Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.3 LAccepted-AOC KOYADAN CHOYIKUNIMAL MULLAKODI PO MAYYIL KANNUR PIN 670602 | MAYYIL | KANNUR | KERALA | 670602 | ₹54.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹60.3 L+₹6.0 L (11.1%)Rejected-Finance | ₹60.3 L+₹6.0 L (11.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹63.1 L+₹8.9 L (16.4%)Rejected-Finance B 496 JAHANGIR PURI DELHI NORTH WEST DELHI 110033 | DELHI | NORTH WEST DELHI | DELHI | 110033 | ₹63.1 L+₹8.9 L (16.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹72.4 L+₹18.1 L (33.4%)Rejected-Finance | ₹72.4 L+₹18.1 L (33.4%) | L4 | Rejected-Finance L4 |
| 5 | L5₹73.2 L+₹18.9 L (34.9%)Rejected-Finance | ₹73.2 L+₹18.9 L (34.9%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | CIVILCO ENGINEERING P LTD L8 | SIGNATURE INTERIORS AND CONTRACTORS L4 | R. Sajikumar L7 | VIJAYAN R VIJAYA CONSTRUCTIONS L5 | Soman nambiar L1 | MOHD WAJID L3 | BLOSSOM CREATORS L6 | CHHAJWA CONSTRUCTION CO. L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 170.33 | sqm | 50 ₹8,516.3 | 400 ₹68,130.4 | 50 ₹8,516.3 | 77.2 ₹13,149.17 | 140 ₹23,845.64 | 60 ₹10,219.56 | 15 ₹2,554.89 Lowest | 40 ₹6,813.04 |
| 2.00 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 170.33 | sqm | 410 ₹69,833.66 | 600 ₹1,02,195.6 | 540 ₹91,976.04 | 398.35 ₹67,849.7 | 450 ₹76,646.7 | 300 ₹51,097.8 Lowest | 430 ₹73,240.18 | 300 ₹51,097.8 Lowest |
| 3.00 | Removing white or colour wash by scrapping and sand papering and preparingthe surface smooth including necessary repairs to scratches etc. complete | 52,328.68 | sqm | 10 ₹5,23,286.75 | 18 ₹9,41,916.15 | 18 ₹9,41,916.15 | 13.12 ₹6,86,761.53 | 5 ₹2,61,643.38 Lowest | 12 ₹6,27,944.1 | 14 ₹7,32,601.45 | 10 ₹5,23,286.75 |
| 4.00 | Finishing walls with water proofing cement paint of required shade :Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat ofprimer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat. | 1,231.12 | sqm | 90 ₹1,10,800.98 | 95 ₹1,16,956.59 | 100 ₹1,23,112.2 | 121.98 ₹1,50,167.34 | 75 ₹92,334.15 | 120 ₹1,47,734.64 | 220 ₹2,70,846.84 | 55 ₹67,711.71 Lowest |
| 5.00 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 170.33 | sqm | 50 ₹8,516.3 | 38 ₹6,472.39 | 55 ₹9,367.93 | 54.81 ₹9,335.91 | 25 ₹4,258.15 Lowest | 50 ₹8,516.3 | 27 ₹4,598.8 | 55 ₹9,367.93 |
| 6.00 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 170.33 | sqm | 155 ₹26,400.53 | 65 ₹11,071.19 Lowest | 95 ₹16,180.97 | 92.64 ₹15,779 | 90 ₹15,329.34 | 120 ₹20,439.12 | 105 ₹17,884.23 | 65 ₹11,071.19 Lowest |
| 7.00 | Finishing walls with Premium Acrylic Smooth exterior paint with Siliconeadditives of required shadeOld work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cementpaint surface | 52,964.68 | sqm | 124 ₹65,67,619.7 | 86 ₹45,54,962.05 | 100 ₹52,96,467.5 | 94.39 ₹49,99,070.85 | 75 ₹39,72,350.63 Lowest | 81 ₹42,90,138.68 | 94.5 ₹50,05,161.79 | 80 ₹42,37,174 |
| 8.00 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per
manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 676.84 | sqm | 210 ₹1,42,137.03 | 270 ₹1,82,747.61 | 218 ₹1,47,551.77 | 108.08 ₹73,153.19 | 90 ₹60,915.87 Lowest | 120 ₹81,221.16 | 215 ₹1,45,521.25 | 150 ₹1,01,526.45 |
| 9.00 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per
manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work | 142.32 | sqm | 205 ₹29,176.01 | 270 ₹38,426.94 | 218 ₹31,026.2 | 108.08 ₹15,382.16 | 90 ₹12,808.98 Lowest | 120 ₹17,078.64 | 215 ₹30,599.23 | 130 ₹18,501.86 |
| 10.00 | Removal of efflorescence and growth of fungus stuck to the surface by injection of water under pressure by means of water injecting machine (pressure washer with a capacity of above 120 bars pressure value)) where ever required at different location in plan and elevation including removing the dirt or fungus with scrapper or wire brush and preparing the surface smooth in all heights etc. complete as per the direction of engineer in charge | 4,606.28 | sqm | 10 ₹46,062.81 Lowest | 21 ₹96,731.9 | 35 ₹1,61,219.84 | 34.74 ₹1,60,022.2 | 15 ₹69,094.22 | 18 ₹82,913.06 | 43 ₹1,98,070.08 | 15 ₹69,094.22 |
Tender Value
₹80.4 L
EMD Value
₹50,000
Closing Date
25 Aug 2025, 5:00 pmClosed
Director
Regional Cancer Centre Medical College PO
Exterior painting works of Blocks A,B,C,D and E at Regional Cancer Center, Thiruvananthapuram
2025_RCC_782727_1
RCC/244/2024-H ENG/505
Open Tender
Paint / Enamel Works
Item Wise
180 days
RCC-TVM
Please refer Tender documents.
15 documents required · 15 mandatory
₹2,950
Yes
₹50,000
Yes
21 Nov 2025
5 Aug 2025
27 Aug 2025
5 Aug 2025
25 Aug 2025
6 Aug 2025
6 Aug 2025 - 25 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .