Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance L1 |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 Cr
EMD Value
₹3.7 L
Closing Date
28 Apr 2026, 5:00 pmClosed
General Manager
Main Administrative Building Sector-6 Noida
O/M of Sewer line and MSPS/SPS at Expressway (Shifting of Deep Sewer Line due to Construction of Under pass at Chanage 6.10 KM Near Sector- 108 Noida Gr. Noida Expressway) Noida
2026_NOIDA_1139967_1
14/SM(JAL-OA)/25-26
Open Tender
Civil Works - Others
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹3.7 L
22 May 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
28 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : bituminous road | - | Sqm | - | - | |
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - | |
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. The Contractor has detect defferent utilities like sewer line, water supply line electric cable, Telephone cable, Gas pipe line etc, using utility detecting machine before start of excavation and shall start excavation only after getting prior permission of E/I. All kinds of soil. a) 0 to 1.50 m | - | M³ | - | - | |
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil.
for 1.5 - 3.0 M depth | - | M³ | - | - | |
for 3.0 - 4.50 M depth | - | M³ | - | - | |
for 4.50 - 6.00 Mdepth | - | M³ | - | - | |
for 6.00 -7.50 M depth | - | M³ | - | - | |
for 7.50 -9.00 M depth | - | M³ | - | - | |
for 9.00 -10.50 M depth | - | M³ | - | - | |
Extra rates for quantities of works, executed: in or under water and/or liquid mud, including pumping out water as required @ rate 20 % of excuted qunatity of excavation /banking excavated 7.50 to 9.0 m depth (Item No-2 (f) rate @ 20% ) | - | M³ | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_2128548.xls
BOQ • 0.30 MB
TD.pdf
Tender Documents • 2.45 MB
C.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid