| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41,822.85Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹42,798.70+₹975.85 (2.33%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹41,823
EMD Value
₹1,046
Closing Date
18 Mar 2025, 5:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer Kangazha
KANGAZHA GRAMA PANCHAYATH PRO NO 263/2024-2025-CONSTRUCTION OF SOAK PIT IN KRISHI BHAVAN
2025_LSGD_748763_1
T6/AE/LSGD/KA/2024-25
Open Tender
Civil Works - Buildings
Item Rate
Kangazha
Please refer Tender documents.
10 documents required · 10 mandatory
₹335
₹1,046
25 Sept 2025
11 Mar 2025
19 Mar 2025
11 Mar 2025
18 Mar 2025
11 Mar 2025
Amount
CONSTRUCTION OF SOAK PIT IN KRISHI BHAVAN
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
50.18.9.8.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 75 mm dia 6 Kgf/ cm2
50.18.9.9.1:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of Joints complete as per direction of engineer in charge.110 mm dia 6Kgf/cm2
OD413797/2024-2025:Supplying and filling 20mm aggregate
OD413798/2024-2025:Supplying and filling 40mm aggregate
OD413799/2024-2025:Supplying and filling 63mm aggregate
J A CONSTRUCTIONS (BID ID -2161368)
Bidder Name
J A CONSTRUCTIONS
SAJANA HARIS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1211003.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .