| 1 | L 1₹18.4 CrAccepted-Finance R O VPO DAULATPUR CHOWK TEHSIL GHANARI DISTRICT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L 1 | Accepted-Finance L 1 | |
| 2 | L 2₹21.2 Cr+₹2.8 Cr (15.2%)Rejected-Finance | L 2 | Rejected-Finance L 2 |
Tender Value
₹20.4 Cr
EMD Value
₹40.7 L
Closing Date
11 Aug 2025, 10:30 amClosed
Executive Engineer
Executive Engineer HPPWD Divsion Nadaun
Construction of Building portion including Water Supply Sanitary Installation, Septic tank, Rain Water Harvesting System, approach road site developemnt etcetera.
2025_PWD_111210_1
Construction of Construction of 50 Bedded Critical Care Unit hospital at Medical College Hamirpur at
Open Tender
Civil Works - Buildings
Percentage
540 days
Nadaun
Please refer Tender documents.
16 documents required · 16 mandatory
₹30,000
Executive Engineer Nadaun
₹40.7 L
14 Aug 2025
29 Jul 2025
11 Aug 2025
29 Jul 2025
11 Aug 2025
29 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or overall areas in earth work such as pick work, jumper work, blasting work, jumper blasting work soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting is prohibited, chiseling or any other mixed variety of soil, including shoring, strutting or bailing out water upto any depth or any height quantum of water including dewatering removal of slush and stacking the serviceable and unserviceable material clear from the edge of excavation and as per direction of Engineer-In-Charge and returning the stacked soil in 15 cm (Fifteen centimetre) layers, when required into plinths, side of foundation etcetera consolidating each deposited layer by ramming watering and then disposing of all excavated earth as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | 1 | Per cubic metre | 390.9 | ₹390.51 |
| 2 | Excavation work by mechanical means (hydraulic excavator)/ manual in all height and depths and in all kind of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rocks, chiseling/ wedging out of rock (where blasting is prohibited) and their intermediate classification of soil , setting out true to the required line, grades, width, cutting and trimming of side slopes as shown in the drawing and if water is met with in the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailling out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-In-Charge and disposal all surplus excavated soil in acquired width or at an approved dumping site including its stacking leveling dressing including all lead and lifts by head load, mechnical transportation or by any oyher mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HP PWD specification. Any loss to the public/ private property during the course of execution and disposal of unserviceble meterial shall be the absolute responsibility of the contractor which shall have to be compensated by him in all case. The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | - | Per cubic metre | 194.2 | - |
| 3 | Excavating trenches of required width for pipes, cables, etcetera including excavation for sockets, and dressing of sides, ramming of bottoms, upto any depth including getting out the excavated soil, then returning the soil as required, in layers not exceeding 20 cm (Twenty centimetre) in depth, including consolidating each deposited layer by ramming, watering, etcetera and disposing of surplus materials/excavated soil as per specification, approved drawing, design, specification and as per the entire satisfaction of Engineer-In-Charge, including carriage of material within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. . | - | Per Running metre | 152.7 | - |
| 4 | Supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | 1 | Per cubic metre | 1,505.4 | ₹1,503.89 |
| 5 | Providing & Filling in plinth with hard stone under floors, including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per cubic metre | 1,410.5 | - |
| 6 | Providing and filling with stone boulder behind retaining walls of selected hard stone complete including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | 1 | Per cubic metre | 1,225 | ₹1,223.78 |
| 7 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:5:10 (One cement isto five sand isto ten graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in foundation and plinth complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per Cubic metre | 4,228.5 | - |
| 8 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:4:8 (One cement isto four sand isto eight graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in foundation and plinth complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per Cubic metre | 4,538.1 | - |
| 9 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:3:6 (One cement isto three sand isto six graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in foundation and plinth complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per Cubic metre | 4,925.2 | - |
| 10 | Providing and laying 110mm (one hundered ten millimetre) diametre with working pressure not less than 4.00 kg/cm2 (four point zero kilogram per centimetre square) ISI marked PVC pipe weep holes in brick masonry/stone masonry, plain reinforced concrete, Abutments, Wing walls, Return walls and retaining/breast walls extended through the full width of the structure with slope I(V):20(H)(One vertical : Twenty Horizontal) towards draining face complete as per drawing and MORD technical specification section 700 and 1200 and as per direction of Engineer-In-Charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkhana, toll tax, GST and any other taxes imposed by the Government. | - | Each | 292.2 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_162171.xls
BOQ • 1.61 MB
176963677.pdf
Tender Documents • 0.52 MB
176963689.pdf
Tender Documents • 0.58 MB
176963737.html
Tender Documents • 0.07 MB
177487161.pdf
Tender Documents • 0.91 MB
SBD.pdf
Tender Documents • 8.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .