Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC S O SH SANGAT SINGH R O SHASTRI NAGAR WARD NO 11 P O DHALPUR DISTT KULLU | ₹2.6 L Quoted ₹4.9 L | L1 | Accepted-AOC WORK EXECUTED BY CONTRACTOR AND FINAL BILL PAID |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance other than lowest bidder |
| 3 | L3₹5.2 LRejected-Finance | ₹5.2 L | L3 | Rejected-Finance other than lowest bidder |
| Sl No | Description | Qty | Unit | Davinder Pal Singh L2 | RANVIR SINGH L1 | Praveen Kumar L3 |
|---|---|---|---|---|---|---|
| 1.01 | Excavation in foundations trenches etc. (for pipes and pits ) upto all depths in all kinds of soil such as pick work,jumper work, (for laying of pipes 3 mtrs average length for each joint) blasting and chiselling soft/hard rocks where blasting is prohibited in all leads and lifts including trimming and dressing of sides levelling of bed to correct excavation and returning the stacked soil after laying jointing and testing of HDPE.Pipes in trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting/timbering and dewatering where ever required including restoration of un-metalled/metalled paved surface of its original conditions including cost of diversion for traffic night signals fixing caution Boards and fencing etc.complete in all respects. | 118.9 | Cum | 600 ₹71,340 | 538 ₹63,968.20 | 605 ₹71,934.50 |
| 2.00Restoration of Rain damage by Providing, Lowering Laying , jointing and testing of HDPE pipes (confirming to IS 4984-2016)in proper position by butt fusion joiting procedure including hydraulic testing as per revevent IS code complete with all material of jointing prodedure like butt fusion welding machine with hydraulic jack including all fitting and accessories e.g.coupling, Tees, bends reducer, screwes,adopters, flabged, tall pieces etc. omplete in all respect and in all leads and lifts. | ||||||
| 2.01 | 75mm dia PN-8.00 PE- 100.00. | 1,100 | Rmt | 400 ₹4.4 L | 388 ₹4.3 L | 405 ₹4.5 L |
Tender Value
₹3.4 L
EMD Value
₹6,880
Closing Date
17 Sept 2025, 11:20 amClosed
Executive Engineer Jal Shakti Division Thunag
O/O Executive Engineer Jal Shakti Division Thunag Distt Mandi HP
Providing, laying, jointing and testing of HDPE Pipes of dia 75 mm dia 1100 Rmt to restore the WSS Bagsiad GO Villages, WSS Dhansal Nallah to Kaligarh Bara, Aug. of various WSS of GP Tandi Saroa
2025_HPIPH_114607_1
4906-30 DT 11/09/2025
Open Tender
Civil Works - Water Works
30 days
KELODHAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹6,880
Yes
16 May 2026
12 Sept 2025
17 Sept 2025
12 Sept 2025
17 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
form6.pdf
Tender Documents • 0.87 MB
form8.pdf
Tender Documents • 1.01 MB
TCA.pdf
Tender Documents • 0.23 MB
BOQ_167118.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid