Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.7 LAccepted-AOC KERALA KL | IDUKKI | KERALA | 685533 | 1 | Accepted-AOC Lowest Bid | |
| 2 | 2₹13.9 L+₹15,088.07 (1.10%)Rejected-Finance NOT AVAILABLE | 2 | Rejected-Finance Second Lowest | |
| 3 | 3₹14.1 L+₹36,274.34 (2.64%)Rejected-Finance | 3 | Rejected-Finance Third Lowest | |
| 4 | 4₹14.4 L+₹68,434.42 (4.99%)Rejected-Finance | 4 | Rejected-Finance Fourth Lowest | |
| 5 | 5₹14.5 L+₹76,077.04 (5.54%)Rejected-Finance | 5 | Rejected-Finance Fifth Lowest |
| Sl No | Description | Qty | Unit | BEST MATERIALS L5 | C.V.RAJESH L4 | PradeepkumarV L3 | Jaiju Jayaprakash L2 | Vineesh L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Annual Plan- 2023-24 Construction of Building for Anjangadi Subcentre Ward 1 - Vatanappally GP | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 30.49 | cum | 341.73 ₹10,420.03 | 339.93 ₹10,365.15 | 332.35 ₹10,134.02 | 327.35 ₹9,981.56 | 323.79 ₹9,873 Lowest |
| 1.00 | OD233324/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 4.47 | cum | 864.09 ₹3,862.48 | 859.54 ₹3,842.14 | 840.35 ₹3,756.36 | 827.71 ₹3,699.86 | 818.7 ₹3,659.59 Lowest |
| 1.00 | OD151818/2025-2026:DRY RUBBLE MASONRY- Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per direction of departmental officers at site. | 17.23 | cum | 3,793.79 ₹65,351.83 | 3,773.81 ₹65,007.65 | 3,689.56 ₹63,556.36 | 3,634.05 ₹62,600.15 | 3,594.51 ₹61,919.03 Lowest |
| 1.00 | OD173598/2025-2026:Random rubble masonry with hard stone in foundation and plinth with cement mortar 1:6 ( 1cement ,6 coarse sand) | 7.72 | cum | 7,164.63 ₹55,282.29 | 7,126.92 ₹54,991.31 | 6,967.79 ₹53,763.47 | 6,862.97 ₹52,954.68 | 6,788.3 ₹52,378.52 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.62 | cum | 7,536.25 ₹34,832.55 | 7,496.58 ₹34,649.19 | 7,329.19 ₹33,875.52 | 7,218.93 ₹33,365.89 | 7,140.39 ₹33,002.88 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 24.04 | cum | 302.55 ₹7,273.6 | 300.95 ₹7,235.14 | 294.23 ₹7,073.58 | 289.81 ₹6,967.32 | 286.65 ₹6,891.35 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 10.15 | sqm | 366.85 ₹3,722.79 | 364.92 ₹3,703.21 | 356.77 ₹3,620.5 | 351.41 ₹3,566.11 | 347.58 ₹3,527.24 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 11.06 | sqm | 724.74 ₹8,017.8 | 720.92 ₹7,975.54 | 704.82 ₹7,797.42 | 694.22 ₹7,680.16 | 686.66 ₹7,596.52 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.16 | cum | 9,964.33 ₹61,420.13 | 9,911.88 ₹61,096.83 | 9,690.57 ₹59,732.67 | 9,544.78 ₹58,834.02 | 9,440.94 ₹58,193.95 Lowest |
Tender Value
₹15.2 L
EMD Value
₹38,118
Closing Date
8 Sept 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
LID And EW Section, Vatanappally G P
Construction of Vanitha Fitness Center-Vatanappally GP-Pro No 129
2025_LSGD_788414_17
ET-02/AE/LID AND EW/VTY/2025-26
Open Tender
Civil Works - Buildings
Item Rate
365 days
Vatanappally Grama Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹38,118
Yes
23 Oct 2025
26 Aug 2025
9 Sept 2025
26 Aug 2025
8 Sept 2025
26 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1301460.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .