Item Item of work Unit Qty. Rate Amount (Rs.)
Clearing the canal banks outer and inner slopes by
jungle cutting, removing vegetation, Ghabajaria,
1 Tress etc. along with burning its and carrying away Sq.M 5944.00 10.30
as and where required and as directed etc.
completed by machineries.
Clearing the silt from the canal/drain bed by a
digging the same to the required bed level and
gradient including depositing the excavated earth
regularly in spoil bank for utilizing the same
preparing the banks after breaking clods as and
where directed for all leads and lifts. For Canals
Between 21 to 250 Cusec. & 0 to 1.5 m lift.
Dismantling the existing brick masonry including
sorting out and stacking the useful material and
3 removing the debris and making good the damages Cu.M 92.00 750.90
etc. complete as directed. In Cement Mortar
Dismantling the existing RCC Pipes including sorting
out and stacking of the useful materials of the
4 following diameters including refilling the trenches Meter 37.50 1270.70
etc. complete as directed. (d) 1000 mm to 1200 mm
Dismantling the existing foundation concrete
including sorting out the dismentalled stuff and
stacking the useful material, removing the debris
and making good the damages etc. complete as and
where directed. Cement mortar
Dismantling the CC Lining including disposing off the
6 dismentalled materials as directed etc. Complete (a) Sq.M 751.80 86.50
Excavation for foundation in all sorts of soil inclu.
yellow sandy gravelly soils, soft & hard murrum etc.
in dry condition inclu. depositing the excavated stuff
7 in uniform layers in banks or as and where directed Cu.M 362.00 102.40
etc. complete for lead up to 500 m and all lift. (BY
MACHINERY) Excluding dewatering
Item Item of work Unit Qty. Rate Amount (Rs.)
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel
reinforcement. (c) C. C. Nominal Mix, M-15 and
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel
reinforcement. (f) C. C. Nominal Mix, M-20 and
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where
9 necessary hooking etc. complete as per drawing for MT 2.903 82019.00
all leads and lifts.TMT/CRS (FE 500D)
Providing and fixing in position(different diameter)
I.S. NP-3 class reinforced pipe with caulking the
joints with cement mortar 1:1 proportion, using jute
string soaked in cement slurry, finishing joints and
laying pipes to the designed grade and levels, curing
etc. complete for all leads and lifts. g. NP-3 class
1200 mm dia pipe
Providing and laying plain / reinforced cement
concrete lining of Nominal Mix, M-15, (MSA-20
mm) in bed, side slopes and curvature, including
mixing, transporting, placing, vibrating, smooth
11 finishing, curing, including dewatering where Sq.M 751.80 369.50
(MANUALLY WITH CONVENTIONAL MIXER ) (A)
cm thick lining in bed/slope - with water curing
Back filling the foundation trenches around the
structures etc. with selected excavated stuff
12 including watering, ramming, compacting etc. Cu.M 116.00 36.90
complete. (By Machinery)
Item Item of work Unit Qty. Rate Amount (Rs.)
Earth work in embankment using selected soil, soft
& hard murrum excavated from approved borrow
area / village tanks etc. Including conveying,
spreading in uniform layers, breaking clods and
13 dressing to the designed canal section etc. with lead Cu.M 1751.00 110.80
upto 500m and all lifts
(for canals having capacity up to 300 Cusec) ( By
Compaction for making embankment for canal by
laying in regular layers of 15 cm in thickness
14 including breaking clods to 25 mm size incl. light Cu.M 1751.00 27.70
rolling by suitable rollers with slight watering to
facilitate rolling&and
Manufacturing dressingofthe
Supplying sideCapacity
5 MT slopes etc.
15 lift Hoist Assembly with hoist fixing Bolts, nuts & Nos. 1.00 153537.00
Operating handle etc.
Manufacturing & Supplying MS Screw rod, LC rod,
16 Coupler set. (as per Drawings & Specifications) Nos. 1.00 19891.00
New/ Repairing of steel gate including providing
basic steel material; MS Shaft plate, angles, channels
17 etc. inclu. Fabrication transporting to site & erection Kg 562.00 127.20
and painting etc. complete.
Rs. Thirty Eight Lac Ninety Seven Thousand Seventy Two & Seventy One Paise Only
I/ We am/ are willing to carry out the work at……………………………. % above/ below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my/ our tender works out as under.
Estimated amount Estimated amount
Deduct : ______ % Below Rs. _______________ Add: ______ % above Rs.
Net Tender amount Rs. ______________ Net Tender amount Rs.
Note 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Note 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC 10/ 2017/ CementConsumption/ 16/ C, Date. 11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design, the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer
Nadiad Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Front Page.pdf
2 Tender Notice.pdf
3 SBD Book.pdf
4 BOQ.pdf
5 Cement Requirement.pdf
6 Steel Requirement.pdf
7 Prise Escalation.pdf
8 Other Specations.pdf
9 Itemwise Spec.pdf
10 Test Schedule.pdf
11 920 ft drawing.pdf
12 Tender Notice 22 of 2025-26.pdf
Download all tender documents and submit your bid