| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 CrAdmitted-Finance UNIT NO 17 GROUND FLOOR RECTANGLE 1 DISTRICT CENTRE SAKET NEW DELHI 110017 | NEW DELHI | SOUTH DELHI | DELHI | 110017 | ₹10.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.9 CrAdmitted-Finance SHOP NO 1 PAVAPURI APARTMENTS 9TH KHETWADI LANE MUMBAI 400004 | MUMBAI | MUMBAI | MAHARASHTRA | 400004 | ₹10.9 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V N ENGINEERING COMPANY L1 | N K SHAH INFRAPROJECTS L2 |
|---|---|---|---|---|---|
| 1.00Non Schedule Items | |||||
| 1.01 | De-silting of existing sewer by installation of adequate number of over pumping system, providing and laying temporary rising main from upstream to working length for the smooth flow/bye pass of the sewerage system to avoid flood in the adjoining area, desilting of sewer line with mechanical device like super sucker machine ,taking out rubbish debris. silt etc . Including leak proof stacking arrangement as per technical specification and its safe disposal with in municipal limits as directed by the Engineer-in charge . Scope of work includes supply of all material , labour ,tools and plants, temporary power connection with stand by Gen-set of sufficient capacity , gas detector , forced air ventilators etc. and provision of safety equipment`s as guidelines lain in IS - 11972 (1987) / international standers , traffic control arrangements and proper lighting at night , barricading , display of sign boards , insurance of work man , cleaning of site , disposal of surplus earth / malba as directed by Engineer In Charge , Removal of all hindrances / obstructions and other unforeseen items. (B) Rehabilitation of existing pipeline by MWSL Structural Lining method including site survey, plugging and flow diversion, cleaning, prelining CCTV, Repair of Defects, prelining measurement, designing, site preparatory work, installation of MWSL Liner, jointing, grouting, Post Lining CCTV and measurement, including dewatering, repair of manholes, testing and commissioning and restoration of roads and surfaces all
inclusive as per IndSTT: 203-2022 code of practice for Machine Wound Spiral Lining Technique suiting Indian
Conditions. 900 mm brick circular sewer | 1,500 | Per Metre | 68,000 ₹10.2 Cr | 72,500 ₹10.9 Cr |
Tender Value
₹9.9 Cr
EMD Value
₹19.9 L
Closing Date
12 May 2026, 3:00 pmClosed
DINESH GABA
Yamuna Nagar PHED No.2
strenthening of existing sewerage using MWSL liner of existing brick sewer 900mm circular brick sewer 1500 meter node 1- 2-3 and all other works contingent thereto
2026_HRY_517949_1
202656E3D501 C4F5 467F 8535 A91C685CC128548PUH
Open Tender
Civil Works
740 days
Yamunanagar
3 documents required · 3 mandatory
₹15,000
₹19.9 L
Yes
Yamuna Nagar
5 Jun 2026
27 Apr 2026
12 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Non Schedule Items | ||||||
| 1.01 | De-silting of existing sewer by installation of adequate number of over pumping system, providing and laying temporary rising main from upstream to working length for the smooth flow/bye pass of the sewerage system to avoid flood in the adjoining area, desilting of sewer line with mechanical device like super sucker machine ,taking out rubbish debris. silt etc . Including leak proof stacking arrangement as per technical specification and its safe disposal with in municipal limits as directed by the Engineer-in charge . Scope of work includes supply of all material , labour ,tools and plants, temporary power connection with stand by Gen-set of sufficient capacity , gas detector , forced air ventilators etc. and provision of safety equipment`s as guidelines lain in IS - 11972 (1987) / international standers , traffic control arrangements and proper lighting at night , barricading , display of sign boards , insurance of work man , cleaning of site , disposal of surplus earth / malba as directed by Engineer In Charge , Removal of all hindrances / obstructions and other unforeseen items. (B) Rehabilitation of existing pipeline by MWSL Structural Lining method including site survey, plugging and flow diversion, cleaning, prelining CCTV, Repair of Defects, prelining measurement, designing, site preparatory work, installation of MWSL Liner, jointing, grouting, Post Lining CCTV and measurement, including dewatering, repair of manholes, testing and commissioning and restoration of roads and surfaces all
inclusive as per IndSTT: 203-2022 code of practice for Machine Wound Spiral Lining Technique suiting Indian
Conditions. 900 mm brick circular sewer | 1,500 | Per Metre | 1 | ₹1,500 | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_596825.xls
BOQ • 0.23 MB
OT0157477.pdf
Other Document • 0.40 MB
Download all tender documents and submit your bid