Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC KIZHAKKAKKARA HOUSE PALAKUZHA P O MUVATTUPUZHA KERALA | ERNAKULAM | KERALA | 680667 | L1 | Accepted-AOC Lowest quoted amount | |
| 2 | L2₹7.7 L+₹36,009.21 (4.91%)Rejected-Finance | L2 | Rejected-Finance second Lowest | |
| 3 | L3₹7.8 L+₹48,527 (6.62%)Rejected-Finance | L3 | Rejected-Finance Third Lowest | |
| 4 | L4₹8.0 L+₹65,426.73 (8.92%)Rejected-Finance | L4 | Rejected-Finance fourth Lowest |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
13 Apr 2022, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Irrigation Sub Division, Piravom-686664
Side protection of works
2022_Irrig_485655_1
01/AEE/I/ 2022-23
Open Tender
Civil Works - Others
Item Rate
180 days
Near Puthupady Lift Irrigation Scheme
Please refer tender documents.
6 documents required · 6 mandatory
₹2,500
₹13,000
Yes
30 May 2022
6 Apr 2022
19 Apr 2022
6 Apr 2022
13 Apr 2022
6 Apr 2022
6 Apr 2022 - 12 Apr 2022
Amount
KADAVU
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.3 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelCold twisted bars
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
60.2.1 : EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
60.7.6 : Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7 : Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
SHAJI FRANCIS
CIJO JOHN
Benny O.M.
Bidder Name
UNNIKRISHNAN K S
Benny O.M.
CIJO JOHN
SHAJI FRANCIS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .