| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹5.9 L+₹19,565.02 (3.45%)Rejected-AOC | ₹5.9 L+₹19,565.02 (3.45%) | L2 | Rejected-AOC Highest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not submitted documents establishing financial capacity and experience |
Tender Value
₹5.9 L
EMD Value
₹14,700
Closing Date
24 Mar 2026, 3:00 pmClosed
Executive Engineer, PMU, Tirur
KSEB Limited, Vydyuthi Bhavanam, Pookayil (P.O), Thazhepalam, Tirur - 676107
Construction of 11kV OH line using covered conductor and 100kva transfromer at Pathrasumpadi under ES Kadampuzha
2026_KSEB_844789_1
2025-26/6155/112/06.03.2026
Open Tender
Electrical Works
Percentage
90 days
Kadampuzha
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,416
₹14,700
1 Aug 2026
10 Mar 2026
27 Mar 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
10 Mar 2026 - 22 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Additional rate for excavation of Pit for A type pole in Soft Rock. | 7 | No | 1,955 | ₹13,685 |
| 2 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)
0.45x0.45x1.5m, Plastering (1:3) 12mm
0.45x0.45mx5sides. | 7 | Trip | 4,028.29 | ₹28,198.03 |
| 3 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 23 | No | 762.14 | ₹17,529.22 |
| 4 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 22 | No | 868.77 | ₹19,112.94 |
| 5 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 1 | No | 2,795.55 | ₹2,795.55 |
| 6 | Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock. | 14 | E | 2,606.32 | ₹36,488.48 |
| 7 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA
Transformers / Ring Main Units excluding loading& unloading charges. | 1 | No | 3,142.26 | ₹3,142.26 |
| 8 | Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. | 1 | No | 7,153 | ₹7,153 |
| 9 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 18 | No | 1,373.73 | ₹24,727.14 |
| 10 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. | 20 | No | 1,303.68 | ₹26,073.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_1428448.xls
BOQ • 0.28 MB
TENDERDOC.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .