Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | L2₹16.3 L+₹13,347.30 (0.83%)Rejected-Finance | L2 | Rejected-Finance L1 AGREEMENT EXECUTED. |
Tender Value
₹14.8 L
EMD Value
₹37,071
Closing Date
21 Mar 2023, 3:40 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
PWD ROADS DIVISION IDUKKI
GENERAL-GENERAL -RM-2022- 23/CLUSTER II/One year RC- Zone XXI - for various PWD Roads under Roads section Thodupuzha in Idukki District -2 road stretches for a length of 2.350 km
2023_PWD_564403_1
148/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
365 days
Thodupuzha
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹37,071
Yes
7 May 2023
7 Mar 2023
23 Mar 2023
7 Mar 2023
21 Mar 2023
7 Mar 2023
Amount
Apendix A: Reactave maintenance works
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
OD240551/2022-2023:Dru Rubble masonry including material and labour charges as per the direction of departmental officers
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD243170/2022-2023:PROviding and fixing of DLP board for Running contract work with non -retro reflectorised vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composit material sheeting 4 mm thick with area not exceeding 0.90 sqm,with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm below ground level including painting al exposed surafce with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc
Apendix B -Pre Monsoon works
2.3.1.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle -By Manual Means
OD242204/2022-2023:Supply Granular material at site
OD24202/2022-2023:Engaging coolie
OD24203/2022-2023:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
OD24204/2022-2023:Engaging JCB including fuel charges, Bata of driver and other all expenditure including etc. complete
OD240601/2022-2023:Supplying instant road repair mix to roads section Thodupuzha in packetswhich contains 25 kg of compounds
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
OD244489/2022-2023:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of Bitumen Emulsion (RS) using 36mm departmental broken stone and compacting with power roller to get a compact surface.. etc complete
Appendix C: Protective/Preventive maintenance works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD240680/2022-2023:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD.Type A :- By Manual Means
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
Appendix D: Emergency works
OD243059/2022-2023:Conduction and reporting routine inspection for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the deptl. officers at site. Additional RI may be required in response to reports, or complaints from police, other authorities and the public as result of major incidents, typhoon or flooding damages, etc, and are not measurable/payable. A proportion of RI should be carried out either during or immediately following a period of wet weather.
OD243060/2022-2023:Engaging excavator (JCB) for various purposes
OD243061/2022-2023:Engaging small tipper for removing the excavated materials , debris for various premonsoon works
OD243062/2022-2023:Engaging mazdoor
SUNNY KURIAN
Bidder Name
SUNNY KURIAN
SHIJU THOMAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_832240.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .