Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC Award | |
| 2 | L2₹4.9 L+₹10,141.69 (2.13%)Rejected-Finance | L2 | Rejected-Finance Other than Lowest | |
| 3 | L3₹5.0 L+₹21,239.25 (4.46%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | BILBIR SINGH L1 | Ramesh Kumar Chaudhary L3 | Vikram Guleria L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition above G.L. upto floor two level i/c disposal of unserviciable materials with in 20 metres lead and i/c cutting the necessary reinforcement ad separating out from RCC works:- | 5.43 | Cum | 2,300 ₹12,489 Lowest | 2,350 ₹12,760.5 | 2,300 ₹12,489 Lowest |
| 2.00 | Demolition stone masonry above GL upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials and disposal unserviceable materials with in 20 metres lead) in all leads and lifts. | 13.04 | Cum | 1,550 ₹20,212 Lowest | 1,650 ₹21,516 | 1,600 ₹20,864 |
| 3.00 | Excavation in foundation trenches etc in earth work lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required. into plinths, sides of foundations, etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres in pick Jumper work in all leads and lifts. | 4.5 | Cum | 595 ₹2,677.5 Lowest | 600 ₹2,700 | 595 ₹2,677.5 Lowest |
| 4.00 | Providing and laying cement concrete 1:4:8 (1Cement: 4 Sand) : 8 graded stone agg 40 mm nominal size) grade excluding the cost of centering and shuttering - All work up to plinth level. | 3.07 | Cum | 6,500 ₹19,955 Lowest | 6,550 ₹20,108.5 | 6,500 ₹19,955 Lowest |
| 5.00 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level (Through Rate) in all leads and lifts.Cement Mortar 1:6. | 6.52 | Cum | 8,850 ₹57,702 Lowest | 9,500 ₹61,940 | 9,000 ₹58,680 |
| 6.00 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level (Through Rate) in all leads and lifts.Cement Mortar 1:6.(Labour Rate). | 4.87 | Cum | 5,550 ₹27,039.6 Lowest | 5,600 ₹27,283.2 | 5,675 ₹27,648.6 |
| 7.00 | 15 mm cement plaster on rough side of single or half brick wall of mix 1:4 (1 cement : 4 coarse sand) in all leads and lifts. | 29.4 | Sqm. | 310 ₹9,114 Lowest | 400 ₹11,760 | 350 ₹10,290 |
| 8.00 | Centering and shuttering including strutting, propping etc and removal of form for all heights :-
Walls (any thickness) including attached pilasters. butteresses, plinth and string courses etc. | 27.6 | Sqm. | 520 ₹14,352 Lowest | 600 ₹16,560 | 570 ₹15,732 |
| 8.01 | Suspended floors, roofs, landings, balconies and access platform in all leads and lifts. | 8.55 | Sqm. | 765 ₹6,540.75 Lowest | 850 ₹7,267.5 | 810 ₹6,925.5 |
| 8.02 | Edges of slab and breaks in floors and walls under 20 cm wide in all leads and lifts. | 72.46 | Rmt. | 160 ₹11,593.6 Lowest | 200 ₹14,492 | 175 ₹12,680.5 |
Tender Value
₹4.8 L
EMD Value
₹9,550
Closing Date
26 Jul 2025, 5:00 pmClosed
Executive Engineer
JS Division Mandi
Raising of Manhole Chambers in various Wards of Mandi Town
2025_HPIPH_110329_1
4290-4320
Open Tender
Civil Works
Item Rate
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹9,550
20 Sept 2025
18 Jul 2025
28 Jul 2025
18 Jul 2025
26 Jul 2025
18 Jul 2025
Amount
Demolition above G.L. upto floor two level i/c disposal of unserviciable materials with in 20 metres lead and i/c cutting the necessary reinforcement ad separating out from RCC works:-
Demolition stone masonry above GL upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials and disposal unserviceable materials with in 20 metres lead) in all leads and lifts.
Excavation in foundation trenches etc in earth work lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required. into plinths, sides of foundations, etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres in pick Jumper work in all leads and lifts.
Providing and laying cement concrete 1:4:8 (1Cement: 4 Sand) : 8 graded stone agg 40 mm nominal size) grade excluding the cost of centering and shuttering - All work up to plinth level.
Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level (Through Rate) in all leads and lifts.Cement Mortar 1:6.
Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level (Through Rate) in all leads and lifts.Cement Mortar 1:6.(Labour Rate).
15 mm cement plaster on rough side of single or half brick wall of mix 1:4 (1 cement : 4 coarse sand) in all leads and lifts.
Centering and shuttering including strutting, propping etc and removal of form for all heights :- Walls (any thickness) including attached pilasters. butteresses, plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access platform in all leads and lifts.
Edges of slab and breaks in floors and walls under 20 cm wide in all leads and lifts.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5: 3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc above plinth level up to floor five level, excluding cost of centering, huttering. finishing and reinforcement in all leads and lifts.
Reinforced cement concrete work in beams suspended floors, roofs having slope up to 15º landings, balconies. shelves, chajjas lintels, bands, plain window sills. staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of entering, shuttering. finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Providing and laying in position cement concrete 1:2:4( 1Cement : 2 Sand) : 4 graded stone agg 20 mm nominal size) grade excluding the cost of centering and shuttering - All work up to plinth level in all leads and lifts.
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and Mild steel and Medium Tensile steel bars in all leads and lifts.
Providing & fixing precast concrete manhole cover & frame conforming to IS-12593-1988, part-I and IS 12592- 1991, part-II, 560 mm diameter. Extra Heavy duty
Heavy Duty
Medium Duty
Brick Work with common brunt clay machie moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in Superstructures above plinth level up to floor five in cement mortar 1:6 (1 cement : 6 coarse sand ). In all leads and lifts.
Vikram Guleria (BID ID -538535)
Ramesh Kumar Chaudhary (BID ID -538544)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .