Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
6 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deepthi
Power Grid Corporation of India Ltd SRTS-I HQ Kavadiguda Main Road Secunderabad 500080 Telangana State
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
SR1/NT/MISC/DOM/B00/22/00506
Open
Electrical - All
Works
NABL Accredited Test Lab
₹1.1 L
6 Dec 2022
6 Dec 2022
6 Jan 2023
6 Dec 2022
6 Jan 2023
6 Dec 2022
: Attachments : General guidelines for filling up the Attachments Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
SPEC. NO.: SR-I/C&M/WC-2851/2022
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3, 4, 5, 6, 7, 8 and Bid Form are included here.
3 Attachment 1 Bid Security : To be submitted as per proforma provided in the Bidding Document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
8 Attachment 20: Unequivocal consent of the proposed Associate(s) for the purpose of executing the 'Second Contract' and /or 'Third Contract' as an independent Contractor (applicable to foreign bidder) : No specific format is provided by POWERGRID. Bidder may use their own format.
9 Attachment 21: Capacity, Capability and Experience of Proposed Associate(s) (applicable for foreign bidder) : No specific format is provided by POWERGRID. Bidder may use their own format.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
SPEC. NO.: SR-I/C&M/WC-2851/2022 Sole Bidder
Enter the details of the bidder below:
Specify type of Bidder Sole Bidder
2 or more 2 or more
Name of the Bidder 1
Address of Registered Office 2 or more
Name of Manufacturer
Address of Registered Office
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-3
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
(Work Completion Schedule)
Bidders Name & Address To
Name : Contracts & Materials Department
Address : Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad - 500 080
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject package i.e., Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of Contract
Date : Printed Name :
Place : Designation :
Note: Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-4
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
Alternative, Deviations and Exceptions to the Provisions
Bidders Name & Address To
Name : Contracts & Materials Department
Address : Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad - 500 080
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-5
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidders Name & Address To
Name : Contracts & Materials Department
Address : Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad - 500 080
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Note: The information in similar format should be furnished for each partner of joint venture in case of joint venture bid.
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-5
(Information regarding Ex-employees of POWERGRID in our Organisation)
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-5
(Information regarding Ex-employees of POWERGRID in our Organisation)
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-6
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
(Declaration regarding Social Accountability)
Bidders Name & Address To
Name : Contracts & Materials Department
Address : Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad - 500 080
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-10
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
Bidders Name & Address To
Name : Contracts & Materials Department
Address : Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad - 500 080
Integrity Pact is annexed herewith this Volume.
Date : Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
having its Registered Office at ,
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions Package and Specification Number SPEC. NO.: SR-I/C&M/WC-2851/2022 POWERGRID values full compliance with all relevant laws and regulations, and the principles of economical use of resources, and of fairness and transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
(2) If Chairman and Managing Director obtains information on the conduct of any employee of POWERGRID which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, he will inform its Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to POWERGRID, or to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor will not commit any criminal offence under the relevant Anti-corruption Laws of India; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by POWERGRID as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a serious transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a serious transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures also exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The exclusion will be imposed for a minimum of 12 months and maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the exclusion prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID may forfeit the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III, POWERGRID may forfeit the Contract Performance Guarantee of this contract besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall declare in his Bid that no previous transgressions occurred in the last 3 years with any other Public Sector Undertaking or Government Department that could justify his exclusion from the tender process.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India, out of which one of the IEMs has been indicated in the NIT/IFB.
(2) The IEM is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. He has right of access to all project documentation. The IEM may examine any complaint received by him and submit a report to Chairman-cum-Managing Director, POWERGRID, at the earliest. He may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act. However, for ensuring the desired transparency and objectivity in dealing with the complaints arising out of any tendering process, the matter shall be referred to the full panel of IEMs, who would examine the records, conduct the investigations and submit report to Chairman-cum-Managing Director, POWERGRID, giving joint findings.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEM information as sought by him which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(6) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-7
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
(Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises)
Bidders Name & Address To
Name : Contracts & Materials Department
Address : Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad - 500 080
I We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1 Name of the Supplier/ Contractor in whose favour payment is to be made
2 Address with PIN Code and State
Registered Office:
Correspondence Address:
3 Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
4 Permanent Account (PAN) No.
5 GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
6 Name of the States/UT GSTIN number
a Andhra Pradesh
7 PF Registration No. of the Company
8 PF Regional Office covered (with Address)
9 Name of Contact Person
10 Telephone No(s)
11 Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: 1
12 9 digit MICR code printed at bottom in middle, next to cheque no.
13 IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
Date : Printed Name :
Place : Designation :
SPEC. NO.: SR-I/C&M/WC-2851/2022 ATTACHMENT-9
Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions
Bidders Name & Address To
Name : Contracts & Materials Department
Address : Power Grid Corporation of India Ltd.,
Kavadiguda Main Road,
Secunderabad - 500 080
Further, we hereby confirm that except as mentioned in the Schedule – 4 (Alternative, Deviations and Exceptions to the Provisions) hereof and/or the Covering Letter,
(i) there are no discrepancies/inconsistencies and deviations/omissions/ reservations to the Bidding Documents, in the Second Envelope bid;
We also confirm that in case any discrepancies/ inconsistencies and deviations/ omissions/ reservations, as referred to in para (i) and (ii) above, the same shall be deemed as withdrawn/rectified without any financial implication, whatsoever to POWERGRID.
Date Printed Name
Place Designation
SPEC. NO.: SR-I/C&M/WC-2851/2022 Bid Form 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th 6 June
7 seven 7 th 7 July
To: 8 eight 8 th January 8 August
9 nine 9 th 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
Southern Region -I Headquarters 11 eleven 11 th 11 November
Kavadiguda Main Road 12 twelve 12 th 12 December
Secunderabad - 500080 (Telangana) 13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Testing of RLA Samples (Tower, Conductor, Disc insulators, hardware & Earthwire) of NR2, NR3, WR2 & ER2 Regions 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 16 sixteen 16 th
0.0 Having examined the Bidding Documents, including Amendments the receipt of which is hereby acknowledged, we the undersigned, offer to execute the work under the above-named package in full conformity with the said Bidding Documents. In accordance with the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Single Envelope” procedure of bidding. Accordingly, we hereby submit our Bid consisting of Techno – Commercial Part & Price Parts. 1 42353 the receipt of which is hereby acknowledged, we the undersigned, offer to execute the work under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Single Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part . 17 seventeen 17 th
0.0 Attachments to the Bid Form Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Enter details here. Pay Order 19 nineteen 19 th
Bid Security Currency Amount Validity of bid security in Months
(a) Attachment 1 Bid Security, Not Applicable Bank Guarantee Rs. 81000 4 Banks certified Cheque four 20 twenty 20 th
(b) Attachment 2 A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with relevant ITB clause Bank Guarantee (04) 21 st
(c) Attachment 3 Delivery & Work Completion Schedule 22 th
Not Applicable 24 th
(d) Attachment 4 The variation and deviations from the requirements of the Conditions of Contract, Bid Data Sheet and other commercial conditions, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter-alia, the cost of withdrawal of the variations and deviations indicated therein. 25 th
(e) Attachment 5 Information regarding Ex-employees of POWERGRID in our Organisation 26 th
(g) Attachment 6 Declaration regarding Social Accountability 29 th
(h) Attachment 7 Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
(i) Attachment 8 Declaration
(i) Attachment 9 Integrity Pact (in two Originals)
0.0 We are aware that our bid is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in the bid documents
0.0 We declare that as specified in Bidding Documents, the RATES of all the Goods to be supplied under this contract shall remain FIRM during the currency of the contract and no price adjustment shall be applicable..
0.0 We confirm that except as otherwise specifically provided our Bid Prices include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
0.9 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents
0.9 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
0.0 Construction of the Contract
0.9 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us Single Contract covering Goods and Related Services.
0.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) ITB 5 Bid Security
(b) GCC 53 Terms of Payment
(c) GCC 8.0 Performance Security
(d) GCC 6.0 Taxes and Duties
(e) GCC 11.0 Completion Time Guarantee
(f) GCC 36 Defect Liability
(g) GCC 16.5 Patent Indemnity
(h) GCC 56 Settlement of Disputes
(i) GCC 58 Arbitration
Further we understand that deviation taken in any of the above clauses by us shall make our bid non-responsive as per provision of bidding documents and rejected by you.
0.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification/Letter of Award to us, and to achieve the completion of works and related services within the time stated in the Bidding Documents.
0.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
0.0 We agree to abide by this bid for a period of Four (04) months from the date initially stipulated for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period
0.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
0.0 We understand that you are not bound to accept the lowest or any bid you may receive.
0.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
13.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
Eight Hundred Nine Hundred Three Hundred Six Hundred
Fifty Five Thousand Four Thousand Ten Thousand Ninety One Thousand 0 0 0 0 plus
One Lac Six Lac 0 0 0 1
1 One 1 One 1 One 1 One 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 1 1 1
4 Four 4 Four 4 Four 4 Four 1 0 0 0
5 Five 5 Five 5 Five 5 Five 1 0 0 1
6 Six 6 Six 6 Six 6 Six 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
1_1_Section-I Invitation for Bids (IFB).doc
doc • 0.34 MB
1_2_Section-II-ITB.doc
doc • 0.41 MB
1_3_Qualifying requirements.doc
doc • 0.04 MB
1_4_GCC.doc
doc • 3.20 MB
1_5_Section - VI Sample Forms and Procedures_SAS.doc
doc • 0.58 MB
Thumbs.db
db • 0.05 MB
BOQ.docx
docx • 0.02 MB
Technical specifications.pdf
pdf • 0.79 MB
Thumbs_1.db
db • 0.05 MB
~$nexure-I-Bid+securing+Declaration.docx
docx • 0.00 MB
First Envelope and Bid Forms.xls
xls • 1.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .