Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 CrAccepted-AOC | ₹23.3 Cr Quoted ₹19.8 Cr | L1 | Accepted-AOC Awarded being L1 and the offered rate is reasonable. |
| 2 | L2₹20.1 Cr+₹26.3 L (1.33%)Rejected-Finance | ₹20.1 Cr+₹26.3 L (1.33%) | L2 | Rejected-Finance Rejected not being L1 |
| 3 | L3₹36.6 Cr+₹16.8 Cr (84.8%)Rejected-Finance | ₹36.6 Cr+₹16.8 Cr (84.8%) | L3 | Rejected-Finance Rejected not being L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Please refer technical evaluation summary |
| 5 | Rejected-Technical AT PO GURUJANG PS TALCHER ANGUL ODISHA PIN 759100 | GURUJANG | ANGUL | ODISHA | 759100 | - | - | Rejected-Technical Please refer technical evaluation summary |
Tender Value
₹24.9 Cr
Closing Date
5 Oct 2021, 5:00 pmClosed
G.M.(EnM)/HOD, MCL
Office of the G.M.(EnM)/HOD, MCL HQ, Jagruti Vihar, Burla, Sambalpur-768020, Land-0663 2542973, Mob-9438494902
Comprehensive Annual Maintenance Contract for Operation, Maintenance, Cleaning of the complete CHP with SILO Plant at Bharatpur OCP of Bharatpur Area, MCL.
2021_MCL_216281_1
MCL/SAMB/EnM/e-Tender/ 2021-22/NIT-271,Dt.30.08.21
Open Tender
Miscellaneous Services
Item Rate
1095 days
Bharatpur OCP, Bharatpur Area, MCL, Talcher
As per NIT
6 documents required · 6 mandatory
Exempted
Office of the G.M.(EnM)/HOD, MCL HQ
28 Jan 2022
31 Aug 2021
7 Oct 2021
31 Aug 2021
5 Oct 2021
7 Sept 2021
31 Aug 2021 - 28 Sept 2021
6 Sept 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive Annual Maintenance Contract for Operation, Maintenance, Cleaning arrangement of the complete CHP with SILO including Rapid loading system with allied auxiliary facilities such as dust suppression system, passenger lift, firefighting system, conveyors, truck receiving hoppers, vibro feeders, plough feeder etc. at Bharatpur OCP, Bharatpur Area, MCL for a period of 3 years in accordance with NIT.
Note:- 1. The BOQ Quantity has been derived by adding the the annual dispatch quantity in three years (1st year-6.624 Million Tonne, 2nd Year- 11.924 Million Tonne, 3rd Year-11.924 Million Tonne). However, Payment will be made on basis of actual coal dispatch considering penalty charges etc. as per NIT. 2. Bidders are requested to quote their rate in per tonne of coal dispatch basis) | 0.53 | Tonne | - | - |
| 2 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
tech_eval
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_222822.xls
BOQ Document • 0.28 MB
82739245.pdf
Tender Document • 6.09 MB
82739247.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .