Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | L1 | Accepted-AOC Due to lowest bidder | |
| 2 | L2₹2.9 L+₹35,134 (13.5%)Rejected-Finance | L2 | Rejected-Finance Due to higher bidder | |
| 3 | L3₹3.1 L+₹49,188 (19.0%)Rejected-Finance | L3 | Rejected-Finance Due to higher bidder |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
20 Nov 2020, 11:00 amClosed
Executive Engineer
Executive Engineer DMC Dharamshala
Addition and completion of Community Bhawan and C/o roof of Community Bhawan in village Trapra in GP Khanyara Ward No.15
2020_UDDHP_42094_20
4491-96 DMC
Open Tender
Civil Works - Buildings
Item Rate
90 days
Dharamshala
Please refer tendercument
9 documents required · 9 mandatory
₹350
Comm. DMC Dharamshala
₹4,000
29 Sept 2021
6 Nov 2020
20 Nov 2020
6 Nov 2020
20 Nov 2020
6 Nov 2020
Amount
Providing form work with steelplates 3.15mm.thick weldedwith angle iron in frame 30x30x5mm. so as to give afair finish includingcentring, shuutering,strutting and propping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Floors etc.upto 200mm. in thickness including carriage of material in all leads and lift and direction of Engineer-in-charge
Providing form work with steelplates 3.15mm.thick weldedwith angle iron in frame30x30x5mm. so as to give afair finish includingcentring, shuutering,strutting and propping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in edges of slab & breaks in floors and walls under 20 cm wide including carriage of material in all leads and lift and direction of Engineer-in-charge
Providing form work with steelplates 3.15mm.thick weldedwith angle iron in frame 30x30x5mm. so as to give afair finish includingcentring, shuutering,strutting and propping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Beams, cantilever, girders and lintels.Sides and soffits of beams,beam haunchings, cantilevers, bressumers and lintels notexceeding 1 Mtr. in depth in all heights from floor including carriage of material in all leads and lift and direction of Engineer-in-charge
Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :Suspended Floor roofs, landing andshelves and their support balconies,beams,girders,bressumers and contilever upto floor twolevel including carriage of material in all leads and lift and direction of Engineer-in-charge
Providing Tor steel reinforcement for R.C.C. Work including bending, binding and placing in position complete upto floor two level including carriage of material in all leads and lift and direction of Engineer-in-charge
Brick work using common burnt clay building bricks in Super-structure above plinth level upto floor two level in Cement Mortar 1:6 (1 Cement : 6 Sand) .Second Class Bricks including carriage of material in all leads and lift and direction of Engineer-in-charge
Brick work using common burnt clay building bricks in columns pillar posts in Square and rectangular pillars in super structure above plinth level upto floor two level in Cement Mortar 1:6 (1 Cement : 6 Sand) .Second Class Bricks including carriage of material in all leads and lift and direction of Engineer-in-charge
RAKESH RANA
anuj gupta
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .