Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC Bidder is lowest |
| 2 | L2₹5.6 L+₹9,389.23 (1.69%)Rejected-Finance | ₹5.6 L+₹9,389.23 (1.69%) | L2 | Rejected-Finance Bidder is not lowest |
| 3 | L3₹5.8 L+₹27,768.14 (5.00%)Rejected-Finance | ₹5.8 L+₹27,768.14 (5.00%) | L3 | Rejected-Finance Bidder is not lowest |
| 4 | Rejected-Technical NONA ULUBERIA HOWRAH 711316 | ULUBERIA | HOWRAH | WEST BENGAL | 711316 | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹6.7 L
EMD Value
₹13,318
Closing Date
19 Aug 2026, 4:00 pmClosed
Cheif Executive Officer, SJDA
Near Passport Seva Laghu Kendra, Himanchal Vihar, Matigara, Pin 734010
Repairing of CC Roads at Bidhan Market and Seth Srilal market under SMC, Siliguri
2026_SJDA_1037452_1
NIT NO. 034/ ENGG/ 2026-27 OF SJDA
Open Tender
CIVIL WORKS
Percentage
45 days
Siliguri
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹13,318
Yes
8 Sept 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 32.36 | Cum | 2,951.19 | ₹95,500.51 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.84 | Cum | 4,305.4 | ₹3,616.54 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 32.36 | Cum | 10,112.1 | ₹3,27,227.56 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.13 | Cum | 10,966.7 | ₹1,00,125.97 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 37.12 | Sq. M. | 475.44 | ₹17,648.33 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars | 937.88 | KG | 129.85 | ₹1,21,783.72 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Form_No_2911.pdf
Additional Documents • 0.50 MB
BOQ_2548527.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .