| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr Quoted ₹1.1 Cr | L1 | Accepted-AOC L1 |
Tender Value
₹1.0 Cr
EMD Value
₹50,000
Closing Date
19 Sept 2023, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Public Health Circle Kerala Water Authority Thiruvananthapuram
AMRUT 2 Providing Sewerage Lines in various areas for connecting lines already laid in Amrut 1 in block L J K I Trunk main from Akkulam pump houseSewerage Work
2023_KWA_601824_1
93/2023-24/KWA/PHC/D4/TVM(RT3)
Open Tender
Civil Works - Water Works
Item Rate
60 days
Akkulam
Pls refer NIT
7 documents required · 7 mandatory
₹6,508
₹50,000
Yes
6 Dec 2023
12 Sept 2023
20 Sept 2023
12 Sept 2023
19 Sept 2023
12 Sept 2023
12 Sept 2023 - 19 Sept 2023
Amount
Cost of pipe and specials
100.98.147:Supply of HDPE Pipe PE 100 (IS 4984/1995), 8kg, 450mm Outer Dia.
Pipe line works through HDD method
OD64167/2023-2024:Conveying 450mm HDPE pipe from stack yard to site up to 10Km distance by mechanical transport including loading, unloading and stacking using Crane; DSR 1.1.16.11 = 8440 per 100m pipe upto 10km distance
OD64169/2023-2024:Installation of HDPE -450mm Dia ,pipe by horizontal directional drilling method in all types of soil including rock above /below water table for gravity sewer including preparing ,setting up the plant and equipment ,installing new pipe ,testing and commissioning including the cost for butt jointing the pipe ,other civil works such as preparing the entry pipe and exit pit as per requirement, dewatering, drilling, stringing reaming ,pulling back the new pipe on the designed alignment and monitoring by approved guidance system, including wastage of pipe proper disposal of fluid/bentonite slurry, proper back filling of pits and holes by approved borrow materials as per specification, approved method statement or directed by Engineer in charge
OD64691/2023-2024:Charges for providing crane for the lifting/pulling of HDPE pipes if necessary
OD64750/2023-2024:Transporting 450mm HDPE pipes and specials. Loading and unloading 450 mm dia HDPE Pipes having length 12 m/each at KWA store yard and work site(15km average ) respectively including hire charges of crane at both sites, Charges of man coolies for assisting etc complete.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
Construction of manholes
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD64263/2023-2024: Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches of manholes or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 M for depth exceeding 1.5 m, but not exceeding 3 m
OD64266/2023-2024: Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches of manholes or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 M for depth exceeding 3 m, but not exceeding 4.50 m
OD67572/2023-2024:Earthwork in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches of manholes or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m for depth exceeding 4.5 m
OD64289/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches of manholes or drains (not exceeding 6.0 m m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 M for depth exceeding 4.5 m, but not exceeding 6 m.
OD67586/2023-2024: Earthwork in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches of manholes or drains (not exceeding 6.0 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m for depth exceeding 4.5 m
OD64529/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches of manholes or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 M for depth exceeding 6m, but not exceeding 7.50 m.
OD67613/2023-2024: Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches of manholes or drains (not exceeding 7.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 M for depth exceeding 6m, but not exceeding 7.50 m.
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete.
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.98.1008:Engaging Coolie.
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
OD64337/2023-2024:Centering and shuttering including strutting propping etc and removal of form etc for Cover slab (including 20% extra for circular works)
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design
OD64685/2023-2024:Mechanical transport of red earth,gravel,sand & stone aggregate etc below 40mm nominal size for 5km including loading, unloading and stacking.
100.52.S.1:Sub Data for providing Earth filled cement bags including cutting of the Earth, filling, conveying and placing in position.
Road restoration
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Bidder Name
SAMEER ALI CT
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_894893.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .