Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹17,547
Closing Date
2 Sept 2023, 3:00 pmClosed
Executive Engineer, RD Agartala Division
O/o the EE, RD Agartala Division, Gurkhabasti
Construction and Decoration of Temporary shed for VIPs, Audience shed, providing and fitting fixing of LED Screen in connection with inauguration of National Skill Training Institute for Women (NSTIW) at Anandanagar, West Tripura
2023_CERDD_41286_1
7/DECO/EE/RDAD/2023-2024 Dated 25/08/2023
Open Tender
Civil Works
Item Wise
5 days
As per DNIT
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹17,547
4 Sept 2023
28 Aug 2023
2 Sept 2023
28 Aug 2023
2 Sept 2023
28 Aug 2023
Construction of temporary single GCI sheet roof shed (Superstructure) for VIP Stage and audience shed of height range 10ft to 15ft and size of shed as per instruction and l.80m interval intermediate post 75 mm to 100mm dia Barak bamboo post, post plate, rafter, purline top & bottom for GCI sheet roofing tying with Gl Wire/rope including the cost of loading unloading and caring tying, fitting fixing complete as per direction of Eng- in Charge (No GCI sheet will be supplied by the Department). The interval of barak bamboo posts not more than 1.80mtr in longer direction and 3.00mtr in shorter direction of the shed as per direction. (After completion of the programme, the agency will be bound to dismantle the construction within 3(three) days with his/her own cost. For that, extra charge will not be claimed by the concerned agency. The dismantled of construction materials will be the asset of the concerned agency)
Making, providing and fitting fixing of wooden structure with 50x25mm wooden battens in frames of fascia (size-4ft height and length as per stall size around the shed) and fixed in position with necessary nails, screws & Gl wire covered by new cloth (By-Colour or Tri-colour as decided by authority) as per direction of Eng-in-charge. (After completion of the programmee, agency will be bound to dismantle the construction within 3(three) days with his/her own cost. For that, no extra charge will be claimed by the concerned agency. The dismantled of construction materials will be the asset of the concerned agency)
Decoration of ceiling, side screen, view curter etc. with new cloth (By-Colour or Tri-colour as decided by authority) including necessary bamboo/wooden structure including fitting fixing complete for VIP stage/Audience shed etc. as per direction of Engineer-in-charge.
Providing and fitting fixing of wooden platform for Stege, Selfee Point & steps etc by using wooden post(Size-0.10mx0.10m), runner(size- 0.076m x0.076m) ,wooden plank(thickness-0.04m) or 12mm ply wood fixed on wooden plank by nails and necessary horizontal & diagonal bracing (height ofthe stage up to 8ft) complete as per direction of Eng-in-charge. (after completion of programme materials will be concern agencies).
Construction of temporary urinal point (size 1.2m x 1.20m x 1.80 m) at diffrernt location in mela ground by using double layer dhari mat wall & shutter of door with split bamboo battens 40mm wide including tying with Gl wire irrection in position, fitting fixing etc. and 2 nos bricks for foot step with a sock pit point (size 0.9m dia and 1.20m depth) and covered by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per direction of Eng-in-charge.(After completion of programmee materials will be the assets of concern agencies)
Construction of temporary VIP toilet with Commode by using 6mm thick ply wood wall & floor, Wooden structure, PVC door and irrection in position, fitting fixing and painting as per required shed with provision for door shutter & locking arrangement etc. and excavation of pit 0.75 m dia and 1.20m depth incl. cover of pit by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per directionof Eng-in-charge.(after completion of programmee materials will be concern agencies).
Hiring Charge of Carpet including laying and fixing in position by maintaining proper column & rows including loading unloading and carrying complete as per direction of Eng-in-charge.
Hiring charges for supplying and fitting fixing in position LED Wall Panel of (size 20ft x 10ft) including all necessary accessories (Camera, Sound mixer etc.) including loading unloading and carrying complete as per direction of Eng-in-charge.
Hiring charges for supplying and fitting fixing in position LED TV of (size 52") including all necessary accessories including loading unloading and carrying complete as per direction of Eng-in-charge.
Making, providing and fitting fixing of Standee of size 3ft x 3ft x 6ft box type over a 4ft x 4ft x 2ft base made by wooden structure with 50x25mm wooden battens in frames and fixed in position with necessary nails, screws & Gl wire covered by good quality Flex including the cost of printing & fitting-fixing complete as per approved design of concern authority and placed in location as per direction of Eng-in-charge.
Making, providing and fitting fixing of Banner of various size Standee of size made by wooden structure with 50x25mm wooden battens in frames and fixed in position with necessary nails, screws & Gl wire covered by good quality Flex including the cost of printing & fitting-fixing complete as per approved design of concern authority and placed in location as per direction of Eng-in-charge.
Flower decoration of Stage, Podium and Centre table by providing flower garden front side of stage with leaf & flower, decoration of podium by kaccha flower and providing flower vass over centre table as per direction of Eng-in-charge.
Hiring charges for Podium and placing in position including loading unloading and carrying complete as per direction of Eng-in-charge.
Hiring charges for providing and fitting fixing of Tarpaulins for screen, view curter etc. with including necessary bamboo/wooden structure including fitting fixing complete as per direction of Engineer-in-charge.
Making of Gate of 2-piller with 1-straight top superstructure by Barak Bamboo post incl. digging of hole (size:- 15ft clear opening & height-15ft clear) and the gate's both pillar & top will be 2.00 ft square size & bracing space will be 2.00ft and all junction will be tied with coir rope/GI wire as per direction of Eng-in-charge. (After completion fair materials will be the assets of concern agencies)
Making of Overhead Gate/Road Cross Gate of 3-piller with 1-straight top superstructure by Barak Bamboo post incl. digging of hole (size:- 18ft clear opening & 75ft long) and the gate's all the pillar & top will be 2.00 ft square size & bracing space will be 4ft and all junction will be tied with coir rope/GI wire as per direction and decoration of gate with wooden structure of required size/shape including fitting fixing of screen/flex (flex design and writeup as approved by the authority) in position at front & back side and other two side will be covered by new cloth on wooden frame and decoration as approved and as per direction of the Engg-in-Charge.of Eng-in-charge. (After completion fair materials will be the assets of concern agencies)
Hiring Charges of plastic chair with cover (Armless/With Arm) including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Hiring charges of Cooler including fitting-fixing in position by maintaining proper connection without leakage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge. (after completion of fair materials will be concern agencies).
Hiring charges of LED Light up to 50Watt including fitting-fixing in position by maintaining proper connection without leckage etc. in cluding carrying, loading-unloading complete as per direction of Eng-in-charge. (after completion of fair materials will be concern agencies).
Hiring charges of Ceilling Fan including fitting-fixing in position by maintaining proper connection without leckage etc. in cluding carrying, loading-unloading complete as per direction of Eng-in-charge. (after completion of fair materials will be concern agencies).
Hiring charges of Stand Fan including fitting-fixing in position by maintaining proper connection without leckage etc. in cluding carrying, loading-unloading complete as per direction of Eng-in-charge. (after completion of fair materials will be concern agencies).
Hiring Charges of TFDPC made wooden armed chair with white towel & cushin including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Hiring Charges for Executive class sofa with white towel & cushin including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Hiring Charges for Centre table made with glass top including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Char
Hiring Charges of VIP round dining table with double cover desired by the authority including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Hiring Charges of Diesel Generator (20KVA) with necessary fuel and operator complete including the cost of laying in position and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Bamboo barricade
3B)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----MMC area
3C)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Jirania NP area
3D)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Ranirbazar MC area
3E)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Jirania RD Block area
3F)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Mandwi RD Block area
3G)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Old Agartala RD Block area
3H)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Belbari RD Block area
3I)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----MohanpurRD Block area
3J)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Bamutia RD Block area
3K)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Dukli RD Block area
3L)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Hezamara RD Block area
3M)Earth cutting by mechanical device & disposal of soil within 100 mtr incl. makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge.----Lefunga RD Block area
4A)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----AMC area
4B)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----MMC area
4C)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Jirania NP area
4D)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Ranirbazar MC area
4E)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Jirania RD Block area
4F)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Mandwi RD Block area
4G)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Old Agartala RD Block area
4H)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Belbari RD Block area
4I)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----MohanpurRD Block area
4J)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Bamutia RD Block area
4K)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Dukli RD Block area
4L)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Hezamara RD Block area
4M)Earth cutting by mechanical device & disposal of soil beyond 100mtr including makes the surface smooth & maintaining required slope as per direction of Engineer-In-Charge----Lefunga RD Block area
5A)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----AMC area
5B)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----MMC area
5C)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Jirania NP area
5D)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Ranirbazar MC area
5E)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Jirania RD Block area
5F)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Mandwi RD Block area
5G)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Old Agartala RD Block area
5H)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Belbari RD Block area
5I)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----MohanpurRD Block area
5J)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Bamutia RD Block area
5K)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Dukli RD Block area
5L)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Hezamara RD Block area
5M)Hiring charge of JCB etc for excavation of different types of soil/dismantled of existing structure/clearing of debris/ garbage Departmentally (including fuel, Driver & other charges, etc. complete). ----Lefunga RD Block area
6A)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----AMC area
6B)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MMC area
6C)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania NP area
6D)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Ranirbazar MC area
6E)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Jirania RD Block area
6F)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Mandwi RD Block area
6G)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Old Agartala RD Block area
6H)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Belbari RD Block area
6I)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----MohanpurRD Block area
6J)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Bamutia RD Block area
6K)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Dukli RD Block area
6L)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Hezamara RD Block area
6M)Hiring charge of Tripper/ Truck for lifting of available excavated earth to filled up the depression/ embankment within 1( one) Km as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges etc. complete)----Lefunga RD Block area
7A)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----AMC area
7B)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MMC area
7C)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania NP area
7D)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Ranirbazar MC area
7E)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Jirania RD Block area
7F)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Mandwi RD Block area
7G)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Old Agartala RD Block area
7H)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Belbari RD Block area
7I)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----MohanpurRD Block area
7J)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Bamutia RD Block area
7K)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Dukli RD Block area
7L)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Hezamara RD Block area
7M)Hiring charge of JCB etc for excavation of different types of soil by Departmentally (including fuel, Driver & other charges etc. complete). Working of 8 hours will be considered per day----Lefunga RD Block area
8A)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----AMC area
8B)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MMC area
8C)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania NP area
8D)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Ranirbazar MC area
8E)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Jirania RD Block area
8F)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Mandwi RD Block area
8G)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Old Agartala RD Block area
8H)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Belbari RD Block area
8I)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----MohanpurRD Block area
8J)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Bamutia RD Block area
8K)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Dukli RD Block area
8L)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Hezamara RD Block area
8M)Hiring charge of Tripper /truck etc for lifting of available excavated earth to filled up the depression/ embankment as per instruction of Eng- In – Charge (including loading /unloading, fuel, Driver & other charges) working of 8 hours will be considered as per day----Lefunga RD Block area
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .