| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L | L1 | Accepted-AOC AS PER BOARD RESOLUTION |
| 2 | L2₹8.0 L+₹65,856.61 (8.96%)Rejected-AOC | ₹8.0 L+₹65,856.61 (8.96%) | L2 | Rejected-AOC AS PER BOARD RESOLUTION |
| 3 | L3₹8.3 L+₹90,340.50 (12.3%)Rejected-AOC COMPLETION WORK AND ELECTRIFICATION OF TAKE A BRAKE COMFORT STATION ELECTRIFICATION GENERAL ELECTRICAL WORK | ₹8.3 L+₹90,340.50 (12.3%) | L3 | Rejected-AOC AS PER BOARD RESOLUTION |
| Sl No | Description | Qty | Unit | RAFEEKH KP L3 | ABRAHAM P THOMAS L2 | SAFEER S K L1 |
|---|---|---|---|---|---|---|
| 1.00Road Concrete | ||||||
| 1.00 | 3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 30 | cum | 14.71 ₹441.3 | 14.27 ₹428.1 | 13 ₹390 Lowest |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 30 | cum | 3,055.73 ₹91,671.9 | 2,965.12 ₹88,953.6 | 2,720 ₹81,600 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 45 | cum | 8,729.78 ₹3,92,840.1 | 8,470.93 ₹3,81,191.85 | 7,775 ₹3,49,875 Lowest |
| 2.00Compound Wall | ||||||
| 2.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 20.88 | cum | 328.35 ₹6,855.95 | 318.62 ₹6,652.79 | 290.6 ₹6,067.73 Lowest |
| 2.00 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 20.88 | cum | 7,377.73 ₹1,54,047 | 7,158.96 ₹1,49,479.08 | 6,550 ₹1,36,764 Lowest |
| 2.00 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 14.08 | metre | 208.24 ₹2,931.19 | 202.06 ₹2,844.2 | 185 ₹2,604.06 Lowest |
| 2.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 4.18 | cum | 8,272.31 ₹34,545.17 | 8,027.11 ₹33,521.21 | 7,300 ₹30,484.8 Lowest |
| 2.00 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 17.4 | cum | 8,183.2 ₹1,42,387.68 | 7,940.55 ₹1,38,165.57 | 7,333 ₹1,27,594.2 Lowest |
Tender Value
₹8.4 L
EMD Value
₹21,107
Closing Date
23 May 2026, 4:00 pmClosed
ASSISTANT ENGINEE NADAPURAM GP
OFFICE OF THE ASSISTANT ENGINEER LID AND EW SECTION NADAPURAM GRAMA PANCHAYATH KALLACHI
GENERAL Project No 513 25 26 Nadapuram Buds School Road Concrete Ward no 22 in Nadapuram Gramapanchayath Ward no 22 in Nadapuram GP General Civil Work
2026_LSGD_851285_1
T12026-27/AE/LSGD/NDPM
Open Tender
Civil Works - Roads
Item Rate
365 days
NADAPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,865
Yes
₹21,107
Yes
2 Jul 2026
15 May 2026
26 May 2026
15 May 2026
23 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Concrete | |||||
| 1.001 | 3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | - | cum | - | - |
| 1.002 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | - | cum | - | - |
| 1.003 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | - | cum | - | - |
| 2Compound Wall | |||||
| 2.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 2.002 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 1 | cum | - | - |
| 2.003 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | - | metre | - | - |
| 2.004 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 2.005 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438360.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
EPAY.pdf
Tender Documents • 0.23 MB
BOQ_1438360.xls
BOQ • 0.30 MB
AFFI.pdf
Tender Documents • 0.24 MB
FOT.pdf
Tender Documents • 0.25 MB
FEE.pdf
Tender Documents • 0.27 MB
PRELI.pdf
Tender Documents • 0.25 MB
IPC.pdf
Tender Documents • 0.23 MB
SBD.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .