| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC | ₹18.0 L | L1 | Accepted-AOC lowest |
| 2 | L2₹19.1 L+₹1.1 L (6.33%)Rejected-AOC THIYYALI MARAKKARAKATH HOUSE PATTERKADAVU PO MALAPPURAM | MALAPPURAM | MALAPPURAM | KERALA | ₹19.1 L+₹1.1 L (6.33%) | L2 | Rejected-AOC Second lowest |
| 3 | L3₹19.8 L+₹1.8 L (9.97%)Rejected-Finance GOPURATHINGAL HOUSE ANGAMALY SOUTH ERNAKULAM 683573 | ERNAKULAM | KERALA | 683573 | ₹19.8 L+₹1.8 L (9.97%) | L3 | Rejected-Finance L3 Rejected |
Tender Value
₹20.8 L
EMD Value
₹50,000
Closing Date
5 Jun 2026, 4:00 pmClosed
AEE TSD Pattambi
Assistant Executive Engineer Transmission Sub Division Pattambi, Mini Vydyuthi Bhavanam Maruthur PO PIN 679306
Capacity addition 110/33 kV 16 MVA Transformer at 110kV SS Koppam- Equipment foundation work
2026_KSEB_852069_1
AEE/TSD/PTB/03/26-27/20-05-26
Open Tender
Civil Works - Others
Percentage
110 kV Substation Koppam
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
₹50,000
30 Jun 2026
20 May 2026
12 Jun 2026
20 May 2026
5 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DSR_2.26.1 - 2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (cost index(c) : 1.4445 included in Rate) | - | cub.m | 0.4 | - |
| 2 | DSR_2.7.1 - 2.7.1 : Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock (cost index(c) : 1.4445 included in Rate) | - | cub.m | 0.2 | - |
| 3 | DSR_4.1.8 - 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) (cost index(c) : 1.4445 included in Rate) | - | cub.m | 0.4 | - |
| 4 | DSR_7.1.1 - 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) (cost index(c) : 1.4445 included in Rate) | - | cub.m | - | - |
| 5 | DSR_5.9.1 - 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete (cost index(c) : 1.4445 included in Rate) | - | sq.m | 0.2 | - |
| 6 | DSR_5.9.6 - 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts (cost index(c) : 1.4445 included in Rate) | - | sq.m | 1 | - |
| 7 | DSR_5.9.2 - 5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (cost index(c) : 1.4445 included in Rate) | - | sq.m | 0.4 | - |
| 8 | DSR_5.22.6 - 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more (cost index(c) : 1.4445 included in Rate) | - | kg | 1 | - |
| 9 | DSR_5.1.2 - 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size (cost index(c) : 1.4445 included in Rate) | - | cub.m | 1 | - |
| 10 | C-202526-3711-4 - Fixing in position 90lbs rails and MS angles to the foundation of transformer plinth in correct line and levels as directed by the departmental officers at site. (Materials are supplied departmentaly) | - | qtl | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_1439724.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .