Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-Finance | ₹2.3 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹2.3 Cr−₹22,081.45 (0.10%)Accepted-Finance | ₹2.3 Cr−₹22,081.45 (0.10%) | L2 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | M/s Mido Enterprise L2 | M/S TABING CONSORTIUM PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Demolishing brick work in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 540 | Cum | 1,123.1 ₹6,06,474 Lowest | 1,123.1 ₹6,06,474 Lowest |
| 2.00 | Taking out doors, windows and clerestory windows shutters (steel or wood) including stacking within 50 m lead. b) Of area beyond 3 Sq.m | 25 | Each | 110 ₹2,750 Lowest | 110 ₹2,750 Lowest |
| 3.00 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 m lead.b)For thickness of tiles above 25 mm and up to 40 mm | 48 | Sqm | 68.1 ₹3,268.8 Lowest | 68.1 ₹3,268.8 Lowest |
| 4.00 | Dismantling cement, asbestos, celotax or other ceiling or partition hard board partition wall including stacking of serviceable materials and disposal of unserviceable materials within 50 m lead. | 450 | Sqm | 32.5 ₹14,625 Lowest | 32.5 ₹14,625 Lowest |
| 5.00 | Dismantling precast concrete or stone slabs in wall, partition walls etc including stacking within 50 m lead. | 91 | Sqm | 159.2 ₹14,487.2 Lowest | 159.2 ₹14,487.2 Lowest |
| 6.00 | Dismantling ballies in posts, purlins or rafters including stacking within 50 m lead. | 210 | Mtrs | 11.5 ₹2,415 Lowest | 11.5 ₹2,415 Lowest |
| 7.00 | Dismantling GI sheet roofing including ridges, hips, valleys and gutters etc and stacking the material within 50 m lead. | 264 | Cum | 95 ₹25,080 Lowest | 95 ₹25,080 Lowest |
| 8.00 | Dismantling wood work of sectional area 40 Sq.cm. and above wrought, framed and fixed in frames, other frames and trusses including stacking the material within 50 m lead. | 1.69 | Cum | 2,640.4 ₹4,462.28 Lowest | 2,640.4 ₹4,462.28 Lowest |
| 9.00 | Demolishing RCC work including stacking of steel bars and disposal of un-serviceable materials within 50 metres lead. | 36.7 | Cum | 1,933.8 ₹70,970.46 Lowest | 1,933.8 ₹70,970.46 Lowest |
| 10.00 | Demolishing cement concrete 1 : 4 : 8 or leaner mix including disposal of material within 50 m lead. | 45 | Cum | 819.6 ₹36,882 Lowest | 819.6 ₹36,882 Lowest |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
31 Jul 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer Central Division APHWCL
Upgradation of Police Station Building at Ruksin
2026_APP_3590_1
PH/EC/EE(CD)/E-NIT/2025-26/04
Open Tender
Civil Works
Item Rate
Ruksin
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Executive Engineer Central Division APHWCL
₹2.3 L
Executive Engineer Central Division APHWCL
21 Sept 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
31 Jul 2026
24 Jul 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 540 | Cum | 100 | ₹54,000 |
| 2 | Taking out doors, windows and clerestory windows shutters (steel or wood) including stacking within 50 m lead. b) Of area beyond 3 Sq.m | 25 | Each | 100 | ₹2,500 |
| 3 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 m lead.b)For thickness of tiles above 25 mm and up to 40 mm | 48 | Sqm | 10 | ₹480 |
| 4 | Dismantling cement, asbestos, celotax or other ceiling or partition hard board partition wall including stacking of serviceable materials and disposal of unserviceable materials within 50 m lead. | 450 | Sqm | 10 | ₹4,500 |
| 5 | Dismantling precast concrete or stone slabs in wall, partition walls etc including stacking within 50 m lead. | 91 | Sqm | 10 | ₹910 |
| 6 | Dismantling ballies in posts, purlins or rafters including stacking within 50 m lead. | 210 | Mtrs | 10 | ₹2,100 |
| 7 | Dismantling GI sheet roofing including ridges, hips, valleys and gutters etc and stacking the material within 50 m lead. | 264 | Cum | 10 | ₹2,640 |
| 8 | Dismantling wood work of sectional area 40 Sq.cm. and above wrought, framed and fixed in frames, other frames and trusses including stacking the material within 50 m lead. | 1.69 | Cum | 10 | ₹16.9 |
| 9 | Demolishing RCC work including stacking of steel bars and disposal of un-serviceable materials within 50 metres lead. | 36.7 | Cum | 10 | ₹367 |
| 10 | Demolishing cement concrete 1 : 4 : 8 or leaner mix including disposal of material within 50 m lead. | 45 | Cum | 10 | ₹450 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
SBD_PS_Ruksin.pdf
Tender Documents • 3.86 MB
BOQ_3820.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .