| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance | +5.21% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹26.1 L+₹69,903.43 (2.76%)Admitted-Fee/PreQual/Technical/Finance | +8.11% | ₹26.1 L+₹69,903.43 (2.76%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.1 L
EMD Value
₹48,209
Closing Date
7 Sept 2026, 3:00 pmClosed
Executive Engineer PWD R and B Kumarghat Division
Executive Engineer PWD R and B Kumarghat Division
Development of the road from NH 208 to NH 208 via Tapan Paul house L 600 00 mtr under Scheme for Special Assistance to States for Capital Investment for 2026 27 SH Soling Metalling WBM Carpeting etc
2026_CEPWD_76519_1
38/EE/KD/2026-27
Open Tender
Civil Works - Roads
Percentage
90 days
Kumarghat
As per DNIT
4 documents required · 4 mandatory
₹1,000
₹48,209
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
31 Aug 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Flat Brick soling
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN
as per MoRD Technical Specification Clause 412. | - | sqm | 579.1 | - |
| 2 | Brick edging laid length wise
Providing and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and crosssection shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | - | mtr | 86.1 | - |
| 3 | 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508.
Case - I : By Manual Means
(i) Bitumen of VG-30 | - | sqm | 336.8 | - |
| 4 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510.
A) By Manual Means
Case - IV : Type D (premix with fine sand)
(i) Bitumen of VG-30 | - | sqm | 77.1 | - |
| 5 | WBM Grading-3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density 'Grading 3' as per MoRD Technical Specification Clause 405.
A) By Manual Means. | - | cum | 8,452.2 | - |
| 6 | Tack coat using hot straight run bitumen of grade VG-30 on W.B.M.
Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On W.B.M. @ 0.75 kg/ sqm. | - | sqm | 55.2 | - |
| 7 | Tack coat using hot straight run bitumen of grade VG-30 on bituminous surface
Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per specifications: On bituminous surface @ 0.50 Kg/ Sqm. | - | sqm | 41 | - |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. | - | cum | 245.4 | - |
| 9 | Providing and placing polythene (of minimum wall thickness of 500 micron) bags filled with 1:8 cement mortar (1 cement : 8 fine sand of minimum quantity of 0.0204 cum i.e, 60% of polythene cement bag) and properly manually stiched to avoid any leakage of cement mortar as per direction of the Engineer-in-charge. | - | Nos | 80.92 | - |
stage.html
html • 0.02 MB
finance_77895.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.26 MB
38DNIT_merged.pdf
Tender Documents • 2.96 MB
BOQ_77895.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .