Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
2 Jun 2025, 6:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tarun Garg
GAS, Bharat Petroleum Corporation Limited
okay
21026
1000435997
Single Tender
Works
GAS
29 Nov 2025
19 May 2025
2 Jun 2025
19 May 2025
2 Jun 2025
19 May 2025
22 May 2025 - 26 May 2025
SUPPLY OF MOTOR DRIVEN VARIABLE
SUCTION COMPRESSORS FOR CITY
GAS DISTRIBUTION PROJECT
FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA
Project No. P.013751
Document No. P.013751 G11031 R029
Bharat Gas Resources Ltd,
TECHNICAL DOCUMENTATION
Commercial Vol I of II, Rev.
MAIN TABLE OF CONTENTS
SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION COMPRESSORS FOR CITY
GAS DISTRIBUTION PROJECT FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA (MAHARASHTRA)
S.No. Description Document / Drawing No. Rev. No. Pages Page No.
I VOLUME IA OF II COMMERCIAL
1 SECTION - I INVITATION FOR BID (IFB)
2 SECTION - II INSTRUCTION TO BIDDERS (ITB)
GENERAL CONDITIONS OF CONTRACT (GCC)
3 SECTION - III
GENERAL PURCHASE CONDITIONS (GPC) P.013751 G11031 R029 0 173 1 to
4 SECTION - IV SPECIAL CONDITIONS OF CONTRACT (SCC)
5 SECTION - V FORMS AND FORMATS
6 SECTION - VI SCHEDULE OF RATES (SOR)
II VOLUME II OF II TECHNICAL
TECHNICAL SPECIFICATION INCLUDING DATASHEET,
VENDOR LIST AND QAP
COMMERCIAL TENDER G11031
BHARAT GAS RESOURCES LIMITED
CITY GAS DISTRIBUTION PROJECT FOR AHMEDNAGAR
& AURANGABAD GA AND SANGLI & SATARA GA
SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION
COMPRESSOR FOR CITY GAS DISTRIBUTION
PROJECT FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA
TENDER DOCUMENT NO. P.013751 G11031 R029
0 05.11.2020 Poonam Khurana Saurabh Kumar Gursharan Singh Jhalli
Rev Date Subject of Revision Prepared By Checked By Approved By
COMMERCIAL TENDER G11031
TABLE OF CONTENTS
1. SECTION-I : INVITATION FOR BIDS (IFB)
2. SECTION-II : INSTRUCTIONS TO BIDDERS (ITB)
3. SECTION-III : GENERAL PURCHASE CONDITIONS (GPC) AND
GENERAL CONDITIONS OF CONTRACT (GCC)
4. SECTION-IV : SPECIAL CONDITIONS OF CONTRACT (SCC)
5. SECTION-V : FORMS AND FORMATS
6. SECTION – VI : SCHEDULE OF RATES
INVITATION FOR BIDS G11033
BHARAT GAS RESOURCES LIMITED
CITY GAS DISTRIBUTION PROJECT FOR AHMEDNAGAR
& AURANGABAD GA AND SANGLI & SATARA GA
SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION
COMPRESSOR FOR CITY GAS DISTRIBUTION
PROJECT FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA
INVITATION FOR BIDS (IFB)
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 1 of
INVITATION FOR BIDS G11033
TABLE OF CONTENTS
10.0 SUBMISSION OF ORIGINAL DOCUMENTS.............................................
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 2 of
INVITATION FOR BIDS G11033
INVITATION FOR BIDS (IFB)
FOR SUPPLY OF ELECTRIC MOTOR DRIVEN VARIABLE SUCTION RECIPROCATING CNG
COMPRESSOR PACKAGE WITH OPERATION AND COMPREHENSIVE MAINTENANCE FOR
THREE (03) YEARS FOR CGD PROJECT FOR AHMEDNAGAR & AURANGABAD AND SANGLI
& SATARA GA IN THE STATE OF MAHARASHATRA
OPEN DOMESTIC COMPETITIVE BIDDING
1.0 INTRODUCTION
1.1 M/s. Bharat Gas Resources Ltd. (BGRL) is developing CNG & City Gas Distribution Infrastructure in
the Geographical Areas (GA) Ahmednagar & Aurangabad and Sangli & Satara GA in the State of
Maharashtra based on PNGRB authorization.
1.2 Based on PNGRB authorization, M/s. Bharat Gas Resources Ltd. (BGRL) (hereinafter referred to as
‘BGRL’ or ‘Owner’) is developing CNG & City Gas Distribution Infrastructure in the Geographical Areas
(GA) of Ahmednagar & Aurangabad GA and Sangli & Satara GA in the State of Maharashtra for serving
consumers of various sectors namely domestic, commercial, industrial & automotive.
1.3 TRACTEBEL Engineering pvt. ltd. (TRACTEBEL), a subsidiary of TRACTEBEL Engineering S.A. has
been appointed as Project Management Consultant (hereinafter referred as Consultant), by BGRL for
providing Design, Engineering & PMC services for aforementioned project.
2.0 BRIEF DESCRIPTION OF PROJECT
2.1 The present project is implementation of CGD project in Ahmednagar & Aurangabad GA and Sangli &
Satara GA in the State of Maharashtra to ensure uninterrupted supply of natural gas to Domestic,
Commercial, Automobile and Industrial consumers.
2.2 TRACTEBEL, on behalf of BGRL, invites bids through single stage two envelopes system from eligible
bidders for Supply of Motor Driven Variable Suction compressors with Operation and Comprehensive
Maintenance for Three (03) years for City Gas Distribution Project for Ahmednagar & Aurangabad GA
and Sangli & Satara GA in the State of Maharashtra as defined in bid document.
3.0 BRIEF SCOPE OF WORK
PART – A - SUPPLY OF VARIABLE SUCTION COMPRESSOR
3.1 Scope includes Design, Engineering, Manufacturing, Assembly, string testing, packaging, supply,
erection, Inspection, Testing & Commissioning, Performance Acceptance Test of Electric Motor
driven Variable Suction Reciprocating CNG compressor package of 600 SCMH (4 Numbers)
Capacity as per the specifications.
3.2 Supply of Special Tools & Tackles to carry out Erection, Start-up, Commissioning and O&M
service of supplied package.
3.3 Installation, testing, commissioning and Performance Acceptance Test of each Electric Motor driven
Variable Suction Reciprocating CNG compressor package after intimation from BGRL.
3.4 For complete scope of work, all volumes of tender document are to be read.
PART – B – PROVIDING OPERATION AND MAINTENANCE SERVICES
3.5 Operation Services during Warranty Period i.e. One (01) year and further Two (02) years after
Warranty period.
3.6 Comprehensive Maintenance Services during Warranty Period i.e. One (01) year and further Two
(02) after Warranty period, inclusive of consumables and Spares.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 3 of
INVITATION FOR BIDS G11033
The above requirements are for CNG & City Gas Distribution Project of BGRL at Ahmednagar &
Aurangabad GA and Sangli & Satara GA in the State of Maharashtra. Description will be provided in the
MR and quantities are as given below :-
Brief Description Quantity in Nos.
Supply of Electric Motor driven Variable Suction
Reciprocating CNG compressor package of 600 SCMH
Capacity, suction pressure range 16kg/cm2(g) to 200 kg/cm2
(g) with discharge pr. of 255 kg/cm2 (g).
4.0 CONTRACT PERIOD
4.1 Supply: within 20 weeks from the date of LOI.
4.2 Services- Installation, Testing and Commissioning : 2 weeks from the date of intimation by BGRL.
4.3 Delivery Terms :
FOT BGRL Site, However, for Price Reduction Schedule applicability, date of LR will be
After commissioning of compressor package, Performance Acceptance Test will be carried out as per
technical specification.
4.4 Bidder shall provide operation & comprehensive maintenance during warranty period i.e. One (01) Year
and further for Two (02) years from the date of end of warranty. However maximum duration of contract
for operation and comprehensive maintenance during warranty and post warranty period shall be limited to
Thirty-Six (36) Months from the date of receipt of last compressor package at BGRL’s store or site
5.0 SUBMISSION OF BID & BID VALIDITY
5.1 Bids are required to be submitted only through BPCL e-procurement site at https://bpcleproc.in/ on or
before the Bid submission date and time.
5.2 Physical Bids / Offers or Bids through any other mode shall not be accepted. The Offers submitted through
e-tendering system, as above shall only be considered for evaluation and ordering.
5.3 Bid should be valid for 6 (Six) months from the date of scheduled bid submission.
6.0 BIDDING PROCEDURE
6.1 This is Open Domestic Competitive Bidding. Single stage two bid system is adopted for this tender.
7.0 DETAILS OF BID DOCUMENTS
7.1 Type of Enquiry Open Domestic Competitive Bidding
7.2 Tender Document Number BGRL E Tender No.–
TRACTEBEL Document No. - P.013751 G11031 R029
Availability of Tender Document
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 4 of
INVITATION FOR BIDS G11033
7.4 Bid document fee Not Applicable
7.5 Pre bid meeting date and venue 18.11.2020 at 1130 HRS. (IST) through conference call
Earnest Money Deposit / Bid
7.6 As per Clause No. 9 below
Bid Submission date and time of
7.7 Online submission of Bids (Bid 04.12.2020 till 1400 HRS. (IST)
Online Opening of Techno- 04.12.2020 at 1500 HRS. (IST) at TRACTEBEL Gurgaon
Commercial Unpriced Bid office
7.9 Price bid opening date and time Date and time shall be intimated later
The complete Bidding Document is available on BPCL website: https://bpcleproc.in and TRACTEBEL’s
website : www.tractebelindia.com
Bidders can view /download the tender document from the above website.
All amendments, time extension, clarifications etc. will be uploaded in the above websites only and will
not be published in Newspapers. Bidders should regularly visit the above web site to keep themselves
8.0 BID EVALUATION CRITERIA (BEC)–
I. The bidder must be a regular compressor manufacturer or packager and supplier of compressor
packages having the single point responsibility for manufacturing, supplying, installing and
commissioning of 600 SCMH or more SCMH Electric Motor Driven Compressor Packages /
Electric Motor Driven Variable Suction Compressor Packages handling hydrocarbon gases.
II. The bidder should have supplied installed & commissioned (either directly or through their
authorized packager or through sales & service dealers) at least 1 no. Electric Motor Driven
Compressor Packages of 600 or more SCMH capacity / Electric Motor Driven Variable Suction
Compressor Packages & these package should have completed continuous trouble-free
operation for minimum 4000 HRS in the last 10 years ending on the start date for
commencement of downloading this tender.
III. The bidder directly or through their authorized agencies, should have provided Operation &
Maintenance services to at least 1 no. Electric Motor Driven compressor packages / Electric
Motor Driven Variable Suction Compressor Packages of 600 SCMH or more SCMH capacity
for a period of not less than one year. The period for trouble free operation & maintenance
services shall be in the last ten years ending on the start date for commencement of downloading
IV. Any Compressor Block OEM fulfilling the criteria at I & II above, may also authorize their sales
& service dealer OR Packager to quote on their behalf subject to fulfilling the tender conditions.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 5 of
INVITATION FOR BIDS G11033
Minimum Average Annual Turnover during the immediately preceding three financial years should
be at least INR 1,86,03,000/-.
8.2.2 Net worth
The financial net worth of the bidder as per the audited financial results of immediately preceding
financial year should be positive.
8.3 Bidder shall not be on “Holiday” as per BGRL/PSU or its subsidiaries records, under liquidation,
court receivership or similar proceeding. Undertaking to this effect to be submitted by bidder.
8.4 Clarificatory notes to BEC
a) A job executed by a bidder for its own plant or projects cannot be considered as experience for
the purpose of meeting requirement of BEC of the tender. However, jobs executed for Subsidiary
or Fellow subsidiary or Holding company executed value against any single order fulfilling BEC
criteria will be considered as experience for the purpose of meeting BEC subject to submission of
tax paid invoice(s) duly certified by statutory auditor of the bidder and challan towards payments
of statutory tax in support of the job executed for Subsidiary or Fellow subsidiary or Holding
company. Such bidders to submit these documents in addition to the documents specified in the
bidding documents to meet BEC.
b) In case the bidder is executing a rate contract which is still running and the bidder has supplied
required quantities ending on last day of the month previous to the one in which tender is invited
as mentioned in the BEC-Technical, such experience will also be taken into consideration
provided that the bidder has submitted satisfactory supply records to this effect issued by the end
user or owner or Authorized consultant.
c) In case audited balance sheets and profit and loss account for the immediate preceding financial
year is not available for bid closing date up to 30th September, the Bidder has an option to submit
the audited balance sheets and profit & loss account of the three previous years immediately prior
to the last financial year.
d) For the bidder whose financial year is calendar year, for such bidders the audited financial results
for the year 2016, 2017 and 2018 shall be applicable in lieu of 2016-17, 2017-18 and 2018-19.
8.5 SPECIAL NOTES
(A) In case the bidder is the authorized sales and service dealer of the compressor block
OEM(Original Equipment Manufacturer) for sale of Electric Motor driven Variable
Suction Reciprocating CNG compressor package in India then,
(i) The bidder has to submit back-up authority letter specific to this tender from the compressor
block OEM, who has authorized them to market their product in India. Offers without back-
up authority letter from compressor block OEM will not be considered.
(ii) Mechanical Run Test (MRT) of compressor block & String Test of the compressor package
may be witnessed by Purchaser or Purchaser’s authorized agency at the manufacturing
facility of compressor block OEM.
(iii) A letter from compressor block OEM specific to the tender confirming parts and service
support to the Purchaser and the dealer for a period of 07(seven) years from the date of
supply shall be submitted along with the bid.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 6 of
INVITATION FOR BIDS G11033
(iv) Further, one compressor block OEM can quote only through one authorized dealer and an
authorized dealer shall offer product of only one compressor block OEM.
(B) In case the bidder is a packager in India authorized by Compressor Block OEM then,
(i) The bidder has to submit back-up authority letter from the respective compressor block OEM
who has authorized them to package CNG compressor in India using their block.
(ii) The compressor block OEM shall provide technical and after sales support to the Indian
Packager or purchaser for a period of ten years from the date of supply. A latest confirmation
by the compressor block OEM to this effect shall be submitted along with the bid.
(iii) The assembly of compressor at packager’s facility shall be carried out under the supervision
and quality control of compressor block OEM. In support of this the bidder shall submit
letter from compressor block OEM confirming the above. The packaging shop and the
infrastructure therein shall be approved by compressor block OEM.
(iv) All equipment or components or accessories or instrument etc. used by the packager for
packaging shall be from approved vendor list as listed in tender and balance of compressor
block OEM as those used by compressor block OEM for the packages supplied as per Clause
8.1 & Sub points at I), II), III) & IV) above.
(v) Mechanical Run Test (MRT) of the compressor block may be witnessed by Purchaser or
Purchaser’s authorized agency at the manufacturing facility of compressor block OEM.
(vi) The string test of complete package using Natural Gas may be witnessed by Purchaser or
Purchaser’s authorized agency and shall be conducted in the presence of compressor block
OEM by the Packager at their facility in India.
(vii) The required warrantee cover of the complete package shall be provided by Authorized
Packager and backed by compressor block OEM.
(viii)Further, one compressor block OEM shall authorize only one packager and a packager shall
offer compressor package of only one compressor block OEM.
8.6 Bids may be submitted by:
i) Bids may be submitted by an Entity (Sole domestic bidder) and must be duly registered with
GST. Sole domestic bidder should have completed 3 financial years after date of
commencement of Business.
ii) Bidding through JV or in a Consortium is not permitted.
iii) Sole bidder shall meet each requirement of the Bid Evaluation Criteria (BEC) as mentioned
8.7 Documents required to be submitted by bidder along with the bid for
qualification of BEC:
BEC Description Documents required for qualification
Bid Evaluation Criteria (BEC)-Technical
8.1 (I) Certificate ISO certificate, PESO approval or other documentary evidence
in support of requirement.
8.1 (II) Experience (a) Detailed work order along with Schedule of Rates.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 7 of
INVITATION FOR BIDS G11033
(b) Completion certificate issued by end user with compressors
(c ) Certificate from end user for successful operation of O&M
period of one year.
8.4 Note a) Jobs executed Tax paid invoice(s) duly certified by statutory auditor of the
for Subsidiary bidder and challan towards payments of statutory tax in
or support of the job executed for Subsidiary or Fellow subsidiary
Fellow or Holding company.
8.4 Note b) a) Detailed work order along with Schedule of Rates.
In case of rate
contract (b) Completion certificate issued by end user with compressors
(c ) Certificate from end user for successful operation of O&M
period of one year.
Bid Evaluation Criteria (BEC) -Financial
8.2.1 Annual Turn- Bidder(s) shall submit copy of Audited Annual Financial
over Statement [Balance Sheet and Profit & Loss Account
Statement along with its annexures] of last three (3) preceding
Financial Year(s) duly signed and stamped by a Statutory
auditor or TPI, as per BEC, along with un-price bid.
8.2.2 Net Worth Bidder(s) shall submit copy of Audited Annual Financial
Statement [Balance Sheet and Profit & Loss Account
Statement along with its annexures] of last audited Financial
Year duly signed and stamped by a statutory auditor or TPI, as
per BEC, along with un-price bid.
8.6 (i) GST Documentary Evidence for GST registration
Owner reserve the right to reject the bid without making any reference to the bidder.
i. Failure to meet the above qualifying criteria(s) will render the bid to be summarily rejected.
Therefore, the bidder shall in his own interest furnish complete documentary evidence
including certificate(s) from the client of the work executed etc. to justify that the bidder meets
the qualifying criteria.
ii. Authentication of Documents
All documents furnished by the bidder in support of meeting the Technical and Financial criteria of
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 8 of
INVITATION FOR BIDS G11033
Duly certified by Statutory Auditors of the bidder
Duly verified and certified by any one of the following independent third party inspection agency viz.
SGS / IRS / DNV GL / LRIS / EIL / TATA Projects / PDIL / ULIPL / RITES Ltd. / ITSIPL / Intertek
/ BVIS. All charges of the third party for attestations and verification shall be borne by the Bidders
for document verification. Bidder has to enclose the TPIA verification certificate duly signed &
stamped by Authorized signatory of TPIA.
8.8 All documents furnished by the bidder in support of meeting the Technical and Financial criteria of
BEC shall be submitted in a separate section / booklet along with their unpriced bid. This section /
booklet shall be titled as “Documentation against Bid Evaluation Criteria (Technical and Financial)”
with proper index and page numbering.
8.9 Submission of authentic documents is the prime responsibility of the Bidder. However,
Owner/Consultant reserves the right of getting the document cross verified, at their discretion from
the document issuing authority.
8.10 Owner reserves the right to complete the evaluation based on the details furnished (without seeking
any additional information) and / or in-house data, survey or otherwise.
9.0 BID SECURITY/ EMD
9.1 All bids must be accompanied with Bid Security amount of Rs. 250,000 (Indian Rupees Two Lakh and
Fifty Thousand only.
9.2 EMD shall be in favour of Bharat Gas Resources Limited and shall be acceptable in the form of Crossed
Demand Draft (Payable at Mumbai) or Bank Guarantees (B.G.) in the prescribed pro-forma from Scheduled
Commercial banks in India/ Indian Branch of Foreign Bank, EXCEPT YES BANK, CKP CO-OP BANK
and Punjab and Maharashtra CO-OP BANK (PMC). The B.G. shall be valid for a period of 6 months
from the final due date of submission of Bid with a claim period of 3 months.
9.3 Bidders are required to submit the EMD (in the prescribed format) in original at the time of bid submission
in sealed envelope and are required to upload the scanned copy of EMD on BPCL e-portal along with e-Bid.
EMD in original shall be submitted in a sealed envelope titled “Earnest Money Deposit for “SUPPLY OF
MOTOR DRIVEN VARIABLE SUCTION COMPRESSORS FOR CGD PROJECT FOR
AHEMEDNAGAR & AURANGABAD AND SANGLI & SATARA GA IN THE STATE OF
MAHARASHATRA at TRACTEBEL Engineering Pvt. Ltd., 37, Institutional Area, Sector 44, Gurgaon,
Haryana- 122002. Bidder must upload the scanned copy of EMD (in the prescribed format) on BPCL e-
procurement site along with the e-bid. Swift message / Cheque / Cash / NEFT / RTGS shall not be acceptable.
In case bidder fails to upload scanned copy of EMD on BPCL e-portal by the bid due date & time, such bids
shall not be considered for evaluation.
9.4 If the Bidder is unable to submit original EMD within the due date and time of Bid submission, he may
submit the same within 7 calendar days from the date of unpriced bid opening, provided scanned copy of the
same have been uploaded on E-Tendering website along with the bid. In case the Bidder fails to submit the
EMD in original within 7 calendar days, his bid shall be rejected, irrespective of their status / ranking in
tender and notwithstanding the fact that a copy of EMD were uploaded earlier by the Bidder.
9.5 Following categories of bidders shall be exempted from paying Earnest Money Deposit
• Units registered with National Small Industries Corporation (NSIC).
• Units falling under Micro & Small Enterprises (MSEs) category as defined under the MSMED Act
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 9 of
INVITATION FOR BIDS G11033
The above are subject to the fulfilling of under mentioned conditions:
a) Units should be registered with National Small Scale Industrial Corporation Limited (NSIC) or with
any of the Authorities specified under the Public Procurement Policy for MSE’s (DIC / KVIC / KVIB
/ Coir Board / NSIC / Directorate of Handicrafts and Handloom or any other body specified by Ministry
b) REGISTRATION CERTIFICATE IS VALID FOR A PERIOD AT LEAST UPTO VALIDITY
OF THE BID OFFER I.E. SIX MONTHS FROM THE SCHEDULE DATE OF BID
c) Self-attested copy of valid relevant registration certificate should be submitted in support.
d) Registration with DGS & D will not entitle a Tenderer to claim above exemption.
10.0 SUBMISSION OF ORIGINAL DOCUMENTS
10.1 The following documents, in addition to uploading in the bid on BPCL’s e-procurement site, shall also be
submitted in Original (in physical form) within 07 (Seven) calendar days from the bid due date to
TRACTEBEL Office, Gurgaon, providing the scanned copies of the same have been uploaded in e-tender
by the bidder along with e-bid within the due date :-
i) Bid Security / EMD
ii) Power of Attorney
iii) Integrity Pact
iv) Declaration of liquidation, court receivership or similar proceeding
The bidders shall submit an affidavit on a stamp paper of Rs.100/- duly attested by a Notary / Magistrate
stating that the bidder shall not be under liquidation, court receivership or similar proceeding and their
business is not banned by any Central / State Government Department / Public Undertaking or Enterprise
or Central / State Governments. The original affidavit containing the declaration shall be submitted along
with the original other Documents.
Bidders to ensure that "Cut Out Slip" attached to IFB, must be pasted on outer envelope to ensure that above
mentioned original documents reaches to concerned official within Four (04) calendar days from the date
of Bid Opening.
11.0 PRE-BID MEETING
11.1 The bidder(s) or his official representative are requested to attend the pre-bid meeting through conference
call so that their queries, if any, related to the tender document and scope of work can be addressed. Non-
attendance of the pre-bid meeting shall not be cause of disqualification of the bidder.
11.2 The bidders may send their queries, if any, on Bidding Document by email / courier to reach
TRACTEBEL/BGRL before the pre-bid meeting. These queries shall be replied during the Pre-bid meeting.
The Contact person :-
BGRL - AHMEDNAGAR & AURANGABAD GA
Mr. Shripad Mandake
Chief Manager – CGD Head (BGRL)-(M)-
Mr. Swapnil S Metkar
Senior Manager - CGD (BGRL)-(M)-
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 10 of
INVITATION FOR BIDS G11033
Mr. Manoj Addigopula
CGD (BGRL)-(M)-
BGRL - SANGLI & SATARA GA
Mr. Milind Labhane
Chief Manager – CGD Head (BGRL)-(M)-
Mr. Amit S Gokhale
Senior Manager - CGD (BGRL)-(M)-
Mr. Virat Nanda
CGD (BGRL)-(M)-
Mr. Gursharan Singh Jhalli, (TRACTEBEL)- (M)
Project Manager
Mr. Saurabh Kumar / Mrs. Poonam Khurana
General Manager – C&P Deputy Manager
TRACTEBEL Engineering Pvt. Ltd.
37, Institutional Area,
Sector 44,Gurgaon, Haryana-122002.
Tel. No. +91 124
E-mail: [email protected]/ [email protected] /
12.0 ZERO DEVIATION BIDS
12.1 This is a ZERO deviation bidding process. Bidder is to ensure compliance of all provisions of the bidding
document and submit their bid accordingly. Bids with any deviation to the bid conditions shall be liable for
13.1 BGRL/TRACTEBEL reserves the right to carry out capacity & capability assessment of the bidder
using in-house information and past performance.
13.2 BGRL/TRACTEBEL will not be responsible or liable for cost incurred in preparation, submission &
delivery of bids, regardless of the conduct or outcome of the bidding process.
13.3 In case any Bidder is found to be involved in cartel formation, his Bid will not be considered for evaluation
/ placement of order. Such Bidder will also be debarred from bidding in future.
13.4 Canvassing in any form by the Bidder or by any other agency on their behalf may lead to disqualification
13.5 Unsolicited clarifications to the bid offer and / or change in the prices during the validity period would
render the bid liable for rejection.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 11 of
INVITATION FOR BIDS G11033
13.6 BGRL/TRACTEBEL reserves the right to reject any or all the bids received or annul the bidding process
at any time at their sole discretion without assigning any reason whatsoever.
13.7 BGRL will allow Public Sector Enterprises (Central/State), purchase preference as admissible/ applicable
from time to time under the existing Govt. policy. BGRL shall also follow the Public Procurement Policy
on Procurement of Goods and services from Micro and Small Enterprises (MSEs) Order
13.8 All other terms and condition shall be as per the bidding documents.
13.9 Bidder shall furnish necessary documentary evidence along with the bid, by way of track record, copies of
work order, division of responsibilities for the work performed, completion certificate, MOU document/
commitment letters etc. as per requirement. In absence of such documents, BGRL reserve the right to reject
the Bid without making any reference to the Bidder or assigning any reason what-so-ever. Bidder shall
provide documentary proof in the form of purchase order/contract letter. Offers received without
documentary proof are liable for rejection.
13.10 BGRL / TRACTBEL, at its discretion reserve the right to verify information submitted and inspect
the facilities at party’s work to confirm their capabilities.
13.11 BGRL decision on any matter regarding short listing of bidders shall be final.
13.12 Bids of bidders on “Holiday” as per BGRL/PSU or its subsidiaries records shall not be considered for
evaluation and ordering.
13.13 Failure to meet the above Qualification Criteria will render the Bid liable to be rejected. Therefore, the
bidder shall in his own interest furnish complete documentary evidence in the first instance itself, in support
of their fulfilling the Qualification Criteria as given above. BGRL reserves the right to complete the
evaluation based on the details furnished without seeking any additional Information.
13.14 All documents submitted should be in English only
13.15 The system time that will be displayed on e-procurement (e-bid) web page shall be the time considered for
determining the expiry of due date and time of the tender and no other time shall be taken into cognizance.
13.16 All questions and requests for clarifications or interpretations related to tender documents shall be addressed
The Contact person :-
Mr. Gursharan Singh Jhalli, (TRACTEBEL)- (M)
Project Manager
Mr. Saurabh Kumar / Mrs. Poonam Khurana
General Manager – C&P Deputy Manager
TRACTEBEL Engineering Pvt. Ltd.
37, Institutional Area,
Sector 44, Gurgaon, Haryana-122002.
Tel. No. +91 124
E-mail: [email protected]/ [email protected] /
13.17 Contact numbers of support desk of BPCL e-procurement (e-bid) website in case of any issue with website
which is as follows:
1 Mr. Dinesh kumar - 09824763363, 079-68136861, [email protected]
2 Mr. Manish kumar Baliyan - 09265871722, 0120-2474951, [email protected]
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 12 of
INVITATION FOR BIDS G11033
DO NOT OPEN - THIS IS A QUOTATION
Bid Document No. : P.013751 G11031 R029 Dated 12.11.2020
(E-Tender no. BGRL - 100010462020)
Description : SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION
COMPRESSORS FOR CGD PROJECT FOR AHEMEDNAGAR &
AURANGABAD AND SANGLI & SATARA GA IN THE STATE OF
Due Date & Time : 04.12.2020 till 1400 Hrs. (IST)
…………………………………… Gursharan Singh Jhalli, Project Manager,
…………………………………… TRACTEBEL Engineering Pvt. Ltd,
37, Institutional Area, Sector
Gurgaon-122002, Haryana
(To be pasted on the envelope containing Physical documents in line with clause no. 10 above.)
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 13 of
INSTRUCTIONS TO
BHARAT GAS RESOURCES LTD.
CITY GAS DISTRIBUTION PROJECT FOR AHMEDNAGAR
& AURANGABAD GA AND SANGLI & SATARA GA
SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION
COMPRESSOR FOR CITY GAS DISTRIBUTION
PROJECT FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA
INSTRUCTIONS TO BIDDERS (ITB)
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 1 of
INSTRUCTIONS TO
TABLE OF CONTENTS
8.0 CLARIFICATION OF BIDDING DOCUMENTS ..........................................................
10.0 CONFIDENTIALITY OF BIDDING DOCUMENT ........................................................
15.0 EARNEST MONEY DEPOSIT (EMD) / BID SECURITY ..............................................
18.0 BID REJECTION CRITERIA / COMPLIANCE TO BID REQUIREMENT....................
24.0 MODIFICATION AND WITHDRAWAL OF BIDS .....................................................
25.0 PURCHASER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS..
30.0 EVALUATION OF TECHNO-COMMERCIAL BIDS....................................................
34.0 PUBLIC PROCUREMENT POLICY FOR MICRO AND SMALL ENTERPRISES ...........
36.0 PROVISION REGARDING POLICY TO PROVIDE PURCHASE PREFERENCE (LINKED
37.0 UNSOLICITED POST TENDER MODIFICATION.....................................................
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 2 of
INSTRUCTIONS TO
39.0 BGRL'S RIGHT TO ACCEPT OR REJECT ANY BID ..................................................
40.0 NOTIFICATION OF AWARD / FAX OF ACCEPTANCE .............................................
41.0 CONTRACT AGREEMENT AND SIGNING OF AGREEMENT.....................................
42.0 MODIFICATION OF INSTRUCTIONS TO TENDER .................................................
43.0 CONTRACT PERFORMANCE GUARANTEE / SECURITY DEPOSIT..........................
47.0 PROVISIONS FOR STARTPUS [APPLICABLE FOR INDIAN BIDDERS ONLY] (AS
DEFINED IN GAZETTE NOTIFICATION NO. D.L-33004/99 DATED 18.02.2016 AND
23.05.2017 OF MINISTRY OF COMMERCE AND INDUSTRY AND AS AMENDED FROM
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 3 of
INSTRUCTIONS TO
1.0 INTRODUCTION
1.1 This tender deals with the SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION COMPRESSORS
FOR CGD PROJECT FOR AHEMEDNAGAR & AURANGABAD AND SANGLI & SATARA GA
IN THE STATE OF MAHARASHATRA. For details refer Technical Part / SOR / IFB.
1.2 BGRL/TRACTEBEL invites e-bids in two part bids under single stage for the entire scope of work covered
under the Bidding Document on item rate work contract basis (hereinafter for the purpose of these
instructions collectively referred as “WORK”).
1.3 It shall be Bidder’s responsibility to have thorough understanding of the reference documents, site
conditions and specifications included in the Bidding Document.
2.0 ELIGIBILITY OF BIDDERS
The Bidder shall not be under a declaration of ineligibility by Owner for Corrupt/ Fraudulent/ Collusive/
Coercive practices.
2.1 The Bidder is not put on holiday/ banned by BGRL or TRACTEBEL or put on holiday/ banned by any
Government Department/ Public Sector Enterprise on due date of submission of bid. If documents are
downloaded from website, offers submitted by such bidders shall not be considered for opening/
evaluation/award.
In case there is any change in status of the declaration prior to award of contract, the same has to be promptly
informed to BGRL by the bidder.
2.2 The Bidder should not be under any liquidation court receivership or similar proceedings on due date of
submission of bid.
In case there is any change in status of the declaration prior to award of contract, the same has to be promptly
informed to BGRL by the bidder.
It shall be the sole responsibility of the bidder to inform BGRL in case the bidder is under any liquidation
court receivership or similar proceedings on due date of submission of bid and during the course of
finalization of the tender. Concealment of the facts shall tantamount to misrepresentation of facts and shall
lead to action against such Bidders as per BGRL’s policy.
2.3 Bidder shall not be affiliated with a firm or entity:
(i) that has provided consulting services related to the work to the Owner during the preparatory stages
of the work or of the project of which the works/services forms a part of or
(ii) that has been hired (proposed to be hired) by the Owner as an Engineer/ Consultant for the contract.
2.4 Pursuant to qualification criteria set forth in the bidding document, the Bidder shall furnish all necessary
supporting documentary evidence to establish Bidder’s claim of meeting qualification criteria.
2.5 Bidders shall, as part of their bid, submit a written power of attorney authorizing the signatory of the bid to
commit the bidder. Power of Attorney issued by the Board of Directors/ CEO /Chairman/ MD / Company
Secretary of the Bidder/ all partners in case of Partnership firm/any person authorized in terms of Deed of
LLP/Proprietor in favour of the authorised employee(s) of the Bidder, in respect of the particular tender for
signing the Bid and all subsequent communications, agreements, documents etc. pertaining to the tender
and to act and take any and all decision on behalf of the Bidder, is to be submitted.
The authorized employee(s) of the Bidder shall be signing the Bid and any consequence resulting due to
such signing shall be binding on the Bidder.
3.0 ONE BID PER BIDDER
3.1 A Firm/Bidder shall submit only 'one [01] Bid' in the same Bidding Process. A Bidder who submits or
participates in more than 'one [01] Bid' will cause all the proposals in which the Bidder has participated to
be disqualified.
3.2 Alternative Bids shall not be considered.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 4 of
INSTRUCTIONS TO
4.0 COST OF BIDDING
4.1 The Bidder shall bear all costs associated with the preparation and submission of the Bid including but not
limited to Bank charges all courier charges including taxes & duties etc. incurred thereof. Further, BGRL
will in no case, be responsible or liable for these costs, regardless of the outcome of the bidding process.
5.0 SITE LOCATION / SITE VISIT
5.1 Bidder is advised to visit and examine the site, its surroundings and familiarize himself of the existing
facilities and environment, and collect all other information which he may require for preparing and
submitting the bid and entering into the Contract. Claims and objections due to ignorance of existing
conditions or inadequacy of information will not be considered after submission of the bid and during
implementation.
5.2 The Bidder or any of its personnel or agents will be granted permission by BGRL to enter upon its premises
and land for the purpose of such visits, but only upon the explicit condition that the Bidder, his personnel
or agents will release and indemnify BGRL and his personnel and agents from and against all liabilities in
respect thereof and will be responsible for personal injury (whether fatal or otherwise), loss of or damage
to property, and any other loss, damage, costs, and expenses incurred as a result thereof.
5.3 The Bidder shall not be entitled to hold any claim against BGRL for non-compliance due to lack of any
kind of pre-requisite information as it is the sole responsibility of the Bidder to obtain all the necessary
information with regard to site, surrounding, working conditions, weather etc. on its own before submission
CONTACT DETAILS OF TRACTEBEL’S REPRESENTATIVE AT VISIT
Mr. Bajrang Rathod -(TRACTEBEL)- (M)
Resident Construction Manager (RCM), CGD Project - A&A GA,
E-mail: [email protected]
Mr. Shahbaz Ansari, (TRACTEBEL)-M
Resident Construction Manager (RCM), CGD Project – S&S GA,
E-mail: [email protected]
6.0 ACKNOWLEDGEMENT & CONFIRMATION
6.1 Bidder shall acknowledge against the Tender on BPCL’s website https://bpcleproc.in/ and confirm his
intention to bid or reason(s) of not participating in the tendering or in case of regret / negative
acknowledgement.
A. BIDDING DOCUMENT CLARIFICATION AND AMENDMENT
7.0 CONTENTS OF BIDDING DOCUMENT
7.1 The Bidding Document shall be read in conjunction with any amendment issued in accordance with Clause
Volume I Commercial Volume
Ø Section-I : Invitation for Bid [IFB]
Ø Section-II : Instructions to Bidders [ITB]
Ø Section-III : General Conditions of Contract [GCC]
Ø Section-IV : Special Conditions of Contract [SCC]
Ø Section-V : Forms & Formats
Volume II to II – Technical Volume
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 5 of
INSTRUCTIONS TO
Ø Technical Specifications, Scope of Work and Drawings etc.
7.2 Although all the details presented in this Bidding Document have been compiled with reasonable care,
however, the Bidder is expected to examine the Bidding Document, including all instructions, forms, terms,
specifications and drawings in the Bidding Document and Bidder to ensure that the information provided
is adequate, clearly understood and it includes all documents as per Master Index.
7.3 Bidding documents once issued / downloaded are non-transferable.
8.0 CLARIFICATION OF BIDDING DOCUMENTS
8.1 Bidder shall examine the Bidding Document thoroughly in all respect and if any conflict, discrepancy, error
or omission is observed, Bidder may request clarification within the cutoff date as specified in IFB or prior
to the Bid Closing Date. Such clarification requests shall be directed to the address given in IFB.
8.2 Any failure by Bidder to comply with the aforesaid requirement shall not excuse the Bidder, after
subsequent award of Contract, from performing the work in accordance with the Contract.
8.3 Response to queries / clarifications raised will be sent as expeditiously as possible to all who have been
issued the Bidding Documents. The response shall not form part of the Bidding Document unless issued as
an Addendum / Amendment. The queries raised (without identifying the sources of the query) and the
responses will be uploaded on website.
8.4 Bidders are expected to resolve all their clarifications/queries to the Bidding Document and submit their
bid in total compliance to Bidding Document without any deviation / stipulation / clarification.
9.0 AMENDMENT OF BIDDING DOCUMENTS
9.1 BGRL may, for any reason whether at his own initiative or in response to the clarification requested by the
prospective bidder(s), issue amendment in the form of Addendum during the bidding period and subsequent
to receiving the bids. Any addendum thus issued shall be part of the Bidding Documents and Bidder shall
submit ‘Original’ Addendum / Compliance letter duly signed and stamped in token of his acceptance.
9.2 For Addendum issued during the bidding period, Bidder shall consider the impact in his bid. For Addendum
issued subsequent to receiving the bids, Bidder shall follow the instructions issued along with addendum
with regard to submission of impact on quoted price / revised price, if any.
9.3 The Owner, if consider necessary, may extend the date of submissions of Bid in order to allow the Bidders
a reasonable time to furnish their most competitive bid taking into account the amendment issued thereof.
10.0 CONFIDENTIALITY OF BIDDING DOCUMENT
10.1 Bidders shall treat the bidding documents and contents therein as strictly confidential.
10.2 The Bidding Document is and shall remain the exclusive property of BGRL without any right to Bidder to
use them for any purpose except for the purpose of Bidding.
B. PREPARATION OF BIDS
11.0 LANGUAGE OF BID
11.1 The Bid and all correspondence, drawing(s), document(s), certificate(s) etc. related to the bid exchanged
by bidder and BGRL shall be written in English Language. For supported documents and printed literature
submitted in any another language, an equivalent English translation shall also be submitted. Responsibility
for correctness in translation shall lie with the Bidder. In case of any conflict, for the purpose of
interpretation of the bid, the English translation shall govern.
12.0 DOCUMENTS COMPRISING THE BID
12.1 The e-bid must be complete in all respects, leaving no scope of ambiguity. Bidder is fully responsible for
the bid submitted and no relief or consideration can be given for errors and omissions.
12.2 The bid shall be submitted by uploading relevant document in respective covers provided in the e-tendering
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 6 of
INSTRUCTIONS TO
• Earnest Money Deposit
• Documentation Against Bidder Qualification Criteria
• Techno-Commercial / Unpriced Bid
12.3 Documentation against Bid Evaluation Criteria shall contain the following documents and to be uploaded
in e-tendering website:
• Work order / PO / Agreement of similar works executed / completed by the bidder mentioning the value
and the scope of work as documentary evidence.
• Completion/ Execution Certificate of similar works from the client / end user / any documentary
evidence to establish successful completion of similar works.
• Audited balance sheets and profit & loss statements of immediately preceding three financial years
12.4 Techno-Commercial / Un-priced bid shall contain the following documents and to be uploaded in e-
tendering website:
a) Covering Letter' on Bidder's 'Letterhead' clearly specifying the enclosed contents.
b) As a confirmation that the prices are quoted in requisite format complying with the requirements copy
of Schedule of Rate (SOR without rate) with prices blanked out mentioning quoted / not quoted (as
applicable) written against each SOR line item.
c) Power of Attorney /copy of Board Resolution, in favour of the authorized signatory of the Bid on
d) Copy of Partnership Deed in case of partnership firm or Memorandum & Article of Association in
case of limited company.
e) Duly attested documents in accordance with the "BID EVALUATION CRITERIA [BEC]"
establishing the qualification.
f) 'Bidder's General Information', as per 'Form F-1'.
g) 'Bid Form', as per 'Form F-2'
h) Information about current litigation/ Arbitration, if any, in which bidder is involved as per Form F-3
i) Bidder’s financial Capabilities as per Form F-4
j) Declaration by Bidder as per Form F-5
k) 'No Deviation Confirmation', as per 'Form F-6'
l) Checklist for submission of bid, in 'Form F-7'
m) 'Agreed Terms and Conditions', as per 'Form F-8'
n) Declaration by Black Listing / Holiday Listing as Per 'Form F-9'
o) Bank Mandate Form as Per 'Form F-10'
p) Undertaking for Non-Engagement of Child Labour as Per 'Form F-11'
q) Bidder's Queries as per 'Form F-12'
r) Integrity Pact as Per 'Form F-13'
s) Indemnity Bond as per 'Form F-14'
t) Declaration of liquidation, court receivership or similar proceeding as per Clause No. – 10.0 of IFB
u) Cancelled Cheque of bidders.
v) Any other information/details required as per Bidding Document
w) EMD / Bid Security
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 7 of
INSTRUCTIONS TO
Note: All the pages of the Bid must be signed by the "Authorized Signatory" of the Bidder.
12.5 Price Bid shall consist of :
Schedule of Rates duly filled in rates.
No stipulation, deviation, terms & conditions, presumption, basis etc. shall be stipulated in Price Part of the
bid. Any condition if stipulated shall be treated as null and void and shall render the bid liable for rejection .
12.6 Earnest Money Deposit / Bid Security:
EMD / Bid Security, in the form of Crossed Demand Draft (DD) / Bank Guarantee (as per proforma
provided in GCC) of requisite amount in favour of “Bharat Gas Resources Ltd.” payable at Mumbai, as
stipulated in IFB, shall be submitted in following manner:
Original EMD : Not later than Seven (7) calendar days from the date of Bid Opening
Copy of Original EMD : Scanned & uploaded in E-Tendering Portal along with the Bid
In case of exemption of EMD as per clause 15 below, the scanned copy of the requisite documents such as
self-attested copy of valid registration certificate should be uploaded in e-tender website. However, original
of the same should be sent to TRACTEBEL office, Gurgaon within 07 calendar days from the date of Bid
Opening along with other original documents.
12.7 Bidder shall submit the following documents in ORIGINAL within Seven (7) calendar days from the date
of Bid Opening, providing copy of the same have been uploaded on E- Tendering Website:
i) Original EMD / Self-attested copy of valid NSIC / MSE certificate.
ii) Original Power of Attorney.
iii) Original signed and stamped Integrity Pact.
iv) Original Declaration of liquidation, court receivership or similar proceeding
The address for submission of original documents is as follows:
TRACTEBEL Engineering Pvt. Ltd.
Intec house, Plot No. 37, Institutional Area,
Sector 44, Gurgaon, Haryana-122002.
13.0 BID PRICES & BIDDING CURRENCY
13.1 Unless otherwise permitted in the Bidding Document, the bid shall be for the complete scope of work.
13.2 Unless stated otherwise in the Bidding Documents, the Contract shall be for the whole works as described
in Bidding Documents, based on the rates and prices submitted by the Bidder and accepted by the owner.
The prices quoted by the Bidders will be inclusive of all taxes except GST (CGST & SGST / UTGST or
IGST), which shall be separately indicated.
13.3 Prices must be filled in format for "Schedule of Rates [SOR]" uploaded at BPCL e- portal. If quoted in
separate typed sheets and any variation in item description, unit or quantity is noticed; the Bid is liable to
13.4 Bidder shall quote for all the items of "SOR" after careful analysis of cost involved for the performance of
the completed item considering all parts of the Bidding Document. In case any activity though specifically
not covered in description of item under "SOR" but is required to complete the works as per Specifications,
Scope of Work / Service, Standards, General Conditions of Contract (“GCC"), Special Conditions of
Contract ("SCC") or any other part of Bidding Document, the prices quoted shall deemed to be inclusive
of cost incurred for such activity.
13.5 All duties, taxes and other levies [if any] payable by the Contractor under the Contract, or for any other
cause except final GST (CGST & SGST / UTGST or IGST) shall be included in the rates / prices and the
total bid-price submitted by the Bidder. Applicable rate of GST (CGST & SGST / UTGST or IGST) on
the contract value shall be indicated in unpriced offer.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 8 of
INSTRUCTIONS TO
13.6 Prices quoted by the Bidder, shall remain firm and fixed and valid until completion of the Contract and will
not be subject to variation on any account. Any new taxes & Duties, if imposed by the State/ Govt. of India
after due date of bid submission but before the Contractual Delivery Date, shall be reimbursed to the
contractor on submission of documentary evidence for proof of payment to State/ Govt. Authorities and
after ascertaining it’s applicability with respect to the contract.
13.7 Further, Bidder shall also mention the Service Accounting Codes (SAC) at the designated place in SOR.
13.8 Bidder shall quote price after careful analysis of cost involved for the performance of the work considering
all parts of the Bidding Documents. In case any activity though specifically not covered in description of
item under ‘Schedule of Rates (SOR)’ but is required to complete the work, which could be reasonably
implied / inferred from the contents of the Bidding Document, the prices quoted shall deemed to be
inclusive of cost incurred for such activity.
13.9 The prices shall be based on conditions specified in General Conditions of Contract, Special Conditions of
Contract, Scope of Work, Scope of Supply, Technical Specifications and other contents of Bidding
13.10 Prices quoted by the bidder, shall remain firm, fixed and valid until completion of the Contract performance
and will not be subject to variation on any account except as otherwise specifically provided in the tender
13.11 Currency of Bid and Payment shall be only in INR.
13.12 It will be the duty of BIDDER / CONTRACTOR to duly observe and comply with all laws, rules,
regulations, orders and formalities applicable to GST, and other taxes & duties etc. on the manufacture, sale
and / or supply of any material to the BGRL. The BIDDER /CONTRACTOR shall keep the BGRL
indemnified from and against any and all claims, demands, prosecutions, penalties, damages, demurrages
and / or other levies whatsoever made or levied by any Court, Tribunal or the Customs or other Authorities
with respect to any alleged breach, evasion or infraction of such duties, taxes, charges or levies or any
breach or infraction of such laws, rules, regulations, orders or formalities concerning the same and from the
consequence thereof.
13.13 No Mobilization Advance and No secured advance will be paid.
13.14 TAXES & DUTIES
I. Reference of taxes subsumed in GST (Excise Duty, Sales Tax, VAT, Service Tax, octroi, entry tax etc.),
wherever appearing in the tender document/ GCC/GPC, shall appropriately be read as GST as per
Accordingly, GST registration certificate shall be submitted by bidder in place of Service Tax
Invoice (Cenvatable, if applicable)’ or ‘Cenvatable bills (if applicable)’ wherever appearing in the
tender shall be read as ‘Invoice as per GST Act/ Law’.
14.0 BID VALIDITY
14.1 Bid shall remain valid for a minimum period of 6 (Six) months from final due date of submission of Bid.
During the above period, bidders shall not be entitled to revoke or cancel their Bid or to vary the Bid given
or any term thereof without written consent of the BGRL. In case, bidders are revoking or cancelling their
Bid or varying any terms in regard thereof without the written consent of BGRL, BGRL shall forfeit EMD
and reject their bids. Such Bidder also may be put on Holiday list.
14.2 BGRL may request the bidders for extension of the period of validity of bid. If the Bidder agrees to the
extension request, the validity of Bank Guarantee towards EMD shall also be suitably extended. Bidders
may refuse the request of extension of bid validity without forfeiting his EMD. However, bidders agreeing
to the request for extension of validity of bid shall not be permitted to modify the bid because of extension,
unless specifically invited to do so.
15.0 EARNEST MONEY DEPOSIT (EMD) / BID SECURITY
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 9 of
INSTRUCTIONS TO
15.1 Bidder shall furnish, as part of its Bid, EMD for an amount as indicated in the IFB. The Bids not
accompanied with EMD or EMD not as per Pro-forma given in the Bidding Document shall be considered
as non-responsive and such Bids shall be liable for rejected. BGRL shall not pay any interest on EMD
15.2 Details of EMD shall be entered before uploading of bid and copy of EMD shall be uploaded in the
respective cover provided in the e-tendering website for a value specified in IFB.
15.3 Following categories of bidders shall be exempted from paying Earnest Money Deposit
i. Units registered with National Small Industries Corporation (NSIC).
ii. Units falling under Micro & Small Enterprises (MSEs) category as defined under the
The above are subject to the fulfilling of under mentioned conditions:
a) Units should be registered with National Small Scale Industrial Corporation Limited
(NSIC) or with any of the Authorities specified under the Public Procurement Policy for MSE’s
(DIC / KVIC / KVIB / Coir Board / NSIC / Directorate of Handicrafts and
Handloom or any other body specified by Ministry of MSME).
b) Registration Certificate is valid for a period at least upto validity of the offer.
c) Self-attested copy of valid relevant registration certificate should be submitted in support.
d) Registration with DGS&D will not entitle a Tenderer to claim above exemption.
15.4 Bid securities of unsuccessful bidders will be returned upon award of Contract. However,
EMD of the successful Bidder will be returned upon the Bidder's executing the Contract, and
furnishing the Security Deposit.
15.5 The EMD may be forfeited:
i) If a Bidder withdraws its bid during the period of Bid Validity or does any breach of
tendering terms and conditions, or
ii) If a bidder modifies his bid on his own.
iii) If a bidder after opening of price bid increases the price, though within the validity
period and even though the offer remains lowest
iv) In case of a successful Bidder, if the Bidder fails, within the specified period:
a. to sign the Contract.
b. to furnish the Security Deposit.
16.0 PRE-BID QUERIES
16.1 The purpose of the pre-bid queries will be to clarify issues and to answer questions on any matter pertaining
to the Tender conditions that may be raised by bidders who have been issued the Bidding Document.
16.2 The bidder is requested to submit any queries / clarification / information pertaining to
Bidding Document in writing delivered by hand or by fax / e-mail as per Form F-12 enclosed in the Bidding
Document so as to reach BGRL not later than the date specified in the Notice Inviting Tender. Queries /
Clarifications / Information sought in any other manner shall not be responded to. The editable soft copies
of the queries may also be e-mailed at the address [email protected] /
[email protected] / [email protected] / to enable
BGRL/TRACTEBEL to prepare replies to the queries against each query in the same format expeditiously.
16.3 BGRL/ TRACTEBEL’s responses to Bidder’s queries / clarifications raised will be furnished as
expeditiously as possible to all those who have downloaded the Bidding Document and shall be e-mailed
to all other bidders who have downloaded the Bidding Document.
Any modification of the Bidding Document, which may become necessary as a result of the pre-bid
queries shall be intimated to all bidders through the issue of an Addendum / Amendment.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 10 of
INSTRUCTIONS TO
17.0 FORMAT AND SIGNING OF BID
17.1 The bidder shall upload the Techno-commercial bid duly filled, signed and stamped and the price bid in
excel file duly filled rates in respective folder provided in the e-tendering website.
17.2 All pages of bid shall be stamped and initialed by person(s) signing the bid.
17.3 The bid shall contain no interlineations, erasures or overwriting. In case any corrections are required, the
original writings shall be neatly cut / penned through and re-written nearby. No overwriting or erasure of
original writings by use of “white fluid” or otherwise is permitted. In case any erasure using “white
correcting fluid is found, the offer shall be liable to be rejected. All corrections / cuttings / alterations shall
be signed in full by the Bidder with date.
18.0 BID REJECTION CRITERIA / COMPLIANCE TO BID REQUIREMENT
18.1 BGRL/ TRACTEBEL expect Bidder’s compliance to requirement of Bidding Document without any
deviation and submit substantially responsive bid.
18.2 Bids not compliance to requirement of Bidding Document shall not be accepted and BGRL / TRACTEBEL
may not seek any clarification / correspondence from bidders in case sufficient acceptable bids are received.
Therefore, bidders are requested to submit their bids complete in all respects.
18.3 Bidders shall ensure that their bids are complete in all respects and conform to terms, conditions and Bid
Evaluation criteria of Tender. Bids not complying with BGRL/ TRACTEBEL’s requirement may be
rejected without seeking any clarifications.
18.4 In any case, no exception or deviation shall be accepted to the following critical stipulations of Bidding
Document and bids containing deviations / exceptions to these shall be considered to be non-responsive
and are liable to be rejected:
• Earnest Money Deposit
• Arbitration clause
• Defect Liability Period
• Schedule of Rates
• Completion schedule / Time Schedule
• Security Deposit / Performance Bank Guarantee
• Mobilization Advance
• Price Reduction Schedule
• Termination and suspension
• Force Majeure
• Scope of Work / Scope of Supply
• Liquidated Damages for Delay
• Integrity Pact
• Any other rejection criteria specified elsewhere in the Bidding Document.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 11 of
INSTRUCTIONS TO
18.5 The deviation on other clauses, if unavoidable, should be furnished as per Form-6 attached. Exception /
Deviations submitted in any other form and mentioned elsewhere in their Bid shall not be considered. If
any exception / deviation are acceptable to BGRL, the same shall be issued to all bidders through an
amendment. All other deviations / exceptions, not incorporated in amendment, shall be withdrawn by
bidders failing which offer of such bidders shall not be acceptable. If a bidder takes any further deviations
other than those agreed, while submitting the revised price bid / price implication (if any), his bid shall be
rejected outright without any reference. In case any deviations is found in the revised price bid / price
implication, the bidder is also liable to be placed on holiday for future tenders.
BGRL has initiated payments to Suppliers and Contractors electronically, and to facilitate the payments
electronically through 'e-banking'. The bidder should give the details of his bank account as per the bank
mandate form F-10.
20.0 CHECK LIST FOR SUBMISSION OF BID
20.1 To assist Bidder in ensuring the completeness of bid, a checklist for submission of various
documents / details in un-priced commercial part of bid, has been enclosed.
20.2 Bidder is required to fill the checklist and submit along with the bid for ready reference. All
documents shall be submitted under various sections as per this Check List.
C. BID SUBMISSION
21.0 SUBMISSION OF BID
21.1 For submission of Bid, due date and time for submissions of bids have been mentioned in the IFB. Bids
cannot be uploaded by bidders on the website beyond the Bid Due Date and time.
21.2 Bids shall be submitted through e-tender mode in the manner specified elsewhere in tender document. No
Manual/ Hard Copy (Original) offer shall be acceptable.
22.0 DATE, TIME & PLACE OF SUBMISSION
22.1 Bid must be submitted by the bidder through e-tendering on or before bid due date and time mentioned in
the IFB or any extension thereof as duly notified at http://bpcleproc.in/. (However, Bidders are requested
not to ask any extension in due date for submission of Bids in view of tight project schedule.)
22.2 Bidders are advised in their own interest to carefully go through various help links provided at BPCL E-
Tendering website so as to ensure that bids are uploaded in E-Tendering website well before the closing
date and time of bid submission.
22.3 In the event of failure in bidder’s connectivity with BPCL website during the last few hours on account of
problem on bidders account, they are likely to miss the deadline for bid submission. Due date extension
request due to this reason will not be entertained. In view of the same, bidders are advised to upload their
bid in advance.
23.1 E-tendering system of BPCL shall close immediately after the due date & time for submission of bid and
no bids can be submitted thereafter.
23.2 Unsolicited Bids or Bids received to address other than one specifically stipulated in the tender document
will not be considered for evaluation/opening/award if not received to the specified destination within
stipulated date & time.
24.0 MODIFICATION AND WITHDRAWAL OF BIDS
24.1 The Bidder may modify or withdraw its Bid after the Bid's submission but prior to the due date prescribed
for submission of Bids by selecting the detaching option available in the e-tender portal.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 12 of
INSTRUCTIONS TO
24.2 No bid shall be allowed to be withdrawn in the interval between the deadline for submission of bids and
the expiration of the period of bid validity specified by the bidder. Withdrawal of a bid during this interval
shall result in the forfeiture of bidder's EMD / Bid security.
25.0 PURCHASER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
BGRL reserves the right to accept or reject any Bid, and to annul the Bidding process and reject all Bids,
at any time prior to award of Contract, without thereby incurring any liability to the affected Bidder or
Bidders or any obligations to inform the affected Bidder or Bidders of the ground for BGRL's action.
However, Bidder if so desire may seek the reason (in writing) for rejection of their Bid to which BGRL
shall respond quickly.
D. E-BID OPENING AND EVALUATION
26.0 OPENING OF BIDS
26.1 The un-priced Bids shall be opened online through e-tender portal, at the specified date and time given in
the RFQ document or extended otherwise. The Bidders who have submitted their Bid will be able to view
online the name & status of all the Bidders at their respective windows, after Bid opening by BGRL.
27.0 CLARIFICATIONS OF BIDS
27.1 BGRL / TRACTEBEL, if necessary, will obtain clarifications on the Bid by requesting for such information
/ clarification from any or all Bidders, either in writing or through personal contact. All responses shall be
in writing, and no change in the price or substance of the bid shall be permitted unless specifically sought
by BGRL / TRACTEBEL.
28.0 CONFIDENTIALITY
28.1 Information relating to the examination, clarification, evaluation and comparison of Bids, and
recommendations for the award of a Contract, shall not be disclosed to Bidder(s) or any other persons not
officially concerned with such process.
29.0 CONTACTING THE OWNER / CONSULTANT
29.1 From the time of Bid opening to the time of award of Contract, if any Bidder wishes to contact the Owner
/ Consultant on any matter related to the Bid, it should do so in writing. Information relating to the
examination, clarification, evaluation & recommendation for award shall not be disclosed.
29.2 Any effort by the Bidder to influence the Owner / Consultant in the 'Bid Evaluation', 'Bid Comparison', or
'Contract Award' decisions may result in the rejection of the Bidder's Bid.
30.0 EVALUATION OF TECHNO-COMMERCIAL BIDS
30.1 Prior to price opening of bids, BGRL/ TRACTEBEL will determine whether each bid
• is accompanied by required EMD (as applicable)
• Fulfils the Bid Evaluation Criteria stated in IFB.
• Totally compliance to the requirement of the Bidding document.
• provides any clarifications and / or requirement pursuant to clause 27.0 above
30.2 Bidder shall submit all the details asked for with their Bid. However, BGRL/ TRACTEBEL may give
opportunity to the Bidders to submit missing details or clarifications within the stipulated time. In case
these are not submitted within stipulated time, offer of the Bidder will be evaluated based on available
details. The same shall be considered, if found adequate or else shall be rejected.
30.3 BGRL reserve the right to use in-house information for assessment of capability of Bidder and their
performance on jobs completed / in progress for evaluation purpose.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 13 of
INSTRUCTIONS TO
30.4 Pro-forma of Integrity Pact (IP) shall be returned by the Bidder along with the un-priced bid documents,
duly signed by the same signatory who is authorized to sign the bid documents. All the pages of the Integrity
Pact shall be duly signed. Bidder’s failure to return the IP duly signed along with the bid documents shall
result in the bid not being considered for further evaluation. Proforma of Integrity Pact is attached in tender
document as Form F-13.
30.5 Bidders may raise dispute / complaints, if any, with the nominated Independent External Monitors as
mentioned in the Integrity Pact Document.
30.6 Directives issued by Govt. of India from time to time shall be given due consideration during bid evaluation.
31.0 OPENING OF PRICE BID
31.1 Price part of only those bidders, whose bids are considered techno-commercially acceptable, shall be
opened online. Bidders selected for opening of their price bids shall be informed about the date of price bid
opening. The considered techno-commercially acceptable Bidder will be able to view online the price sheets
of other techno-commercially acceptable bidders at their respective windows, after priced bid opening.
32.0 CORRECTION OF ERRORS
32.1 Bids determined to be substantially responsive will be checked by the Owner for any arithmetic errors.
Errors will be corrected by the Owner as follows:
(i) When there is a difference between the rates in figures and words, the rate which corresponds to the
amount worked out by the Bidder (by multiplying the quantity and rate) shall be taken as correct.
(ii) When the rate quoted by the Bidder in figures and words tallies but the amount is incorrect, the rate
quoted by the contractor shall be taken as correct and not the amount and the amount shall be re-
calculated/ corrected accordingly.
(iii) When it is not possible to ascertain the correct rate, in the manner prescribed above, the rate as
quoted in words shall be adopted and the amount worked out, for comparison purposes
32.2 The amount stated in the bid will be adjusted by the Owner in accordance with the above procedure for the
correction of errors. If the bidder does not accept the corrected amount of bid, its bid will be rejected, and
the bid security shall be forfeited.
33.0 EVALUATION OF PRICE BIDS
33.1 The evaluation for award shall be made on OVERALL LOWEST BASIS (L1) basis including applicable
GST (CGST & SGST/ UTGST or IGST). Bidders must quote for complete scope of work of all SOR Line
items, failing which their offer shall not be considered for evaluation.
33.2 Evaluated price will include quoted prices along with taxes and duties, Owner’s liability towards customs
duty, Goods & Service Tax (GST) and any other taxes and duties as applicable, Technical loading as defined
in Technical Specification & Commercial loading if any, shall be considered while comparing prices.
Evaluated Price = Installation & Commissioning of Package + P&F + Freight + Insurance + AMC Price
for 3 years + Technical Loading (if applicable) + Taxes/ Duties as applicable.
BGRL IS NOT ENTITLED FOR INPUT CREDIT OF GST (CGST& SGST /UTGST OR
IGST) IN CASE OF PRESENT TENDER.
The OWNER / OWNER’s CONSULTANT will evaluate and compare bids on complete scope of
work i.e. Supply, Services & Comprehensive Maintenance of SOR item.
1. In case the bidder is covered under Composition Scheme under GST laws, then bidder should
quote the price inclusive of the GST (CGST&SGST/UTGST or IGST). Further, such bidder
should mention “Cover under composition system” in column for GST (CGST&SGST/UTGST
2. In case any cess on GST is applicable, same shall also be considered in evaluation.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 14 of
INSTRUCTIONS TO
33.3 BIDS NOT CONFORMING TO TECHNICAL SPECIFICATIONS / REQUIREMENTS SHALL
BE LIABLE FOR REJECTION.
34.0 PUBLIC PROCUREMENT POLICY FOR MICRO AND SMALL ENTERPRISES
34.1 Following provision has been incorporated for Micro and Small Enterprises (MSE), in line with
notification of Government of India, vide Gazette of India No. 503 dated 26.03.2012 proclaiming
the Public Procurement Policy on procurement of goods and services from MSEs.
34.2 Issue of tender document to MSEs free of cost.
34.3 Exemption to MSEs from payment of EMD.
In Tender, participating Micro and Small Enterprises quoting price within price band of L 1 +15%
shall also be allowed to supply a portion of requirement by bringing down their prices to Ll price
in a situation where Ll price is from someone other than a micro and small enterprises and such
micro and small enterprises shall be allowed to supply upto 25% of the total tendered value. In case
of more than one such Micro and Small Enterprises, the supply shall be shared proportionately (to
tendered quantity).
Further, out of above 25%, 4% shall be reserved for MSEs owned by SC/ST entrepreneurs. Further,
3% shall be reserved for MSEs owned by women within above 25% reservation. The respective
quota(s) shall be transferred to other MSEs in case of non-availability of MSEs owned by SC/ST
entrepreneurs/ MSEs owned by Women.
The quoted prices against various items shall remain valid in case of splitting of quantities of the
In case tendered item is non-splitable or non- dividable, MSE quoting price within price band L1
(other than MSE) + 15% , may be awarded for full/ complete supply of total tendered value subject
to matching of L1 price.
34.4 The MSE(s) owned by SC/ST/ Woman Entrepreneurs shall mean:-
a) In case of proprietary MSE, Proprietor(s) shall be SC/ST/Woman.
b) In case of partnership MSE, the SC/ST/Woman partners shall be holding atleast 51% share in
c) In case of private Limited Companies, at least 51% share is held by SC/ST/Woman. If the
MSE is owned by SC/ST/Woman Entrepreneurs, the bidder shall furnish appropriate
documentary evidence in this regard.
34.5 In case Bidder is a Micro or Small Enterprise under the Micro, Small and Medium Enterprises
Development Act, 2006, the Bidder shall submit the following :
a) Documentary evidence that the Bidder is a Micro or Small Enterprises registered with District
Industries Centers or Khadi and Village Industries National Small Industries Corporation or
Directorate of Handicrafts and Handloom or any other body specified by Ministry of Micro, Small
and Medium Enterprises or Udyog Aadhar Memorandum.
b) If the MSE is owned by SC/ST/Woman Entrepreneurs, the Bidder shall furnish appropriate
documentary evidence in this regard.
The above document(s) submitted by the Bidder shall be duly certified by the Statutory
Auditor of the bidder or a practicing Chartered Accountant (not being an employee or a
Director or not having any interest in the bidder's company / firm) where audited accounts
are not mandatory as per law and notary public with legible stamp.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 15 of
INSTRUCTIONS TO
If the bidder does not provide the above confirmation or appropriate document or any evidence,
then it will be presumed that they do not qualify for any preference admissible in the Public
Procurement Policy (PPP)
Further, MSEs who are availing the benefits of the Public Procurement Policy (PPP) 2012 get
themselves registered with MSME Data Bank being operated by NSIC, under SME Division, M/o
MSME, in order to create proper data base of MSEs which are making supplies to CPSUs.
34.6 The benefit of policy are not extended to the traders/dealers/ Distributors /Stockiest/Wholesalers.
34.7 NSIC has initiated a scheme of “Consortia and Tender Marketing Scheme” under which they are
assisting the Micro & Small enterprises to market their products and services through tender
participation on behalf of the individual unit or through consortia.
34.8 Accordingly, if the MSEs or the consortia, on whose behalf the bid is submitted by NSIC, is meeting
the BEC and other terms and conditions of tender their bid will be considered for further evaluation.
Further, in such cases a declaration is to be submitted by MSE/ consortia on their letter head (s)
that all the terms and conditions of tender document shall be acceptable to them.
34.9 Present Tender items are split able.
35.0 ANTI-PROFITEERING CLAUSE
As per Clause 171 of GST Act it is Mandatory to pass on the benefit due to reduction in rate of tax or from
input tax credit to the consumer by way of commensurate reduction in prices. The Supplier of Goods /
Services may note the above and quote their prices accordingly. Bidder shall submit an undertaking to this
effect as per the format enclosed. .
36.0 PROVISION REGARDING POLICY TO PROVIDE PURCHASE PREFERENCE
(LINKED WITH LOCAL CONTENT) (PP-LC)
SHALL BE AS PER APPENDIX - I TO ITB for SPECIAL PURCHASE CONDITIONS.
37.0 UNSOLICITED POST TENDER MODIFICATION
37.1 Bidders are advised to quote as per terms and conditions of the Bidding Document and not to stipulate
deviations / exceptions. Once quoted, the bidder shall not make any subsequent price changes, whether
resulting or arising out of any technical / commercial clarifications and details sought on any deviations,
exceptions or stipulations mentioned in the bid unless any amendment to Bidding Document is issued by
BGRL. Similarly, no revision in quoted price shall be allowed should the deviations stipulated by him are
not accepted by Owner and are required to be withdrawn by him in favour of stipulation of the Bidding
Document. Any unsolicited proposed price change is likely to render the bid liable for rejection.
37.2 In the event of any suo-moto price increase sought by a bidder subsequent to the bid due date and which is
not as a result of any change in scope of work or terms and conditions, the bid of such a bidder shall be
37.3 After opening of price bid, if the bidder increases the price, though within the validity period and even
though the offer remains lowest, the bid should be rejected. In such event, the EMD of bidder shall be
forfeited and shall not be considered for future enquiries for such actions.
37.4 Suo-moto Price reduction after price bid opening are to be ignored for evaluation. However, if the same
bidder happens to be the lowest based on original price bids, the benefit of such reduction may be availed
of while placing order.
37.5 Canvassing in any form will make the bid liable for rejection.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 16 of
INSTRUCTIONS TO
F. AWARD OF CONTRACT
38.0 AWARD OF CONTRACT
38.1 The Owner will place the order on the successful bidders whose bid have been determined to be
substantially responsive and have been selected for award on OVERALL LOWEST(L1) COST BASIS.
39.0 BGRL'S RIGHT TO ACCEPT OR REJECT ANY BID
39.1 BGRL reserves the right to accept or reject any bid and to annul the bidding process and reject all bids at
any time prior to award of contract, without thereby incurring any liability to the affected bidder or bidders
or without any obligation to inform the affected bidder or bidders of the grounds or the reasons for BGRL’s
39.2 in the opinion of BGRL, if the total price or certain item rates quoted by the lowest bidder are considered
high, he may invite the lowest bidder for price negotiation. lowest bidder shall attend such negotiation
meetings and if requested by BGRL shall provide the analysis of rates / break-up of amount quoted by him
for any or all items of schedule of rates to demonstrate the reasonability. as a result of negotiation, bidder
may offer rebate on his earlier quoted price.
40.0 NOTIFICATION OF AWARD / FAX OF ACCEPTANCE
40.1 Bidder, whose bid is accepted by BGRL, shall be issued Letter of Intent (LOI) prior to expiry of bid validity.
Bidder shall confirm acceptance by returning a signed copy of the LOI.
40.2 BGRL/ TRACTEBEL shall not be obliged to furnish any information / clarification / explanation to the
unsuccessful Bidders as regards non-acceptance of their bids, except for refund of EMD to unsuccessful
Bidders, BGRL shall correspond only with the successful Bidder".
41.0 CONTRACT AGREEMENT AND SIGNING OF AGREEMENT
41.1 The Contractor shall execute a formal contract with BGRL within specified period from the date of issue
of Detailed Letter of Acceptance on a non-judicial stamp paper and of appropriate value. The cost of non-
judicial stamp paper shall be borne by the Contractor.
41.2 Contract documents for agreement shall be prepared after the acceptance of bid. Until the
final contract documents are prepared and executed, this Bidding Document together with the annexed
documents, modifications, deletions agreed upon by BGRL and bidder’s acceptance thereof shall constitute
a binding contract between the successful Bidder and BGRL based on terms contained in the aforesaid
documents and the finally submitted and accepted prices.
41.3 The contract shall be signed directly between Owner and Contractor.
41.4 The Contract document shall consist of the following:
i) Contract Agreement on Non Judicial Stamp Paper
ii) Detailed Letter of Award / Acceptance along with enclosures
iii) Original Bidding Document.
iv) Amendment / Corrigendum to original Bidding Document issued, if any.
v) Letter of Intent (LOI)
vi) Integrity Pact
41.5 For all works of value 2 (Two) Lakhs and more, a formal agreement shall be signed between BGRL and
Contractor in the format given in GCC, on non-judicial stamp paper of appropriate value. Cost of stamp
paper shall be borne by the Contractor. Payments for such jobs shall be made by BGRL only after signing
agreement by authorized representatives of BGRL and the Contractor. One original plus 2 (Two) copies of
the contract documents shall be signed by the contractor and other copies shall be stamped. Original
agreement on stamp paper shall be retained by BGRL and one signed copy shall be given to Consultant and
the Contractor.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 17 of
INSTRUCTIONS TO
42.0 MODIFICATION OF INSTRUCTIONS TO TENDER
42.1 Instructions to Tenderers of GCC stand modified to the extent as specified in this Instructions to Bidders.
43.0 CONTRACT PERFORMANCE GUARANTEE / SECURITY DEPOSIT
43.1 After Notification of Award of works by BGRL, the successful bidder shall furnish a performance guarantee
/ security deposit. The Security Deposit may be furnished in the form of Accountant Payee Demand Draft
payable to BGRL or Bank Guarantee in the prescribed format. The BG shall be from any Indian Scheduled
Bank or an International Bank of repute having a branch in India or a corresponding banking relationship
with an Indian Scheduled Bank.
44.0 CARTEL FORMATION
44.1 In case any Bidder is found to be involved in cartel formation, his bid will not be considered for evaluation
/ placement of order. Such bidder will also be debarred from bidding in future.
45.0 FRAUDULENT PRACTICES
45.1 BGRL requires that Bidders / Vendors / Contractors observe the highest standard of ethics during the award
/ execution of Contract. “Fraudulent Practices” means a misrepresentation of facts in order to influence the
award of a Contract to the detriment of BGRL, and includes collusive practice among bidders (prior to or
after bid submission) designed to establish bid prices at artificial non-competitive levels and to deprive
BGRL of the benefits of free and open competition.
45.2 BGRL will reject a bid for award if it determines that the bidder recommended for award has engaged in
fraudulent practices in competing for the Contract in question.
45.3 Bidder is required to furnish the complete and correct information / documents required for evaluation of
their bids. If the information / documents forming basis of evaluation is found to be false / forged, the same
shall be considered adequate ground for rejection of bids and forfeiture of Earnest Money Deposit.
45.4 In case, information / document furnished by the Bidder / Vendor / Contractor forming basis of evaluation
of his bid is found to be false / forged after the award of the contract. BGRL shall have full right to terminate
the contract and get the remaining job executed at the risk & cost of such Bidder / Vendor / Contractor
without any prejudice to other rights available to BGRL under the contract such as forfeiture of CPBG /
Security Deposit, withholding of payment etc.
45.5 In case, this issue of submission of false document comes to the notice after execution of work, BGRL shall
have full right to forfeit any amount due to the Bidder / Vendor / Contractor along with forfeiture of CPBG
/ Security Deposit furnished by the Bidder / Vendor / Contractor.
45.6 Further, such Bidder / Vendor / Contractor shall be put on Blacklist / Holiday / Negative List of BGRL
debarring them from future business with BGRL for a time period, as per the prevailing policy of BGRL.
46.0 INTEGRITY PACT
The bidder(s) are required to execute the “Integrity Pact” attached in the Bid Document. In case a bidder
does not sign the Integrity Pact, his bid shall be liable for rejection.
47.0 PROVISIONS FOR STARTPUS [APPLICABLE FOR INDIAN BIDDERS ONLY] (AS
DEFINED IN GAZETTE NOTIFICATION NO. D.L-33004/99 DATED 18.02.2016 AND
23.05.2017 OF MINISTRY OF COMMERCE AND INDUSTRY AND AS AMENDED FROM
[NOT APPLICABLE FOR THIS TENDER.]
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 18 of
INSTRUCTIONS TO
48.0 IEM DETAILS
Integrity Pact Program –Details of Independent External Monitors to be mentioned in tender documents-
Shri. Ramabhadran Shri. Virendra Bahadur Shri. Anupam
Ramanujam Singh Kulshreshtha
ADDRESS ADDRESS ADDRESS
44/24, 3rd trust Cross H.No. B-5/64, Vineet B-3/3, ‘Yarrows
Street, Khand, Gomati Nagar, Apartments’,
Mandavelipakkam, Lucknow - 226010 Plot C-58/5, Sector
Chennai 600028. Noida, UP -201309
Mob. No. 9495511954 Mob. No. 8853760730 Mob. No.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA. Page 19 of
INSTRUCTIONS TO BIDDERS (ITB) G11033
BHARAT GAS RESOURCES LIMITED
CITY GAS DISTRIBUTION PROJECT FOR AHMEDNAGAR
& AURANGABAD GA AND SANGLI & SATARA GA
SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION
COMPRESSOR FOR CITY GAS DISTRIBUTION
PROJECT FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA
APPENDIX - I TO ITB
THE APPENDIX - I TO ITB FOR SPECIAL PURCHASE CONDITIONS
DATED 07.Sept.2020 OF
BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
SHALL BE ALSO REFERRED TO FOR
BHARAT GAS RESOURCES LIMITED (BGRL) TENDERS.
ALL THE TERMS & CONDITIONS IN THE ENCLOSED APPENDIX - I
TO ITB SHALL BE APPLICABLE FOR THIS TENDER.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA Page 1 of
Version:7 sept20
SPECIAL PURCHASE CONDITIONS (WHEREVER APPLICABLE)
A. POLICY FOR PURCHASE PREFERENCE LINKED TO LOCAL CONTENT: APPLICABLE IN
GLOBAL TENDERS : Under this policy the bidders are allowed to avail the purchase preference
linked with attaining the stipulated local content. In order to avail the purchase preference under this
policy bidder shall achieve minimum local content (LC) of 20 %. The policy shall be implemented in
the following manner.
a. In case the lowest (L1) bidders meet the stipulated LC criteria, the bidders shall be awarded
to such bidder.
b. In case none of the bidders meet the stipulated LC criteria, the order shall be awarded to
c. In case the lowest bidder does not meet the stipulated LC criteria, the bidders shall be ranked
in the ascending order of evaluated prices and next bidder meeting minimum stipulated LC
and with his evaluated prices band of (+) 10% of the lowest bidders evaluated price, shall
be given opportunity to supply 50% of requirement by matching the lowest bidders evaluated
price. However, if 50% quantity works out of fraction of quantity, the bidders shall be
considered for next higher quantity. In case the quantity cannot be spilt, the order shall be
placed with entire quantity.
d. In case there are more than one bidder within the price band of (+) 10% of the lowest bidders
evaluated price, they shall be ranked in ascending order of their evaluated price. The
opportunity of matching the price shall be accordingly starting the lowest bidder out of these
bidders and in case of his refusal, to the next bidder, and so on.
e. In case none of the bidders who meet the stipulated LC criteria agree to match the lowest
price, the natural lowest bidder will be awarded to job.
f. The option in case of MSE bidders qualifying under both policies, namely, Purchase
Preference under the Public Procurement Policy – 2012 (PPP – 2012) from MSE bidders
and Purchase Preference Linked with Local Content (PP-LC 2017) shall exercised as under
i. The MSE bidder can avail only one out of the two applicable purchase preference
policies, i.e. PP-LC2017 or PPP-2012 and therefore, bidder will be required to
furnish the option under which he desires to avail the purchase preference. This
option must be declared within the offer and in case bidder fails to do so, although
he is eligible for the both policies, his offer would be evaluated considering PPP-
2012 as the default chosen option. In case a MSE opts for preference under PPP-
2012, he shall not be eligible to claim benefit under PP-LC 2017 (irrespective of the
fact whether he furnishes the detail of LC in his and this LC meets the stipulated LC
ii. In case a MSE bidder opts for purchase preference based on PP-LC 2017, he shall
not be entitled to claim benefit of purchase preference benefit as applicable for MSE
bidders under PPP-2012. However, the exemption from furnishing bidding
document fee and bid security shall continue to be available to such a bidder.
g. In view of the above, the bidders quoted price against various items of inquiry shall remain
valid even in case of splitting of quantities of the items, except in the case of the items where
the quantity cannot be split since these will be awarded in a lot or as a package or Group.
h. While evaluating the bids, for price matching opportunities and distribution of quantities
among the bidders, the order of precedence shall be as under:
i. MSE bidder (PPP-2012)
ii. PP-LC complied bidder(PP-LC)
Examples of Purchase Preference
Non divisible Items
L1 bidder in non MSE, NON PP-LC bidder
L2 bidder is PPC-LC (within 10%)
L3 bidder is MSE bidder (within 15%)
MSE bidder shall be given preference to match the L1 price. If L3 bidder match the L1 price,
order shall be placed on him, otherwise option for matching the L1 price shall be given to L2
Divisible Items
L1 bidder is non MSE, non PP-LC bidder
L2 Bidder is PPC-LC (within 10%)
L3 bidder is MSE bidder (within 15%)
MSE bidder shall be given preference to match the L1 price. If bidder matches the L1 price order
shall be placed on him for the quantity specified in the bidding document. For the balance
quantity (i.e. 50% of tendered quantity / value) option for matching the L1 price shall be given
to L2 bidder (PP-LC) Balance quantity shall be awarded to natural lowest bidder.
For further clarification, in case an item has quantity 4 nos. then 1 no. can be given to MSE
bidders, 2 to PP-LC bidder and left out 01 no. to natural L1 bidder.
1. In case lowest bidder is a MSE bidder, the entire work shall be awarded to him without
resorting to purchase preference to bidders complying local content.
2. In case lowest bidder is a PP-LC bidder purchase preference shall be restored to MSE
bidders as per provision specified in the enquiry document w.r.t. PPP-2012 only.
Certification of Local Content
Manufacturing of goods and/or providers of services, seeking Purchase Preference under the
policy, shall be obliged to certify the LC of goods, services or EPC contracts as under:
At bidding stage :
Bidder shall furnish the percentage of the local content, taking into account the factors and
criteria listed out in the policy. These details shall be required only aggregate level like supply
The bidder claiming the PP-LC benefit shall be required to furnish an undertaking on bidder’s
letterhead (Annexure1_PPLC) confirming his meeting the Local Content and this undertaking
shall be certified as under:
- Where the total quoted value is less than INR 5 Crore: The LC content shall be self-
assessed and certified by the authorized signatory of the bidder singing the bid.
- Where the total quoted value is INR 5 Crore or above,
I) The proprietor and an independent Chartered Accountant, not being an employee of
the firm, in case of a proprietorship firm
II) Any one of the partners and an independent Chartered Accountant, not being an
employee of the firm in the case of partnership firm.
III) Statutory auditors in case of the company. However, where statutory auditors are not
mandatory as per laws of the country where bidder is registered, an independent
Chartered Accountant, not being an employee of the bidders organization.
1. LC of goods shall be computed on the basis of the cost of domestics components in goods,
compared to the whole cost product. The whole cost of product shall be constituted of the
cost spent for the production of the goods, covering: direct component (material) cost; direct
manpower cost; factory overhead cost and shall exclude profit, company overhead cost and
taxes for the delivery of goods.
2. However, LC of services shall be calculated on the basis of the ratio of services cost of
domestic component in services to the total cost of services: a) cost of component (material)
which is used; b) manpower and consultant cost; cost of working equipment/facility; c)
general service cost, excluding profit, company overhead cost, taxes and duties.
The onus of submission of appropriately certified documents lies with the bidder and
purchaser shall not have any liability to verify the contents and will not be responsible for the
same. However, in case of the procuring company has any reason to doubt the authenticity
of the local content, it reserved the right to obtain the complete backup calculation before
award of the work failing which the bid shall be rejected.
After award of contract:
o Where the estimated value is less than INR 5 Crore:
The LC Certificate shall be submitted along with each invoice duly self-certified by the
authorized signatory of the bidder
o Estimated value is INR 5 Crore above
Supplier shall provide the necessary local content documentation to the statutory auditor, who
shall review and determine that local content requirement have been met, and issue a local
content certificate to that effect on behalf of Procurement Company, stating the percentage of
local content in the goods of services measured.
However, procuring company shall also have the authority to audit as well as witness
production processes to certify the achievement of the requisite local content and/or to obtain
the complete back up calculation before award of work failing which the bid shall be rejected
and appropriate action may be initiated against the bidder
Failure of bidder in complying with the local content post award
In case a bidder, who has specified in his bid that the bid meets the minimum Local Content
specified in the enquiry document, fails to achieve the same, the following action shall be taken
by the procuring company:
- Pre-determined penalty @10% of total contract value
- Banning business with the supplier/contractor for a period of one year.
To ensure the recovery of above pre-determined penalty, payment against dispatch shipping
document shall be modified to the extent that the 10% payment out if this milestone payment
shall be released after competition of this milestone as well as submission of certification
towards achievement of local content as per provision of enquiry document. Alternatively, this
payment can be release against submission of additional bank guarantee valid till completion
schedule, plus 3 months or as required by purchasing company.
Purchase Preference in case where Negotiation is also required
In case purchase preference is applicable, but negotiation is to be conducted with L1 bidder
negotiation shall be carried out. MSE and / or LC complied bidder shall be offered to match
the negotiated prices (even if, post negotiation, they are higher by more than 10% as
compared to L1 bidder provided they within 10% of L1 bidder as per original quoted prices)
and left out quantity, if any, as per provision of enquiry document shall be awarded to that
Table: CALCULATION OF LOCAL CONTENT – GOODS
Name of manufacturer Calculation of manufacturer cost per no unit of product
Cost component Cost Cost (Imported Cost Total % Domestic
(Domestic component) Rs./US$ Component
I. Direct material cost
II. Direct Labour cost
III. Factory Overhead
IV. Total Production
% LC Goods = Total cost (IVC)-Total component cost (IVB) X
Total Cost (IVC)
%LC Goods = Total Domestic component cost (IVA) X
Total Cost(IVC)
B. DOMESTIC VALUE ADDITION DECLARATION
As procurement of the tendered item is covered under Annexure2_DMISP of the DMI&SP policy, the
bidder shall furnish the Affidavit of self -declaration issued by the domestic manufacturer to BPCL
declaring that the iron and steel products is domestically manufactured in terms of the domestic value
addition prescribed (currently as minimum15 %). Formula for value addition, certification, penal action
etc. shall be as per the policy document to be published as Annexure XI of tender document.
Documents required:
Affidavit of self –certification regarding domestic value addition in Iron & Steel products on Rs 100/-
Stamp paper, verified by TPIA, as per the format (referred as FORM-1 in the policy document).
C. START-UP CLAUSE:
In case a Start-up is interested in supplying a tendered item but does not meet the Pre-Qualification
Criteria(PQC)/Proven Track Record (PTR) of prior Turnover norm as indicated in the tender document,
the Start-up may be requested to write a detailed proposal separately and not against the present tender
requirement, to the tender issuing authority about its product. Such proposal should be accompanied by
relevant documents in support of Start-ups as under :
I. Certificate of Recognition issued by Department of Industrial Policy and Promotion (DIPP),
Ministry of Commerce and Industry, GOI.
II. Certificate of Incorporation/ Registration.
III. Audited P&L Statement of all the financial years since incorporation.
IV. In case where balance sheet has not been prepared, bidder shall submit a certificate in Original
from its CEO/CFO stating the turnover of the bidding entity separately for each Financial Year
Since incorporation along with declaration stating the reason for not furnishing the audited P&L
statement. The Certificate shall be endorsed by Chartered Accountant/ Statutory Auditor.
D. COMPLIANCE OF RESTRICTIONS FOR COUNTRIES WHICH SHARE LAND BORDER WITH
Restrictions under Rule 144(xi) of the General Financial Rules, 2017 – Reference OM
no. 6/18/2019 – PPD dtd. 23.07.2020 (read along with any
subsequent clarifications/amendments thereof) issued by Ministry
of Finance, Public Procurement Division
(https://doe.gov.in/procurement-policy-divisions)
(I) Any bidder* from a country which shares a land border with India will be eligible to bid in
this tender only if bidder is registered with Competent Authority. The Competent authority for the
purpose of registration shall be the Registration Committee constituted by the Department of
Promotion of Internal Trade (DPIIT) of Govt. of India. (* In case of domestic tenders, the term
“bidder” shall mean domestic bidders as defined under clause III below)
(II) “Bidder” (Including the term ‘Tenderer’, ‘Consultant’ or ‘Service Provider’ in certain contexts)
means any person or firm or company, including any member of a consortium or joint venture (that
is an association of several persons, or firms or companies), every artificial juridical person not
falling in any of the descriptions of bidders stated herein before, including any agency branch or
office controlled by such person, participating in a procurement process.
(III) “Bidder from a country which shares a land border with India” means:
a) An entity incorporated, established or registered in such country; or
b) A subsidiary of an entity incorporated, established or registered in such country; or
c) An entity substantially controlled through entities incorporated, established or registered
in such country; or
d) An entity whose beneficial owner is situated in such a country; or
e) An Indian (or other) agent of such an entity; or
f) A natural person who is a citizen of such a country; or
g) A consortium or joint venture where any member of the consortium or joint venture falls
under any of the above.
(IV) “Beneficial owner” for the purpose of para (III) above will be as under:
1. In case of a company or Limited Liability Partnership, the beneficial owner is the natural
person(s), who, whether acting alone or together, or through one or more juridical person(s), has a
controlling ownership interest or who exercises control through other means. Explanation:
a. “Controlling ownership interest “means ownership of an entitlement to more than twenty-
five percent of shares or capital or profits of the company;
b. “Control shall include the right to appoint majority of the directors or to control the
management or policy decisions including by virtue of their shareholding or management
rights or shareholders agreements or voting agreements;
2. In case of a partnership firm, the beneficial owner is the natural person(s) who, whether
acting alone or together, or through one or more juridical person, has ownership of entitlement to
more than fifteen percent of capital or profits of the partnership;
3. In case of an unincorporated association or body of individuals, the beneficial owner is the
natural person(s), who, whether acting alone or together, or through one or through one or more
juridical person(s), has ownership of or entitlement to more than fifteen percent of the property or
capital or profits of such association or body of individuals;
4. Where no natural person is identified under (1) or (2) or (3) above, the beneficial owner is
the relevant natural person who holds the position of senior managing official;
5. In case of a trust, the identification of beneficial owner(s) shall include identification of the
author of the trust, the trustee, the beneficiaries with fifteen percent or more interest in the trust and
any other natural person exercising ultimate effective control over the trust through a chain of control
(V) An “Agent” is a person employed to do any act for another, or to represent another in dealings
with third person.
(VI) The successful bidder shall not be allowed to sub-contract works to any contractor from a
country which shares a land border with India unless such contractor is registered with the Competent
Undertaking as per Annexure3_LandBorder
E. MSE CLAUSE & CA CERTIFICATE FOR MICRO AND SMALL ENTERPRISES ( MSEs) : Micro
and Small Enterprises (MSEs) registered with District Industries Centers or Khadi and Village
Industries Commission or Khadi and Village Industries Board or Coir Board or National Small
Industries Corporation or Directorate of Handicrafts and Handloom or any other body specified by
Ministry of Micro, Small and Medium Enterprises for the item mentioned in the EOI are exempted
from submission of EMD. Such bidders must upload the necessary MSE documents to claim
exemption for Earnest Money Deposit in e-tendering portal. MSE documents (UAM/EM-II/ Udyam
Registration) need to be certified by Chartered Accountant (CA) as per enclosed format, refer
Annexure4_CACertificate. The original hardcopy of CA certificate and MSE document with original stamp
and seal of CA must be submitted in the tender box, on or before due date of the EOI. If NSIC certificate is
being submitted then the bidder must submit a TPIA verified (copy with original stamp and seal of TPIA)
copy of the same in the tender box. Alternatively, documents signed digitally by the CA/TPIA agency, as
applicable can be uploaded over e-tendering site
CA Certificate with respect to MSE Document: All bidders quoting as MSE, should submit CA
certificate in original, along with MSE doc. (UAM/EMII/ Udyam Registration) documents like SC/ST
Certificate, Women Entrepreneur proof, to avail the benefits of Public Procurement Policy as per
MSMED Act 2006/Public Procurement Policy Order 2012. In case CA certificate is not submitted,
bid of the vendor may be rejected at EMD stage. Please find below further points with respect to
The CA certificate should be dated after the date of floating of the subject EOI
and shall be specific to the EOI for which bid is being submitted.
Format of the CA certificate is attached as Annexure IV for reference and bidder
needs to submit certificate strictly in the said format else bid shall be rejected
EhEdK/E^dZhd/KEdK/Z^
BBBBBBBBBBBBBBBBBBB
:H 0VBBBBBBBBBBBB 1DPH RI %LGGHU KHUHE\ FRQILUP WKDW IROORZLQJ SXUFKDVH
SUHIHUHQFHWREHFRQVLGHUHG
'HVFULSWLRQ 3UHIHUHQFH
3XUFKDVH 3UHIHUHQFH OLQNHG ZLWK ORFDO
3XUFKDVH 3UHIHUHQFH XQGHU 3XEOLF
3URFXUHPHQW3ROLF\IRU06(
L 3OHDVHLQGLFDWH\RXUSUHIHUHQFHDJDLQVWRQO\RQHSROLF\
LL 7KH DERYH SUHIHUHQFH VKDOO EH H[WHQGHG RQO\ DIWHU VXEPLVVLRQ RI UHTXLVLWH
GRFXPHQWV DVPHQWLRQHGLQWKHWHQGHUGRFXPHQWV
LLL ,QFDVHDELGGHULVHOLJLEOHWRVHHNEHQHILWXQGHU33/&SROLF\DVZHOODV333IRU
06(WKHQWKHELGGHUVKRXOGFDWHJRULFDOO\VHHNEHQHILWVDJDLQVWRQO\RQHRI
WKHWZRSROLFLHVLHHLWKHU33/&DQG06(SROLF\
LY ,QFDVHD06(VELGGHURSWVIRUSXUFKDVHSUHIHUHQFHEDVHGRQ33/&KHVKDOOQRW
EH HQWLWOHGWR FODLP SXUFKDVH SUHIHUHQFH EHQHILW DYDLODEOH WR 06( %LGGHUV XQGHU
333IRU06(+RZHYHUWKHH[HPSWLRQVIURPIXUQLVKLQJ%LGGLQJ'RFXPHQW
IHHDQG%LGVHFXULW\(0'VKDOOFRQWLQXHWREHDYDLODEOHWR06(%LGGHUV
Y 7KHRSWLRQRQFHH[HUFLVHGFDQQRWEHPRGLILHGVXEVHTXHQWO\
3ODFH >6LJQDWXUHRI$XWKRUL]HG6LJQDWRU\RI%LGGHU@
'HVLJQDWLRQ
EhEdK/E^dZhd/KEdK/Z^
BBBBBBBBBBBBBBBBBBB
:H 0VBBBBBBBBBBBB 1DPH RI %LGGHU KDYH VXEPLWWHG ELG QR«««««««
DJDLQVWDIRUHVDLGWHQGHU
:HKHUHE\FRQILUPWKDWZHDUHHOLJLEOHIRUEHQHILWXQGHU3XUFKDVH3UHIHUHQFH OLQNHGZLWK
ORFDO FRQWHQW DQG XQGHUWDNH WKDW ZH PHHW WKH PDQGDWRU\ PLQLPXP /RFDO FRQWHQW
UHTXLUHPHQWRI«««««««««VSHFLILHGLQWHQGHUGRFXPHQW7KHFHUWLILFDWHIURP
6WDWXWRU\ DXGLWRU LQ WKLV UHJDUG KDV EHHQ VXEPLWWHG LQ XQSULFHG ELG DQG WKH YDOXH
SHUFHQWDJHRIWKHORFDOFRQWHQWKDVEHHQSURYLGHGLQSULFHGELG
:HIXUWKHUFRQILUPWKDWLQFDVHZHIDLOWRPHHWWKHPLQLPXPORFDOFRQWHQW%3&/ZLOOWDNH
DFWLRQDVSHUSURYLVLRQRIWHQGHUGRFXPHQW
3ODFH >6LJQDWXUHRI$XWKRUL]HG6LJQDWRU\RI%LGGHU@
'HVLJQDWLRQ
EhEdK/E^dZhd/KEdK/Z^
BBBBBBBBBBBBBBBBBBB
:H««««««««««««««« 1DPHRIWKH6WDWXWRU\$XGLWRU KDYHYHULILHG
UHOHYDQWUHFRUGVRI0V«««««««««««« 1DPHRIWKHELGGHU DQGFHUWLI\WKDW
0V«««««««««« 1DPHRIWKHELGGHU PHHWWKHPDQGDWRU\PLQLPXP/RFDO
FRQWHQW UHTXLUHPHQW RI «« VSHFLILHG LQ WHQGHU GRFXPHQW
1DPHRI$XGLW)LUP >6LJQDWXUHRI$XWKRUL]HG6LJQDWRU\@
EhEdK/E^dZhd/KEdK/Z^
BBBBBBBBBBBBBBBBBBB
:H««««««««««««««« 1DPHRIWKH6WDWXWRU\$XGLWRU KDYHYHULILHG
UHOHYDQWUHFRUGVRI0V«««««««««««« 1DPHRIWKHELGGHU DQGFHUWLI\WKDW
0V«««««««««« 1DPHRIWKHELGGHU PHHWWKHPDQGDWRU\PLQLPXP/RFDO
FRQWHQW UHTXLUHPHQW RI «« VSHFLILHG LQ WHQGHU GRFXPHQW
1DPHRI$XGLW)LUP >6LJQDWXUHRI$XWKRUL]HG6LJQDWRU\@
Undertaking with respect to Compliance of Restrictions for Countries which
share land border with India – as stipulated by Govt. of India.
(On Company Letter Head, to be signed by the duly authorized
TENDER NO. : ………………
BHARAT GAS RESOURCES
Dear Sir/Madam,
In line with the guidelines issued for compliance of Restrictions for Countries which share
land border with India – as issued by Govt. of India in July’2020,
I/We have read the clause regarding restrictions on procurements from a bidder of a
country which shares a land border with India and on sub-contracting to contractors from
such countries.
a. I/We certify that this bidder is not from such a country or if from such a country
has been registered with the competent authority. I hereby certify that this
bidder fulfills all requirements in this regard and is eligible to be considered*.
b. I/We certify that this bidder is not from such a country or if from such a country
has been registered with the competent authority and will not sub-contract any
work to a contractor from such countries unless such contractor is registered
with the competent authority. I hereby certify that this bidder fulfills all
requirements in this regard and is eligible to be considered*.(Applicable for
works involving possibility of sub-contracting)
I/We hereby certify that I/We fulfill all requirements in this regard and am/are eligible to
[*Where applicable, evidence of a valid registration by the Competent Authority
shall be attached]
Name and Signature of the Authorised Signatory
CERTIFICATE CONFIRMING ELIGIBILTY FOR BENEFITS OF PUBLIC PROCUREMENT POLICY AS PER
This is to confirm that we have verified the investment limits, turnover and other details of M/s ________
and certify that they satisfy the eligibility criteria as per MSMED Act, 2006 and other
notifications/circulars/amendments issued time to time in this regard. Accordingly, M/s _______ is a
Micro/Small enterprise (kindly tick in appropriate box) under the said Act and are eligible to claim the
benefits of public procurement policy as per MSMED Act 2006 and Public Procurement Policy Order
and their revisions for the tender mentioned above.
Micro enterprise -
Small enterprise -
In case applicable:
Based on our verification of share holding pattern and other details, it is certified that M/s ________
meets the eligibility criteria under SC/ST provision of Public Procurement Policy Order 2012 and other
notifications/circulars issued time to time in this regard and are hence eligible to claim benefits pertaining
to SC/ST under the Public Procurement Policy Order 2012 and its revision.
In case applicable:
Based on our verification of share holding pattern and other details, it is certified that M/s _________
meets the eligibility criteria under Women Entrepreneur provision of Public Procurement Policy Order
2012 and other notifications/circulars issued time to time in this regard and are hence eligible to claim
benefits pertaining to Women Entrepreneur under the Public Procurement Policy Order 2012 and its
GENERAL CONDITIONS OF
BHARAT GAS RESOURCES LIMITED
CITY GAS DISTRIBUTION PROJECT FOR AHMEDNAGAR
& AURANGABAD GA AND SANGLI & SATARA GA
SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION
COMPRESSOR FOR CITY GAS DISTRIBUTION
PROJECT FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA
GENERAL CONDITIONS OF CONTRACT (GCC)
THE GCC DATED 22.01.2020 OF
BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
SHALL BE ALSO REFERRED TO FOR
BHARAT GAS RESOURCES LIMITED (BGRL) TENDERS.
ALL THE TERMS & CONDITIONS IN THE ENCLOSED GCC SHALL BE
APPLICABLE FOR THIS TENDER.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA Page 1 of
GENERAL CONDITIONS OF CONTRACT
BHARAT PETROLEUM CORPORATION LIMITED
I DEFINITION OF TERMS
II GENERAL INFORMATION ABOUT SITE
2.1 LOCATION OF SITE & ACCESSIBILITY
2.2 SCOPE OF WORK
2.3 LAND FOR CONTRACTOR’S FIELD, GODOWN AND
2.4 SAFETY STANDARDS FOR TEMPORARY BUILDINGS
III GENERAL INSTRUCTION FOR THE TENDERER
3 SUBMISSION OF TENDER
5 PURCHASE PREFERENCE
6a EARNEST MONEY
6b CONVERSION OF EMD TO SECURITY DEPOSIT
7a BID VALIDITY
7b LANGUAGE OF BID
8 ADDENDA / CORRIGENDA
9 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
10a INTEGRITY PACT (IP)
10b HOLIDAY LISTING
10c FOREIGN BIDDERS
11 COLLECTION OF DATA TENDERER’S RESPONSIBILITY & TIME SCHEDULE
12 RETIRED GOVERNMENT OR COMPANY OFFICER
13 SIGNING OF THE CONTRACT
14a FIELD MANAGEMENT
14b CONSULTANCY CONTRACTS
IV INTERPRETATION OF CONTRACT DOCUMENTS
15 INTERPRETATION OF CONTRACT DOCUMENT
16 SPECIAL CONDITIONS OF CONTRACT
17 CONTRACTOR TO OBTAIN HIS OWN INFORMATION
18 PERFORMANCE SECURITY DEPOSIT/RETENTION MONEY
19 TIME OF PERFORMANCE
20 FORCE MAJEURE
21 EXTENSION OF TIME
22 LIQUIDATED DAMAGES FOR DELAY
23 SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS
REASONABLE COMPENSATION
WITHOUT REFERENCE TO ACTUAL LOSS
24 TERMINATION / OFFLOADING
25 FORFEITURE OF SECURITY DEPOSIT
26 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED
27 CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF ACTION NOT
TAKEN UNDER CLAUSE
28 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK
29 CHANGES IN CONSTITUTION
30 IF THE CONTRACTOR DIES
31 EMPLOYEES OF THE OWNER NOT INDIVIDUALLY LIABLE
32 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS
33 CONTRACTOR’S OFFICE AT SITE
34 CONTRACTOR’S SUBORDINATE STAFF AND THEIR CONDUCTS
35 SUB-LETTING OF WORK
36 POWER OF ENTRY
37 CONTRACTOR’S RESPONSIBILITY WITH OTHER AGENCIES
38 OTHER AGENTS AT SITE
40 RIGHTS OF VARIOUS INTERESTS
41 RIGHT OF OWNER TO DETERMINE / TERMINATE CONTRACT
42 TERMINATION FOR CONVENIENCE
43 PATENTS AND ROYALTIES
45 OPERATION OF CONTRACT
V PERFORMANCE OF WORK
46 EXECUTION OF WORKS
47 COORDINATION AND INSPECTION OF WORK
48 WORK IN MONSOON AND DEWATERING
49 WORK ON SUNDAYS AND HOLIDAYS
50 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION WORK
51 DRAWINGS TO BE SUPPLIED BY THE OWNER
52 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR
53 SETTING OUT WORKS
54 RESPONSIBILITY FOR LEVEL AND ALIGNMENT
55 MATERIALS TO BE SUPPLIED BY CONTRACTOR
56 MATERIALS SUPPLIED BY OWNER
57 CONDITIONS FOR ISSUE OF MATERIALS
58 MATERIALS PROCURED WITH ASSISTANCE OF OWNER
59 MATERIALS OBTAINED FROM DISMANTLING
60 ARTICLES OF VALUE FOUND
61 DISCREPANCIES BETWEEN INSTRUCTIONS
62 ALTERATIONS IN SPECIFICATIONS AND DESIGNS AND EXTRA WORK
63 VARIATION IN CONTRACT VALUE
64 ACTION WHERE NO SPECIFICATIONS ISSUED
65 ABNORMAL RATES
66 INSPECTION OF WORK
67 ASSISTANCE TO THE ENGINEERS
68 TESTS FOR QUALITY OF WORKS
70 ACTION AND COMPENSATION IN CASE OF BAD WORK
71 SUSPENSION OF WORKS
72 OWNER MAY DO PART OF WORK
73 POSSESSION PRIOR TO COMPLETION
74.1,2 PERIOD OF LIABILITY FROM THE DATE OF COMPLETION OF WORK
74.3 CARE OF WORKS
74.4 EFFECTS PRIOR TO TAKING OVER
VI BILLS / MEASUREMENT / PAYMENT
75 SCHEDULE OF RATES AND PAYMENTS
76 PROCEDURE FOR MEASUREMENT / BILLING OF WORK IN PROGRESS
77 LUMPSUMS IN TENDER
78 RUNNING ACCOUNT PAYMENTS TO BE REGARDED AS ADVANCES
80 PAYMENT OF CONTRACTOR’S BILL
81 CONCLUSION OF CONTRACT
82 MODE OF PAYMENT
83 COMPLETION CERTIFICATE
84 FINAL DECISION AND FINAL CERTIFICATE
85 CERTIFICATE FOR PAYMENTS AND EVIDENCE OF COMPLETION
VII TAXES / DUTIES / INSURANCE
86 TAXES & DUTIES
88 DAMAGE TO PROPERTY
VIII LABOUR LAWS AND OTHER REGULATIONS
90 IMPLEMENTATION OF APPRENTICES ACT, 1961
91 CONTRACTOR TO INDEMNIFY THE OWNER
92a HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS
92b MEDICAL FITNESS CERTIFACATION
93 SAFETY REGULATIONS
95 JURISDICTION
96 ORDER OF PRECEDENCE FOR WORKS/SERVICES CONTRACTS
97 LIMITATION OF LIABILITY
98 POLICE VERIFICATION OF CONTRACT STAFF AND TRANSPORT CREW AT
100 BUILDING AND OTHER CONSTRUCTION WORKERS CESS
IX MEMORANDUM OF AGREEMENT
PROFORMA OF BANK GUARANTEE
TAX RESIDENCY CERTIFICATE
BHARAT PETROLEUM CORPORATION LTD ACKNOWLEDGEMENT
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS
In the contract documents as herein defined where the context so admits, the following words and expressions will have following
1) “The Owner/Company/BPCL” means the Bharat Petroleum Corporation Limited, incorporated in India having its
registered office at 4 & 6, Currimbhoy Road, Ballard Estate, Mumbai - 400 038 or their successors or assigns
2) “The Contractor” means the person or the persons, firm or Company whose tender has been accepted by the Owner
and includes the Contractor’s legal representative, his successor and permitted assigns.
3) The “Managing Director” shall mean the Chairman and Managing Director of the Bharat Petroleum Corporation
Limited or his successor in office designated by the Owner.
4) The “Engineer-in-Charge” shall mean the person designated as such by the Owner and shall Include those who are
expressly authorised by the Owner to act for and on his behalf for operation of this contract.
5) The “Work” shall mean the works to be executed in accordance with the contract or part thereof as the case may be
and shall include extra, additional, altered or substituted works as required for purpose of the contract.
6) The “Permanent Work” means and includes works which will be incorporated in and form a part of the work to be
handed over to the Owner by the Contractor on completion of the contract.
7) The “Construction Equipment” means all appliances, Tools/Tackles and equipment of whatsoever nature for the use
in or for the execution, completion, operation or maintenance of the work unless intended to form part of the
Permanent work.
8) The “Site” means the areas on which the permanent works are to be executed or carried out and any other places
provided by the Owner for purpose of the contract.
9) The “Contract Document” means collectively the Tender Document. Designs. Drawings or Specifications, agreed
variations, if any, and such other document constituting the tender and acceptance thereof.
10) The “Consultant” means the consulting engineers Nominated/appointed by the Owner for this Project / job.
11) The “Sub-Contractor” means any person or firm or Company (other than the Contractor) to whom any part of the
work has been entrusted by the Contractor, with the written consent of the Engineer-in-Charge, and the legal
personal representatives, successors and permitted assigns of such person, firm or company.
12) The “Contract” shall mean the Agreement between the Owner and the Contractor for the execution of the works
including therein all contract documents.
13) The “Specification” shall mean the various technical specifications attached and referred to in the tender documents.
It shall also include the latest editions, including all addenda/corrigenda, of relevant Indian Standard Specification,
specifications of the other country published before entering into Contract.
14) The “Drawings” shall include maps, plans and tracings or prints thereof with any modifications approved in writing
by the Engineer-in-Charge and such other drawings as may, from time to time, furnished or approved in writing by
the Engineer-in-Charge.
15) The “Tender” means the tender submitted by the Contractor for acceptance by the Owner.
16) The “Alteration Order” means an order given in writing by the Engineer-in-Charge to effect additions to or deletion
from and alterations in the works.
17) The “Completion Certificate” shall mean the certificate to be issued by the Engineer-in-Charge to the contractor when
the works have been completed to his satisfaction.
18) The “Final Certificate” in relation to a work means the certificate issued by the Engineer-in-Charge after the period
of liability is over for releasing the retention money/PBG.
19) The “Period of Liability” in relation to a work means the specified period during which the Contractor stands
responsible for rectifying all defects that may appear in the works.
GENERAL INFORMATION ABOUT SITE
2.1 LOCATION OF SITE & ACCESSIBILITY:
The site location is described in the Special Conditions of Contract. The intending tenderer should inspect the site
and make himself familiar with site conditions and available facilities.
Entry into the BPCL areas is restricted depending on location/site. Only pass holders as also vehicles with special
permits are permitted in such restricted areas. Inside the premises access to various work spots is also further
regulated by permits issued for each area. Non-availability of access roads or permits for entry of vehicles/equipment
to any specific area shall in no case be the cause to condone any delay in execution of works or be the cause for any
claims or extra compensations.
2.2 SCOPE OF WORK
The scope of work is defined in the Special Conditions of Contract and specifications. The Contractor shall provide all
necessary materials, equipments / Tools and Tackles / Supervision / labour etc. for the execution and maintenance
of the work till completion unless otherwise mentioned in these tender documents. All materials that go with the
work shall be approved by Engineer-in-Charge prior to procurement and use.
2.3 LAND FOR CONTRACTOR’S FIELD, GODOWN AND WORKSHOP:
The tenderer should visit the site and acquaint himself with site conditions, availability of water, electricity, approach
roads, construction materials as per specifications, shelter for his staff, etc. since these are to be provided/arranged
by the tenderer (unless otherwise specified) at his cost.
The owner will, at his discretion and convenience based on availability for the duration of the execution of the work,
make available, land for construction of contractor’s field office, go-downs, workshop and fabrication yard required
for the execution of the contract. The contractor shall at his own cost construct all these temporary buildings and
provide suitable water supply and sanitary arrangement approved by the Engineer-in-Charge.
On completion of the works undertaken by the Contractor, he shall remove all temporary works/ shed erected by him
and have the site cleaned as directed by Engineer-in-Charge if the contractor shall fail to comply with these
requirements, the Engineer-in-charge may at the expenses of the Contractor remove such surplus and rubbish
material, dispose off the same as he deems fit and get the site cleared as aforesaid; and the contractor shall forthwith
pay the amount of all expenses so incurred and shall have no claim in respect of any such surplus materials disposed
off as aforesaid. But the Owner reserves the right to ask the Contractor any time during the pendency of the contract
to vacate the land by giving seven days notice on security reasons or on material interest otherwise.
2.4 SAFETY STANDARDS FOR TEMPORARY BUILDINGS
All temporary buildings, sheds, workshops, field stations etc. shall be constructed in conformation with the safety and
security regulations of the owner as regards location and type of structure.
GENERAL INSTRUCTION FOR THE TENDERER
3 SUBMISSION OF TENDER:
3.1 The quotation should be submitted only in the manner and the form prescribed in the Request For Quotation
(RFQ)/Tender enquiry.
3.2 Addenda/Corrigenda to this tender document if issued must be signed and submitted along with the tender document.
The tenderer should consider the Addenda/Corrigenda and should price the work based on revised quantities when
amendments for quantities are issued in addenda.
3.3 Tenders should always be placed in double sealed covers, superscribing Tender No Tender for
(name of job), Bharat Petroleum Corporation Limited, due for opening on
The full name, postal address and telegraphic address of the tenderer shall be written on the bottom left hand corner
of the sealed cover. (This will not be applicable in the case of e-tenders) Tenders received in open condition (priced
bid) are liable to be rejected.
3.4 Instructions for two part bidding
i) The bid should be submitted in two parts viz.
a. Techno-commercial bid.
ii) Techno-commercial bid shall have the following information/details
a. Technical deviation if any.
b. Commercial deviation if any like extra taxes, duties etc.
c. Copy of price bid with prices blanked off.
d. Any other relevant information.
iii) Price Bid shall have only prices as per schedule of Rates.
iv) Techno-commercial bid and price bid shall be enclosed in two separate envelopes with the subject job, type of
bid, bidders name super-scribed on top. Both these envelopes shall be sealed in a common envelope and submitted
as specified above and in covering letter. (This will not be applicable in the case of e-tenders)
4.1 The tenders, as submitted shall include all documents/details asked for by BPCL in the RFQ/Tender enquiry.
4.2 All pages to be initialed:
Wherever signed tender documents are submitted, all signatures in the documents shall be dated, as well as all the
pages of the documents shall be initialed at the lower right hand corner and signed wherever required in the tender
papers by the tenderer or by a person holding power of attorney authorizing him to sign on behalf of the tenderer
before submission of tender. Tenders without signatures as stated above are liable to be rejected.
4.3 Rates to be in Figures and Words:
The tenderer should quote the rates in English both in figures as well as in words. Offers received without the rates
in figures and in words are liable for rejection. In case of discrepancy exists between the rate quoted in figures and
in words, the rates quoted in words will prevail.
4.4 Corrections and Erasures:
All corrections and alteration in the entries of tender papers will be signed in full by the tenderer with date. No
erasures or over-writings are permissible.
In case of priced bids containing overwriting/cuttings/erasures in the quoted rates and in case these are not
attested by the signatory of the bid, such priced bids are liable to be rejected without giving any further notice.
4.5 Signature of Tenderer:
The tender shall contain the name, residence and place of business of person or persons making the tender and shall
be signed by the tenderer with his usual signature with company stamp. Partnership firms shall furnish the full names
of all partners in the tender. It should be signed in the partnership name by all the partners or by duly authorized
representative followed by the name and designation of the person signing with company stamp.
Tender by Company or Corporation registered under the relevant companies act, shall be signed by the authorized
representative and a power of attorney in that behalf shall accompany the tender.Transfer of tender documents
issued to one intending tenderer to another is not permissible.
5 PURCHASE PREFERENCE:
Owner reserves its right to allow Public Sector Enterprises (Central/State), purchase preference as admissible/applicable
from time to time under the existing Govt. policy. Purchase preference to a PSE shall be decided based on the price
quoted by PSE as compared to L1 Vendor at the time of evaluation of the price bid.
Owner reserves its right to allow Micro and Small Enterprises (MSEs), MSEs owned by Women Entrepreneurs and
MSEs owned by Scheduled Caste (SC) or the Scheduled tribe (ST) entrepreneurs, purchase preference as
admissible/applicable from time to time under the existing Govt. policy. Purchase preference to a MSE, a MSE owned
by women entrepreneurs and a MSE owned by SC/ST entrepreneurs shall be decided based on the price quoted by
the said MSEs as compared to L1 Vendor at the time of evaluation of the price bid.
6 (a) EARNEST MONEY:
The tenderer must submit/ deposit earnest money, if specified in the RFQ/Tender enquiry, failing which the tender is
liable to be rejected. Earnest Money Deposit shall be submitted in the form of crossed Demand Draft in favour of “Bharat
Petroleum Corporation Ltd.” / Electronic Funds Transfer to BPCL Bank Account / Bank Guarantee executed by any
Scheduled Bank approved by Reserve Bank of India (as per Proforma provided in Annexure). Earnest Money Deposit
(EMD) shall be valid for a period of 6 (Six) months from the due date of opening of Techno-commercial Bids and shall
be submitted from any Indian Scheduled Commercial Bank / Indian Branch of Foreign Bank. EMD submitted by foreign
vendors shall be in USD / EURO only.
In case of limited tender, Earnest Money deposit (EMD) is not applicable for registered contractors of BPCL.
NOTE : Exemption of Bidding Document fee and EMD will be applicable for Micro and Small Enterprises (MSEs) registered
with District Industries Centres (DIC) or Khadi and Village Industries Commission or Khadi and Village Industries Board
or Coir Board or National Small Industries Corporation (NSIC) or Directorate of Handicraft and Handloom or MSEs having
Udyog Aadhaar Memorandum or any other body specified by Ministry of Micro, Small and Medium Enterprises. Such
bidder shall submit Self attested copy of the certificate, valid upto validity of the offer, indicating that their registration
includes the items/works under tender. The registration certificate should remain valid during the period of the contract
that may be entered into such successful bidder. Such tenderers should ensure validity of the Registration Certificate for
NOTE: No interest shall be paid by the Owner on the earnest money deposit by the tenderer. The earnest money of the
unsuccessful tenderer will be refunded after the completion of BQC evaluation / Technical Evaluation / Priced Bid
Evaluation as applicable.
(b) CONVERSION OF EMD TO SECURITY DEPOSIT:
The earnest money deposit (EMD) of the contractor whose tender may be accepted, if paid in forms other than Bank
Guarantee, can be converted to security deposit for due performance of the contract if the contractor so desires. The
“performance security deposit/retention money” vide clause 18 shall also be applicable limiting to a maximum of 10% of
the contract value.
7 (a) BID VALIDITY:
Tender submitted by tenderers shall remain valid for acceptance for a period of four months from the date of opening
of the tender (Technical Bid in the case of two bid). The tenderer shall not be entitled during the said period of four
months, without the consent in writing of the Owner, to revoke, or cancel his tender or vary the tender given or any
term thereof. In case of tenderer revoking or canceling his tender, varying any terms in regard thereof without the
consent of Owner in writing, appropriate penal action will be taken by BPCL as deemed fit including putting the
tenderer/contractor on ‘Holiday listing’/’Delisting’ barring the tenderer/contractor from participating in future tenders
for an appropriate period from the date of revocation/cancellation/varying the terms. Further in the case of contractors
who are not registered with BPCL, the earnest money deposited by him will be forfeited. Once the quotation is
accepted the rates quoted shall be firm till the entire work is completed.
(b) LANGUAGE OF BID:
The Bid, all correspondence and documents relating to the bid, between Bidder and BPCL, shall be written in English
language only. Any supporting document furnished by Bidder may be written in other language provided that this
literature is accompanied by an authenticated English translation in which case, for purpose of interpretation of the Bid,
the English translation shall govern.
8 ADDENDA / CORRIGENDA:
Addenda/ Corrigenda to the tender documents may be issued prior to the date of opening of the tenders to clarify
documents or to effect modification in the design or tender terms. All addenda/corrigenda issued shall become part
of tender Document.
9 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER:
9.1 The right to accept the tender will rest with the Owner. The Owner, however, does not bind itself to accept the lowest
tender, and reserves to itself the authority to reject any or all the tenders received without assigning any reason
9.2 The whole work may be split up between two or more contractors or accepted in part and not entirely if considered
9.3 Tenders in which any of the particulars and prescribed informations are missing or are incomplete in any respect
and/or the prescribed conditions are not fulfilled are liable to be rejected.
9.4 Canvassing in connection with tenders is strictly prohibited and tenders submitted by the tenderer who resort to
canvassing will be liable to rejection.
9.5 Tender containing uncalled remarks or any additional conditions are liable to be rejected.
10 (a) INTEGRITY PACT (IP):
Vendors are requested to sign & return our pre-signed IP document, if applicable. This document is essential &
binding. Vendor's failure to return the IP document duly signed along with Bid Document may result in the bid not
being considered for further evaluation.
(b) HOLIDAY LISTING:
The vendors / contractors are expected to adopt the ethics of highest standards and a very high degree of integrity,
safety and quality consciousness, commitment and sincerity towards the work undertaken and dealing with BPCL in
such matters. Also, while participating in the tender and performing the contracts, Contractors are required to meet
certain performance criteria and adherence to the terms and conditions of the tender / contract. BPCL shall have the
right to remove from the list of approved suppliers / contractors or to ban business dealings, if any agency has been
found to have committed misconduct or fraud or poor performance or anything unethical not expected
from a reputed agency. The guidelines and procedures for Holiday Listing as adopted by BPCL and available separately
in BPCL website shall be applicable in the context of all tenders floated and consequently, all Orders / Contracts /
Purchase Orders placed, by BPCL. It can be accessed using the following link:
http://bharatpetroleum.in/pdf/holidaylistingpolicyfinal.pdf.
(c) FOREIGN BIDDERS:
It is mandatory for the foreign bidder to furnish the documents for the compliance to requirement of PAN No. , Tax
Residency Certificate and Form No.10F (applicable for foreign bidder in case of services in India is required as per scope
of bidding document) as per Income Tax Act in case his receipts are subject to tax deduction at source in India:
PAN as per the Indian Income Tax requirements shall be submitted, failing which the Supplier/Contractor/Consultant
shall be responsible for any additional tax deduction at source as per the provisions of the Indian Income Tax Act/Rules
and the same shall be deducted from the payment made to supplier/contractor/consultant.
(ii) Tax Residency Certificate (TRC)
TRC containing prescribed particulars as per the Annexure from the Government of foreign country in order to claim
the benefits of DTAA as per the Indian Income Tax requirements shall be submitted, failing which the relief under DTAA
will not be available and consequently the actual rate of withholding tax will be applicable and deducted from the
payment made to supplier/contractor/consultant (i.e., non-resident taxpayer). The TRC shall be duly verified by the
Government of the country of which the assessee claims to be a resident for the purposes of tax.
In additional to TRC, in order to claim the benefits of DTAA, bidder shall also submit additional information in form no.
10F as per Annexure. Form 10F has to be signed & verified by the assessee himself.
The above shall be furnished before release of any payment or within one month of the release of Order, whichever is
earlier. In case of failure to submit the above information, any additional tax liability on Owner, will be deducted from
the payment due to the contractor.
11 COLLECTION OF DATA TENDERER’S RESPONSIBILITY & TIME SCHEDULE:
The tenderer shall visit the site and acquaint himself fully of the site and no claims whatsoever will be entertained on
the plea of ignorance or difficulties involved in execution of work or carriage of materials.
The time period allowed for carrying out the job shall be as shown in tender document. Request for revision for time
schedule after tenders are opened will not be received for consideration.
12 RETIRED GOVERNMENTS OR COMPANY OFFICER:
No Engineer of Gazetted rank or other Gazetted Officer, employed in Engineering or Administrative duties in an
Engineering Department of the States/Central Government or of the Owner is allowed to work as a Contractor for a
period of two years after his retirement from Government service or from the employment of the Owner without the
previous permission of the Owner. The contract, if awarded, is liable to be cancelled if either the contractor or any of
his employees is found at any time to be such a person, who had not obtained the permission of the State/ Central
Government, or of the Owner as aforesaid before submission of tender, or engagement in the Contractor’s service as
the case may be.
13 SIGNING OF THE CONTRACT:
The successful tenderer shall be required to execute an agreement in the proforma attached with tender enquiry
within a period of one month of the receipt by him of the notification of acceptance of tender. The payment will not
be processed till the time the agreement is executed.
14 (a) FIELD MANAGEMENT:
The field management will be the responsibility of the Engineer-in-Charge, who will be nominated by the Owner. The
Engineer-in-Charge may also authorize his representatives to perform his duties and functions.
Coordination of Work - The Engineer-in-Charge shall coordinate the work of various agencies engaged at site to
ensure minimum disruption of work carried out by different agencies. It shall be the responsibility of the contractor
to plan and execute strictly in accordance with the site instructions to avoid hindrance to the works being executed
by other agencies.
14 (b) CONSULTANCY CONTRACTS:
This General Conditions of Contract (GCC) will be binding for Consultancy jobs only to the extent of its applicability
to the context of consultancy jobs.
INTERPRETATION OF CONTRACT DOCUMENTS
15 INTERPRETATION OF CONTRACT DOCUMENT:
15.1 Except if and to the extent otherwise provided by the Contract, the provisions of the General Conditions of Contract
and special conditions shall prevail over those of any other documents forming part of the contract. Several documents
forming the contract are to be taken as mutually explanatory. Should there be any discrepancy, inconsistency, error
or omission in the contract or any of the matter may be referred to Engineer-in-Charge, who shall give his decisions
and issue to the Contractor instructions directing in what manner the work is to be carried out. The decision of the
Engineer-in-Charge shall be final and conclusive and the contractor shall carry out work in accordance with this
15.2 Works shown upon the drawing but not mentioned in the specifications or described in the specification without being
shown on the drawings shall nevertheless be held to be included in the same manner as if they had been specifically
shown upon the drawings and described in the specifications.
15.3 Headings and marginal notes to the clauses of these General Conditions of Contract or to specifications or to any
other tender document are solely for the purpose of giving a concise indication and not a summary of the content
thereof, and they shall never be deemed to be part thereof or be used in the interpretation or construction thereof
of the Contract.
16.4 Singular and Plural:
In these contract documents unless otherwise stated specifically, the singular shall include the plural and vice-versa
wherever the context so requires. Words indicating persons shall include relevant incorporated companies/ registered
as associations/ body of individual/ firm or partnership.
16 SPECIAL CONDITIONS OF CONTRACT:
16.1 Special Conditions of contract shall be read in conjunction with the General Conditions of Contracts, specification of
work, Drawings and any other documents forming part of this contract wherever the context so requires.
16.2 Notwithstanding the sub-division of the documents into these separate sections and volumes every part of each shall
be deemed to be supplementary to and complementary of every other part and shall be read with and into the
contract so far as it may be practicable to do so.
16.3 Where any portion of the General Conditions of Contract is repugnant to or at variance with any provisions of the
Special Conditions of Contract then, unless a different intention appears the provisions of the Special Conditions of
Contract shall be deemed to over-ride the provision of the General Conditions of Contract and shall to the extent of
such repugnance or variations, prevail.
16.4 Wherever it is mentioned in the specifications that the Contractor shall perform certain work or provide certain
facilities, it is understood that the contractor shall do so at his own cost.
16.5 The materials, designs and workmanship shall satisfy the relevant Indian Standards, the Job specifications contained
herein and codes referred to. Where the job specifications stipulate requirements in addition to those contained in
the standard codes and specifications, these additional requirements shall also be satisfied.
17 CONTRACTOR TO OBTAIN HIS OWN INFORMATION:
The contractor in fixing rate shall for all purposes whatsoever be deemed to have him self independently obtained all
necessary information for the purpose of preparing his tender. The contractor shall be deemed to have examined
the Contract Documents, to have generally obtained his own information in all matters whatsoever that might affect
the carrying out the works at the scheduled rates and to have satisfied himself to the sufficiency to his tender. Any
error description of quantity or omission there from shall not vitiate the contract or release the Contractor from
executing the work comprised in the contract according to drawing and specifications at the scheduled rates. He is
deemed to have known the scope, nature and magnitude of the works and the requirements of materials and labour
involved etc. and as to what all works he has to complete in accordance with the contract documents whatever be
the defects, omissions or errors that may be found in the Contract Documents. The Contractor shall be deemed to
have visited surrounding to have satisfied himself to the nature of all existing structures, if any, and also as to the
nature and the conditions of the Railways, roads, bridges and culverts means of transport and communications,
whether by land, water or air, and as to possible interruptions thereto and the access to and regress from the site,
to have made enquiries, examined and satisfied himself as to the sites for obtaining sand, stones, bricks and other
materials, the sites for disposal of surplus materials the available accommodation as to whatever required, depots
and such other building as may be necessary for executing and completing the works, to have made local independent
enquiries as to the sub-soil water and variations thereof, storms, prevailing winds, climate conditions and all other
similar matters affecting these works. He is deemed to have acquainted himself as to his liability for payment of
Government taxes, customs duty and other charges.
Any neglect or failure on the part of the Contractor in obtaining necessary and reliable information upon the foregoing
or any other matters affecting the contract shall not relieve him from any risk or liabilities or the entire responsibility
from completion of the works at the scheduled rates and time in strict accordance with the contract documents.
No verbal agreement or inference from conversation with any officer or employee of the owner either before or after
the execution of the contract agreement shall in any way affect or modify any of the terms or obligations herein
18 PERFORMANCE SECURITY DEPOSIT/RETENTION MONEY:
18.1 To ensure performance of the contract and due discharge of the contractual obligations, the successful contractor
will have to provide security deposit of 10% of the basic value of contract unless otherwise specified in the Special
Conditions of Contract. Amount received/retained towards this clause will be considered as security deposit.
This Security deposit may be furnished in the form of an Account payee Demand Draft payable to BPCL or Bank
Guarantee in the prescribed format. The contractor shall have the option to adjust any Earnest Money Deposit- (EMD)
if paid by demand draft towards security deposit if he so desires or otherwise if submitted by way of bank guarantee
the validity of the same to be extended suitably as advised by BPCL.
In the case of security deposit submitted in the form of Bank guarantee, the Bank Guarantee shall be valid and remain
in force till the contractual completion period (expiry of the defect liability period- refer clause-74, if applicable) and
with a claim period of six months thereafter. The Bank Guarantee shall be in the form prescribed.
In case the successful contractor is not furnishing the performance security deposit as referred above on award of
the job, the same shall be deducted from each running account bills at the rate of 10% of bill value till overall security
deposit of 10% as mentioned above is collected.
The security deposit will be retained till the successful completion of the work and thereafter till the expiry of the
defect liability period (refer clause-74), if applicable. This retention money/Bank guarantee held shall be released
after the expiry of the defect liability period provided that any defects appearing during that period are corrected by
the contractor and subject to Clause 18.2 below.
In the case of value/rate/quantity contracts, the security deposit shall be based on individual release orders issued. In
case of LSTK (Lump Sum Turnkey Contracts) / EPC: PBG @ 10% within 15 days of notification of award. In case of
Annual Rate Contracts (ARCs): Submission of PBG @ 10% of Total Contract Value (TCV) or submission of initial security
deposit @ 2.5% of TCV within 15 days of notification of award. In cases where only 2.5% of TCV has been submitted,
7.5% of individual release order shall be subsequently deducted from RA bills.
Vendors/contractors shall be asked to submit the SD within 15 days from the date of notification of award and in the
event of delay in submission of SD, the contract can be terminated. However, if termination of contract is not in the
interest of the work/ BPCL, an additional time up to 30 days can be allowed for submission of SD depending on merits
of each case, beyond which the contract may be terminated with subsequent actions following termination as per
tender/procedure.
18.2 If the contractor/ sub-contractor or their employees shall break, deface or destroy any property belonging to the
Owner or other agency during the execution of the contract, the same shall be made good by the Contractor at his
own expenses and in default thereof, the Engineer-in-Charge may cause the same to be made good by other agencies
and recover expenses from the contractor (for which the certificate of the Engineer-in-Charge shall be final). These
expenses can be recovered from the security deposit/retention money if recovery from other sources is not possible.
18.3 All compensation or other sums of money payable by the contractor to the Owner under terms of this contract may
be deducted from his security deposit/retention money or from any sums which may be or may become due to the
contractor by the Owner on any account whatsoever and in the event of his security deposit/retention money being
reduced by reasons of any such deductions. The contractor shall within ten days thereafter make good any sum or
sums, which may have been deducted from his security Deposit/retention money. No interest shall be payable by the
Owner from sum deposited as security deposit/retention money.
18.4 The security deposit shall be held by the Owner, as security for the due performance of the Contractor’s obligations
under the contract, provided that nothing herein stated shall make it incumbent upon the Owner to utilize the security
deposit/retention money in preference to any other remedy which the Owner may have, nor shall be construed as
confining the claims of the Owner against the contractor to the quantum of the Security Deposit/retention money.
18.5 The Bank guarantee if submitted shall be from any Indian scheduled bank or an international bank of repute having
a branch in India or a corresponding banking relationship with an Indian scheduled bank. The security
deposit/retention money shall be in Indian Rupee in the case of domestic bidders and in US Dollars/EUROS in the
case of foreign bidders.
18.6 Process for submitting Bank Guarantee / PBG under SFMS (Structured Financial Messaging System) mode as follows:
Contractors shall insist their Bank on issuance of SFMS Bank Guarantee for faster payments. Contractors shall provide
BPCL's Bank Account No. & IFSC Code (Details given below) to their Bank as beneficiary at the time of application for
Bank Guarantee in favor of BPCL. Issuing Bank shall issue the Bank Guarantee & send SFMS message to BPCL's Bank
confirming the authenticity of Bank Guarantee who in turn shall send the confirmation to BPCL.
Name of Bank: State Bank of India
Branch :CAG Branch, Mumbai
IFSC Code: SBIN0009995
SFMS BG will help in faster verification of BGs and prompt release of payments to contractors.
19 TIME OF PERFORMANCE:
19.1 The work covered by this contract shall be commenced as detailed in the purchase order or as per the instructions
of the Engineer in charge and be completed in stages on or before the dates as mentioned in the time schedule of
completion of work. The contractor should bear in mind that time is the essence of this agreement unless such time
be extended pursuant to the provision of clause No. 21. Request for revision of Completion time after tenders are
opened will not receive consideration.
19.2 Time Schedule of Completion: The general time schedule of completion is given in the tender document. Contractor
should prepare a detailed monthly and weekly execution programme, jointly with the Engineer-in-Charge within two
weeks of receipt of Letter of Intent or acceptance of tender. The work shall be executed strictly as per the time
schedule given in this document. The period of completion given includes the time required for testing, rectifications,
if any, retesting and completion in all respects to the entire satisfaction of the Engineer-in-Charge.
20 FORCE MAJEURE
Circumstances leading to force majeure
(a) Act of terrorism;
(b) Riot, war, invasion, act of foreign enemies, hostilities (whether war be declared or not), civil war, rebellion, revolution,
insurrection of military or usurped power;
(c) Ionising radiation or contamination, radio activity from any nuclear fuel or from any nuclear waste from the
combustion of nuclear fuel, radioactive toxic explosive or other hazardous properties of any explosive assembly or nuclear
(d) epidemics, earthquakes, flood, fire, hurricanes, typhoons or other physical natural disaster, but excluding weather
conditions regardless of severity; and
(e) freight embargoes, strikes at national or state-wide level or industrial disputes at a national or state-wide level in any
country where Works are performed, and which affect an essential portion of the Works but excluding any industrial
dispute which is specific to the performance of the Works or the Contract.
For the avoidance of doubt, inclement weather, third party breach, delay in supply of materials (other than due to a
nationwide transporters’ strike) or commercial hardship shall not constitute a Force Majeure event.
• Notification of Force Majeure
Contractor shall notify within [10(ten)] days of becoming aware of or the date it ought to have become aware of the
occurrence of an event of Force Majeure giving full particulars of the event of Force Majeure and the reasons for the
event of Force Majeure preventing the Affected Party from, or delaying the Affected Party in performing its obligations
under the Contract.
• Right of either party to terminate
If an event of Force Majeure occurs and its effect continues for a period of 180 (one hundred eighty days) or more in a
continuous period of 365 (three hundred sixty five) days after notice has been given under this clause, either Party may
terminate the Contract by issuing a written notice of 30 (thirty) days to the other Party.
• Payment in case of termination due to Force Majeure
The Contract Price attributable to the Works performed as at the date of the commencement of the relevant event of
The Contractor has no entitlement and Owner has no liability for:
a) Any costs, losses, expenses, damages or the payment of any part of the Contract Price during an event of Force
b) Any delay costs in any way incurred by the Contractor due to an event of Force Majeure.
Time extension for such cases will be worked out appropriately.
21 EXTENSION OF TIME:
If the contractor shall desire an extension of the time for completion of the work on the grounds of his having been
unavoidably hindered in its execution or on any other grounds, he shall apply in writing to the Engineer-in-Charge
within two weeks of the date of hindrance on account of which he desires such extension as aforesaid, and the
Engineer-in-Charge shall if in his opinion (which shall be final), reasonable grounds have been shown thereof,
authorize such extension of time as may in his opinion be necessary or proper.
In the event of extension of Time of the contract, if granted, the contractor shall be required to suitably extend the
period of Bank Guarantee if submitted, towards security Deposit/retention money suitably.
22. LIQUIDATED DAMAGES FOR DELAY:
22.1 Time is the essence of the contract. In case the contractor fails to complete the whole work within the stipulated
period, he shall be liable to pay liquidated damages of 0.5% of the basic value of contract per week and or part
thereof of the delay subject to a maximum of 5% of the value of the contract. The parties agree that this is a genuine
pre- estimate of the loss/damage which will be suffered by the owner on account of delay on the part of the contractor
and the said amount will be payable on demand without there being any proof of the actual loss or damages having
been caused by such delay/breach. The owner shall be at liberty to adjust or deduct the said amount of liquidated
damages from any amount due to the contractor including Security Deposit. In case where the concluded contract
value is different from the original contract value due to the change orders/variation in executed quantities/extension
of time, etc., the concluded contract value should be considered for recovery of Liquidated Damages for late
delivery/delayed completion.
22.2 The owner shall be at liberty to deduct or retain from any amount payable to the contractor periodically, the
proportionate or full amount of liquidated damages as the case may be for the delay periodically caused by the
23 SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS REASONABLE
COMPENSATION WITHOUT REFERENCE TO ACTUAL LOSS:
All sums payable by way of compensation under any of the conditions shall be considered as reasonable compensation
without reference to the actual loss or damage, which shall have been sustained by the Owner.
24 TERMINATION/OFFLOADING:
24.1 The contractor fully understands that timely completion of the work as per the schedule is of paramount necessity as
otherwise it would lead to adversely affecting the schedules of other works/project with resultant financial and other
losses to the Company/owner. In view of this, the contractor unconditionally agrees and binds himself to be liable for
all the consequences for non-completion of the work within the stipulated time.
24.2 In case a situation is brought about by the contractor warranting termination/off-loading of the whole or any part of
the work for any reason whatsoever, the Company/owner shall have the liberty and right to entrust/engage/award
the work so terminated/off loaded at the risk and cost of the contractor to any other agency/contractor by adopting
any mode of inviting tenders, i.e. open/limited/single party/negotiation basis etc. in order to ensure completion of
the work as per the schedule or at the quickest possible time.
25. FORFEITURE OF SECURITY DEPOSIT:
Whenever any claim against the Contractor for the payment of a sum of money arises out of or under the contract,
the Owner shall be entitled to recover such sum by appropriating in part or whole, security deposit of the contractor,
forming whole or part of such security being insufficient or if no security has been taken from the Contractor then
the balance or the total sum recoverable, as the case may be, shall be deducted from any sum then due or which at
any time thereafter may become due to the Contractor. The contractor shall pay to the owner on demand any balance
26 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which, under any clause or clauses of this contract, the contractor shall have forfeited the whole of his
security deposit (whether paid in one sum or deducted by installment) or have committed a breach of any of the
terms contained in this contract, the owner shall have power to adopt any of the following courses as he may deem
best suited to his interest:
a) To rescind the contract (of which rescission notice in writing to the contractor under the hand of the owner
shall be conclusive evidence) in which case the security deposit of the contractor shall stand forfeited and
be absolutely at the disposal of the Owner.
b) To employ labour paid by the owner and to supply materials to carry out the work any part of the work,
debiting contractor with the labour cost of tools and plants and equipment charges, the cost of the materials
for which a certificate of the Engineer-in-Charge shall be final and conclusive against the Contractor and
10% of costs as above to cover all departmental charges and crediting him with the value of the work done
in all respects in the manner and at the same rates as if it had been carried out by the Contractor under
the term of his contract. The certificate of Engineer-in-Charge as to the value of the work done shall be
final and conclusive against the contractor.
c) To measure up the work of the contractor and to take such part thereof as shall be unexecuted out of his
hand to give it to another contractor to complete in which case any expenses which may be incurred in
excess of the sum which would have been paid to the original contractor, if the whole work had been
executed by him (of the amount of which excess, the certificate in writing of the Engineer-in-Charge shall
be final and conclusive) shall be borne and paid by the original contractor and may be deducted from any
money due to him by the Owner under the contract or otherwise or from his security deposit or from the
proceeds of sale thereof, of a sufficient part thereof.
In the event of any of the above course being adopted by the Owner, the contractor shall have no claim to
compensation for any loss sustained by him by reason of his having purchased or procured any materials
or entered into any agreements or made any advances on account of or with a view to the execution of
the work of the performance of the contract. In case the Contractor shall not be entitled to recover or be
paid any sum for any work actually performed under this contract unless the Engineer-in- Charge will certify
in writing the performance of such work and the value payable in respect thereof and he shall only be
entitled to be paid the value so certified.
27 CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF ACTION NOT TAKEN UNDER
In any case in which any of the powers conferred upon the owner by clause 26 thereof shall have become exercisable
and the same had not been exercised, the non exercise thereof shall not constitute a waiver of any of the conditions
hereof and such powers shall notwithstanding be exercised in the event of any further case of default by the contractor
for which any clause of hereof he is declared liable to pay compensation amounting to the whole of his security
deposit and the liability of the contractor for past and future compensation shall remain unaffected. In the event of
the Owner putting in force the power under sub-clause (a), (b) or (c) vested in him under the proceeding clause he
may, if he so desires takes possession of all or any tools and plants materials and stores in or upon the works or the
site thereof belonging to the contractor or procured by him and intended to be used for the execution of the work or
any part thereof paying or allowing for the same in account at the contract rates or in case of these not being
applicable at current market rates to be certified by the Engineer-in-Charge whose certificate thereof shall be final
otherwise the Engineer-in-Charge may give notice in writing to the contractor or his clerk of the works, supervisor or
other authorized agent, requiring him to remove such tools, plant, materials or stores from the premises (within a
time to be specified in such notice) and in the event of the contractor failing to comply with any such requisition, the
Engineer-in-Charge may remove them at the contractors expense or sell them by auction or private sale on account
of the contractor and at his risk in, all respects without any further notice as to the date, time or place of sale and
the certificate of the Engineer-in-Charge as to the expense of any such removal and the amount of proceeds and any
expenses of any such sale shall be final and conclusive against the contractor.
28 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK:
If at any time from the commencement of the work the owner shall for any reasons whatsoever, not require the
whole or part thereof as specified in the tender to be carried out, the Engineer-in-Charge shall give notice in writing
of the fact to the contractor, who shall have no claim to any payment or compensation whatsoever on account of any
profit or advantage which he might have derived from the execution of the work in full, but which he did not derive
in consequence of the full amount of the work not having been carried out, neither shall he have any claim for
compensation by reason of any alterations having been made in the original specifications, drawings, designs and
instructions which shall involve any curtailment of the work as originally contemplated.
29 CHANGES IN CONSTITUTION:
Where the contractor is a partnership firm, the prior approval, in writing, of the Owner shall be obtained before any
change is made in the constitution of the firm, where the contractor is an individual or a Hindu undivided family
business concern, such approval as aforesaid shall likewise be obtained before sub-contractor enters into any
agreement with other parties, where under the reconstituted firm would have the right to carryout the work hereby
undertaken by the contractor. In either case if prior approval as aforesaid is not obtained, the contract shall be
deemed to have been allotted in contravention of clauses 35 hereof and the same action may be taken and, the same
consequence shall ensure as provided in the said clause.
30 IF THE CONTRACTOR DIES:
Without prejudice to any of the rights or remedies under his contract, if the contractor dies, the Owner shall have
the option of terminating the contract without compensation to the contractor.
31 EMPLOYEES OF THE OWNER NOT INDIVIDUALLY LIABLE:
No director or official or employee of the Owner shall in any way be personally bound or liable for the acts or
obligations of the Owner under the contract or answerable for any default or omission in the observance or
performance of any of the acts, matters or things which are herein contained.
32 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS:
The contractor shall not be entitled to any increase on the item rates of the contract or any other right or claim
whatsoever by reason of representation, explanation or statement or alleged representation, promise or guarantees
given or alleged to have been given to him by any person.
33 CONTRACTOR’S OFFICE AT SITE:
The contractor shall provide and maintain an office at the site, if space provided by the owner, for the accommodation
of his agent and staff and such office shall be open at all reasonable hours to receive instruction, notices, or other
communications.
34 CONTRACTOR’S SUBORDINATE STAFF AND THEIR CONDUCTS:
34.1 The contractor, on or after award of the work shall name and depute a qualified personnel having sufficient
experience in carrying out work of similar nature to whom the equipments materials, if any, shall be issued
and instructions for works given. The contractor shall also provide to the satisfaction of the Engineer-in-
Charge sufficient and qualified staff to supervise the execution of the-works, competent sub-agents,
supervisor and leading hands including those specially qualified by previous experience to supervise the
type of works comprised in the contract in such manner as will ensure work of the best quality, expeditious
working. Whenever in the opinion of the Engineer-in-Charge, additional properly qualified supervision staff
is considered necessary, they shall be employed by the contractor without additional charges on account
thereof. The Contractor shall ensure to the satisfaction of the Engineer-in- Charge that sub-contractors, if
any shall provide competent and efficient supervision over the work entrusted to them.
34.2 If and whenever any of the Contractor’s or sub-contractor’s agents, sub-agents, assistants supervisor or
other employees shall in the opinion of Engineer-in-Charge be guilty of any misconduct or be incompetent
or insufficiently qualified or negligent in the performance of their duties or that in the opinion of the owner
or Engineer-in-Charge, it is undesirable for administrative or any other reason for such person or persons
to be employed in the works, the contractor, if so directed by the Engineer-in- Charge, shall at once remove
such person or persons from employment thereon. Any person or persons so removed from the works shall
not again be employed in connection with the works without the written permission of the Engineer-in-
Charge. Any person so removed from the works shall be immediately replaced at the expense of the
contractor by a qualified and competent substitute. Should the contractor be requested to repatriate any
person removed from the works he shall do so and shall bear all costs in connection herewith.
34.3 The contractor shall be responsible for the proper behaviour of all the staff, supervisor, workmen and others
and shall exercise a proper degree of control over them and in particular, and without prejudice to the said
generality, the contractor shall be bound to prohibit and prevent any employees from trespassing or acting
in any way detrimental or prejudicial to the interest of the community or of the properties or occupiers of
land and properties in the neighborhood and in the event of such employee so trespassing, the contractor
shall be responsible therefore and relieve the Owner of all consequent claims or actions for damages or
injury or any other grounds whatsoever. The decision of the Engineer-in-Charge upon any matter arising
under this clause shall be final. Contractor shall ensure that none of their employees are ever engaged in
any anti-national activities.
34.4 All contractor’s personnel entering upon the Owner’s premises shall be properly identified by badges issued
by owner which must be worn all times on Owner’s premises.
35 SUB-LETTING OF WORK:
Sub letting of contracts shall not be generally permitted. However owner may permit sub letting of work on specific
cases subject to the following:-
i) No part of the contract nor any share of interest there shall in any manner or degree be transferred assigned
sublet by the contractor directly or indirectly to any firm or corporation whosoever except as provided for in the
succeeding sub-clause, without the consent in writing of the Owner.
ii) Sub Contractors for Temporary Works Etc.:- The Owner may give written consent to sub-contract for execution
of any part of the works at the site, being entered into by the contractor provided each individual sub-contract
is submitted to the Engineer-in-Charge before being entered into and is approved by him.
iii) List of Sub-Contractors to be supplied: - At the commencement of every month the contractor shall furnish to
the Engineer-in-Charge list of all sub-contractors or firms engaged by the contractor and working at the site
during the previous month with particulars of the general nature of the sub-contract or works.
iv) Contractor’s Liability Not Limited By Sub-Contractors:- Notwithstanding any sub-letting with such approval as
aforesaid and notwithstanding that the Engineer-in-Charge shall have received copies of any sub-contracts, the
contractor shall be and shall remain solely responsible for the quality and proper and expeditious execution of
the works and the performance of all the conditions of the contract in all respects as if such sub-letting or sub-
contracting had not taken place and as if such work had been done directly by the Contractor.
v) Owner may Terminate Sub-Contracts:- If any sub-contractor engaged upon the works at the site executes any
work which in the opinion of the Engineer-in-Charge is not in accordance with the Contract documents, the
owner may by written notice to the contractor request him to terminate such sub-contract and the contractor
upon the receipt of such notice shall terminate such sub contract and the latter shall forthwith leave the works,
failing which the owner shall have right to remove such sub-contractors from the Site.
vi) No Remedy For Action Taken Under This Clause:- No action taken by the owner under the clause shall relieve
the contractor of any of his liabilities under the contract or give rise to any right to compensation, extension of
time or otherwise failing which, the owner shall have right to remove such sub-contractors from the Site.
36 POWER OF ENTRY:
If the contractor shall not commence the work in the manner previously described in the contract document or if he
shall, at any time in the opinion of the Engineer-in-Charge.
i. Fail to carryout the works in conformity with the contract documents, or
ii. Fail to carryout the works in accordance with the time schedule, or
iii. Substantially suspend work or the works for a period of Fourteen days without authority from the
Engineer-in-Charge, or
iv. Fail to carryout and execute the works to the satisfactions of the Engineer-in-Charge, or
v. Fail to supply sufficient or suitable constructional equipments, temporary works, labour materials or things,
vi. Commit or suffer or permit any other breach of any of the provisions of the contract on his part to be
performed or observed or persist in any of the above mentioned breaches of the contract for the fourteen
days, after notice in writing shall have been given to the Contractor by the Engineer-in-Charge requiring
such breach to be remedied, or
vii. Abandon the works, or
viii. During the continuance of the contract, become bankrupt, make any arrangement or composition with his
creditors, or permit any execution to be levied or go into liquidation whether compulsory or voluntary not
being merely a voluntary liquidation for the purpose of amalgamation or reconstruction.
Then in any such case, the Owner shall have the power to enter upon the works and take possession thereof and of
the materials, temporary works, constructional equipment, and stock thereon, and to revoke the contractor’s license
to use the same, and to complete the works, by his agents, other contractor or workmen, or to re-let the same upon
any terms and to such other person firm or corporation as the Owner in his absolute discretion may think proper to
employ and for the purpose aforesaid to use or authorize the use of any materials, temporary works constructional
equipment, and stock as aforesaid without making payment or allowances to the contractor for the said materials
other than such as may be certified in writing by the Engineer-in-Charge to be reasonable, and without making any
payment or allowance to the contractor for the use of the temporary said works, constructional equipments and stock
or being liable for any loss of damage thereto, and if the Owner shall by reason of his taking possession of the works
or of the works being completed by other contractors (due account being taken of any such extra work or works
which may be omitted) then the amount of such excess as certified by the Engineer-in- Charge shall be deducted
from any money which may be due for work done by the contractor under the contract and not paid for. Any deficiency
shall forthwith be made good and paid to the Owner by the contractor and the Owner shall have power to sell in such
manner and for such price as he may think fit all or any of the constructional equipment, materials etc. belonging to
and to recoup and retain the said deficiency or any part thereof out of the proceeds of the sale.
37 CONTRACTORS RESPONSIBILITY WITH OTHER AGENCIES:
Without repugnance to any other condition, it shall be the responsibility of the contractor executing the work of civil
construction, to work in close co-operation and co-ordinate the works with other contractors or their authorized
representatives and the contractor will put up a joint scheme, showing the arrangements, with other contractors /
agencies for carrying his portion of work to the Engineer-in-Charge, and get the approval. The contractor before
finally submitting the schemes to the Engineer-in-Charge shall have the written agreement of the other agencies. The
Engineer-in-Charge before communicating his approval of the scheme, with any required modifications shall get the
final agreement of all the agencies, which shall be binding. No claim shall be entertained on account of the above.
The contractor shall conform in all respects with the provisions of any statutory regulations, ordinances or by laws of
any local or duly constituted authorities or public bodies which may be applicable from time to time to the works or
any temporary works. The contractor shall keep the Owner Indemnified against all penalties and liabilities of every
kind arising out of non-adherence to such statutes ordinances, laws, rules, regulations, etc.
38 OTHER AGENTS AT SITE:
The contractor shall have to execute the work in such place and condition where other agencies might also be
engaged for other works such as site grading, filling and leveling, electrical and mechanical engineering works etc.
No claim shall be entertained to works being executed in the above circumstances.
Any notice hereunder may be served on the contractor or his duly authorized representative at the job site or may
be served by registered mail direct to the address furnished by the Contractor. Proof of issue of any such notice could
be conclusive of the contractor having been duly informed of all contents therein.
40 RIGHTS OF VARIOUS INTERESTS:
i) The Owner reserves the right to distribute the work between more than one contractor. The contractor shall co-
operate and afford other contractors reasonable opportunity for access to the works for the carriage and storage of
materials and execution of their works.
ii) Whenever the work being done by any department of the Owner or by other contractors employed by the Owner
is contingent upon work covered by the contract, the respective rights of the various interests involved shall be
determined by the Engineer-in-Charge to secure the completion of the various portions of the work in general
41 RIGHT OF OWNER TO DETERMINE / TERMINATE CONTRACT
i) Owner shall, at any time be entitled to determine and terminate the contract, if in the opinion of the Owner the
cessation of the work becomes necessary owing to paucity of funds or for any other cause whatsoever, in which case,
the cost of approved materials at the site at current market rates as verified and approved by Engineer-in- Charge
and of the value of the work done to date by the contractor shall be paid for in full at the rates specified in the
contract. A notice in writing from the Owner to the contractor of such determination and termination and the reason
thereof, shall be the conclusive proof of the fact that the contract has been so determined and terminated by the
ii) Should the contract be determined under sub-clause (i) of this clause and the contractor claims payments to
compensate expenditure incurred by him in the expectation of completing the whole of the work, the Owner shall
consider and admit such claim as are deemed fair and reasonable and are supported by vouchers to the satisfaction
of the Engineer-in-Charge. The Owner’s decision on the necessity and propriety of any such expenditure shall be final
and conclusive and binding on the contractor.
42 TERMINATION FOR CONVENIENCE :
BPCL shall, in addition to any other right enabling it to terminate the contract, have the right to terminate the contract
at any time by giving prior written notice of at least 14 days to the contractor. Such termination shall be without prejudice
to the rights of the parties that have accrued on or before the date of termination of the contract.
If the contract is terminated under this provision, the contractor is entitled to be compensated as under:-
a. the contract price attributable to the works performed as at the date of termination
b. the reasonable costs incurred by the contractor for termination of subcontractors or the repatriation of the
contractors’ and subcontractors’ employees
the aggregate of all previous payments allocated to the works.
Any sums due to BPCL from the contractor accruing prior to the date of termination will be deducted from the amount
to be paid to the contractor under the contract.
If, as a result of any such deductions, there is a negative amount payable to the contractor, then the contractor must
pay an amount equal to such negative sum to BPCL within 15 days of BPCL intimating the contractor.
43 PATENTS AND ROYALTIES:
43.1 The contractor, if licensed under any patent covering equipment, machinery, materials or compositions of matter to
be used or supplied or methods and process to be practiced or employed in the performance of this contract, agrees
to pay all royalties and licence fees which may be due with respect thereto. If any equipment, machinery, materials
or composition matters, to be used or supplied or methods and process to be practised or employed in the
performance of this contract, is covered by a patent under which contractor is not licensed then the contractor before
supplying or using the equipment, machinery, materials, compositions method or processes shall obtain such licences,
and pay such royalties and licence fees as may be necessary for performance of the contract. In the event, the
contractor fails to pay any such royalties or obtain any such licence, any suit for infringement of such patents which
is brought against the contractor or the Owner as a result of such failure will be defended by the contractor at his
own expenses and the contractor will pay any damages and costs awarded in such suit. The contractor shall promptly
notify the owner if the contractor has acquired knowledge of any patent under which a suit for infringement could be
reasonably brought because of the use by the Owner of any equipment, machinery, materials, and process methods
to be supplied hereunder. The contractor agrees to and does hereby grant to Owner, together with the right to extend
the same to any of the subsidiaries of the Owner as irrevocable, royalty- free licence to use in any country, any
invention made by the contractor or his employee in or as a result of the performance of the work under the contract.
The Owner shall indemnify and save harmless the contractor from any loss on account of claims on contractor for
the contributory infringement of patent rights arising out and based upon the claim that the use by the Owner of the
process included in the design prepared by the Owner and used in the operation of the plant infringes on any patent
right with respect to any sub-contract entered into by contractor pursuant to the provisions of sub-contractor
an undertaking to provide the Owner with the same patent protection that contractor is required to provide under
the provisions of this clause.
43.2 All drawings, blue prints, tracings, reproducible, models, plans, specification and copies thereof, furnished by the
Owner as well as drawings, tracings, reproducible, plans specifications, design, calculations etc. prepared by the
contractor for the purpose of execution of works covered in or connected with this contract shall be the property of
Owner and shall not be used for any other work but are to be delivered to the Owner at the completion of the
43.3 Where so desired by Engineer-in-Charge, the contractor agrees to respect the secrecy of any document, drawings
etc. issued to him for the execution of this contract, and restrict access to such documents, drawing etc. to the
minimum and further, the contractor agrees to execute an individual SECRECY agreement from each or any person
employed by contractor having access to such documents, drawings and to any other agency or individual, without
the written approval by Engineer-in-Charge.
44.1 If, at any time, there should be evidence or any lien or claim for which the Owner might have become liable and
which is chargeable to the contractor, the Owner shall have the right to retain out of any payment then due or
thereafter to become due an amount sufficient to completely indemnify the owner against such lien or claim and if
such lien or claim be valid the Owner may pay and discharge the same and deduct the amount so paid from any
money which may be or may become due and payable to the Contractor. If any lien or claim remain unsettled after
all payments are made, the contractor shall refund or pay to the Owner all moneys that the latter may be compelled
to pay in discharging such lien or claim including all costs and reasonable expenses.
44.2 Contractor will not disclose details of the work to any person or persons except those engaged in its performance,
and only to the extent required for the particular portion of the work being done.
Contractor will not give any items concerning details of the work to the press or a news disseminating agency without
prior written approval from Engineer-in-Charge. Contractor shall not take any pictures on site without written approval
of Engineer-in-Charge
45 OPERATION OF CONTRACT:
45.1 Law Governing:
Regardless of the place of contracting, place of performance or otherwise, this Agreement, and all amendments,
modifications, alterations, or supplements, thereto shall be governed by the laws of India and respective state laws
for the nature, validity and interpretation thereof.
45.2 Non-Waiver of Default:
Any failure by the Owner or Contractor at any time, or from time to time, to enforce or require the strict keeping and
performance of any of the terms or conditions of this agreement, or to exercise a right hereunder, shall not constitute
a waiver of such terms, conditions or rights, and shall not affect or impair same, or the right of the Owner or the
Contractor, as the case may be at any time to avail itself of same.
PERFORMANCE OF WORK
46 EXECUTION OF WORKS:
46.1 All the works shall be executed in strict conformity with the provisions of the contract documents and with such
explanatory detailed drawings, specifications, and instructions as may be furnished from time to time to the contractor
by the Engineer-in-Charge whether mentioned in the contract or not. The contractor shall be responsible for ensuring
that works throughout are executed in the most substantial, proper and workman like manner with the quality of
material and workmanship in strict accordance with the specifications following all safety requirements of BPCL and
as stipulated in work permits as per the directions and to the entire satisfaction of the Engineer-in- Charge.
46.2 Wherever it is mentioned in the specifications that the Contractor shall perform certain work or provide certain
facilities/materials, it is understood that the contractor shall do, so at his cost unless otherwise specified.
46.3 The materials, design and workmanship shall satisfy the relevant Indian Standards, the Job specification contained
herein and codes referred to. Where the job specification stipulate requirements in addition to those contained in the
standards codes and specifications, these additional requirements shall also be satisfied.
47 COORDINATION AND INSPECTION OF WORK:
The coordination and inspection of the day-to-day work under the contract shall be the responsibility of the Engineer-
in-Charge. The written instructions regarding any particular job will be normally be passed by the Engineer-in-Charge
or his authorized representative. A work order book / logbook will be maintained by the Contractor for each job in
which the aforesaid written instructions will be entered. These will be signed by the contractor or his authorized
representative by way of acknowledgment within 12 hours. The non maintaining of the order book or non signing by
the contractor shall not preclude the contractor from complying with the instructions.
48 WORK IN MONSOON AND DEWATERING:
48.1 The completion of the work may entail working in the monsoon also. The contractor must maintain a minimum labour
force as may be required for the job and plan and execute the construction and erection according to the prescribed
schedule. No extra rate will be considered for such work in monsoon.
48.2 During monsoon and other period, it shall be the responsibility of the contractor to keep the construction work site
free from water at his own cost.
49 WORK ON SUNDAYS AND HOLIDAYS:
For carrying out work on Sundays and Holidays if needed, the contractor will approach the Engineer-in-Charge or his
representative at least two days in advance and obtain permission in writing. No special compensation on this account
will be payable.
50 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION WORK:
50.1 Place of Work:
The work has to be executed at specified premises as per the tender. Contractor should apprise himself of all the
conditions prevailing in such location and the restrictions placed on movement of personnel and equipment, types of
equipment and tools permitted, working methods allowed etc. in the light of security and safety regulations operative
The safety regulations to be complied with, by the contractor will also be provided along with the tender. No idle time
wages or compensation for temporary stoppage of work or restrictions would be paid, and the rate quoted for the
various items of work should cover the cost of all such contingencies and eventualities. Substantial structures and
utilities exist both above ground and underground, adjacent to the work site. (The construction activity gets restrained
by the existence of such structures and utilities). Special care is necessary in transportation, storage, working on
equipments and other construction activities to protect the existing features and prevent damage to any facility.
Necessary protective structures barricades etc. have to be erected at various places as directed by Engineer-in-
Charge. No extra payment of such protective works will be made unless specially provided in the tender.
50.2 The working time or the time of work is 48 hours per week normally. Overtime work is permitted in cases of need
and the Owner will not compensate the same. Shift working at 2 or 3 shifts per day may become necessary and the
contractor should take this aspect into consideration for formulating his rates for quotation. No extra claims will be
entertained by the Owner on this account.
50.3 The contractor must arrange for the placement of workers in such a way that the delayed completing of the work or
any part thereof for any reasons whatsoever will not affect their proper employment. The Owner will not entertain
any claim for idle time payment whatsoever.
50.4 The contractor shall submit to the Owner reports at regular intervals regarding the state and progress of work. The
details and preforma of the report will mutually be agreed after the award of contract.
51 DRAWINGS TO BE SUPPLIED BY THE OWNER:
51.1 Where drawings are attached with tender, these shall be for the general guidance of the contractor to enable him to
visualize the type of work contemplated and scope of work involved. The contractor will be deemed to have studied
the drawings and formed an idea about the work involved.
51.2 Detailed working drawings on the basis of which actual execution of the work is to proceed will be furnished from
time to time during the progress of the work. The contractor shall be deemed to have gone through the drawings
supplied to him thoroughly and carefully and in conjunction with all other connected drawings and bring to the notice
of the Engineer-in-Charge, discrepancies, if any, therein before actually carrying out the work.
51.3 Copies of all detailed working drawings relating to the works shall be kept at the contractor’s office of the site and
shall be made available to the Engineer-in-Charge at any time during the contract. The drawings and other documents
issued by the Owner shall be returned to the Owner on completion of the works. Reference is also invited to clause
43.2 and 43.3 above regarding drawings and other documents.
52 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR:
52.1 Where drawings/data are to be furnished by the contractor, they shall be as enumerated in the special conditions of
contract, and shall be furnished within the specified time.
52.2 Where approval of drawings before manufacture / construction / fabrication has been specified, it shall be contractor’s
responsibility to have these drawings prepared as per the directions of Engineer-in-Charge and got approved before
proceeding with manufacture construction / fabrication, as the case may be. Any changes that may have become
necessary in these drawings during the execution of the work shall have to be carried out by the contractor to the
satisfaction of Engineer-in-Charge at no extra cost. All final drawings shall bear the certification stamps duly signed
by both the contractor and the Engineer-in-Charge.
52.3 A period of 3 weeks from the date of receipt shall be required normally for approval of drawings by the Engineer-in-
53 SETTING OUT WORKS:
53.1 The Engineer-in-Charge shall furnish the contractor with only the four corners of the work site and a level bench mark
and the contractor shall set out the works and shall provide efficient staff for the purpose and shall be solely
responsible for the accuracy of such setting out.
53.2 The contractor shall provide, fix and be responsible for the maintenance of all stacks, templates, level marks, profiles
and other similar things and shall take all necessary precaution to prevent their removal or disturbance and shall be
responsible for the consequence of such removal or disturbance should the same take place and for their efficient
and timely reinstatement. The contractor shall also be responsible for the maintenance of all existing survey marks,
boundary marks, distance marks and centre line marks, either existing or supplied and fixed by the contractor. The,
work shall be set out to the satisfaction of the Engineer-in-Charge. The approval thereof or joining in setting out the
work shall not relieve the contractor of any of his responsibilities.
53.3 Before beginning the works, the contractor shall at his own cost, provide all necessary reference and level posts,
pegs, bamboos, flags, ranging rods, strings and other materials for proper layout of the work in accordance with the
scheme, for bearing marks acceptable to the Engineer-in-Charge. The centre, longitudinal or face lines and cross lines
shall be marked by means of small masonry pillars. Each pillar shall have distinct marks at the centre to enable
theodolite to be set over it. No work shall be started until all these points are checked and approved by the Engineer-
in-Charge in writing but such approval shall not relieve the contractor of any of his responsibilities. The contractor
shall also provide all labour, material and other facilities, as necessary, for the proper checking of layout and inspection
of the points during construction.
53.4 Pillars bearing geodetic marks located at the site of work under construction should be protected and fenced by the
53.5 On completion of works, the contractor must submit the geodetic documents according to which the work was carried
54 RESPONSIBILITY FOR LEVEL AND ALIGNMENT:
The contractor shall be entirely and exclusively responsible for the horizontal and vertical alignment, the levels and
correctness of every part of the work and shall rectify effectually any errors or imperfections therein. Such
rectifications shall be carried out by the contractor, at his own cost, when instructions are issued to that effect by the
Engineer-in-Charge.
55 MATERIALS TO BE SUPPLIED BY CONTRACTOR:
55.1 The contractor shall procure and provide the whole of the materials required for construction including tools, tackles,
construction plant and equipment for the completion and maintenance of the works except the materials which will
be issued by Owner and shall make his own arrangement for procuring such materials and for the transport thereof.
The materials procured by the contractor shall be BPCL approved/specified quality.
55.2 All materials procured should meet the specifications given in the tender document. The Engineer-in-Charge may, at
his discretion, ask for samples and test certificates for any batch of any material procured. Before procuring, the
contractor should get the approval of Engineer-in-Charge for any material to be used for the works.
55.3 Manufacturer’s certificate shall be submitted for all materials supplied by the contractor. If, however, in the opinion
of the Engineer-in-Charge any tests are required to be conducted on the materials supplied by the contractor, these
will be arranged by the contractor promptly at his own cost.
56 MATERIALS SUPPLIED BY OWNER:
56.1 If the specifications of the work provides for the use of any materials of special description to be supplied from the
Owner’s stores, price for such material to be charged therefore as herein after mentioned being so far as practicable
for the convenience of the contractor but not so as in any way to control the meaning or effect of the contract. The
contractor shall be bound to purchase and shall be supplied such materials as are from time to time required to be
used by him for the purpose of the contract only. The sums due from the contractor for the value of the actual
materials supplied by the Owner will be recovered from the running account bill on the basis of the actual consumption
of materials in the work covered and for which the running account bill has been prepared. After the completion of
the works, however, the contractor has to account for the full quantity of materials supplied to him as per relevant
clauses in this document.
56.2 The value of the materials as may be supplied to the contractor by the Owner will be debited to the contractor’s
account at the rates shown in the schedule of chargeable materials and if they are not entered in the schedule, they
will be debited at cost price, which for the purpose of the contract shall include the cost of carriage and all other
expenses whatsoever such as normal storage supervision charges which shall have been incurred in obtaining the
same at the Owner’s stores. All materials so supplied to the contractor shall remain the absolute property of the
Owner and shall not be removed on any account from the site of the work, and shall be at all times open for
inspection to the Engineer-in-Charge. Any such materials remaining unused at the time of completion or termination
of the contract shall be returned to the Owner’s stores or at a place as directed by the Engineer-in- Charge in
perfectly good condition, at contractor’s cost.
57 CONDITIONS FOR ISSUE OF MATERIALS:
i) Materials specified to be issued by the Owner will be supplied to the contractor by the Owner from his
stores/location. It shall be the responsibility of the contractor to take delivery of the materials and arrange for its
loading, transport and unloading at the site of work at his own cost. The materials shall be issued between the
working hours and as per the rules of the Owner framed from time to time.
ii) The contractor shall bear all incidental charges for the storage and safe custody of materials at site after these
have been issued to him.
iii) Materials specified to be issued by the Owner shall be issued in standard sizes as obtained from the manufacturer.
iv) The contractor shall construct suitable godown at the site of work for storing the materials safe against damage
by rain, dampness, fire, theft etc. He shall also employ necessary watch and ward establishment for the purpose.
v) It shall be duty of the contractor to inspect the material supplied to him at the time of taking delivery and satisfy
himself that they are in good condition. After the materials have been delivered by the Owner, it shall be the
responsibility of the contractor to keep them in good condition and if the materials are damaged or lost, at any
time, they shall be repaired and/ or replaced by him at his own cost, according to the directions of the Engineer-
vi) The Owner shall not be liable for delay in supply or non-supply of any materials which the Owner has undertaken
to supply where such failure or delay is due to natural calamities, act of enemies, transport and procurement
difficulties and any circumstances beyond the control of the Owner. In no case, the contractor shall be entitled
to claim any compensation or loss suffered by him on this account.
vii) It shall be the responsibility of the contractor to arrange in time all materials required for the works other than
those to be supplied by the Owner. If, however, in the opinion of the Engineer-in-Charge the execution of the
work is likely to be delayed due to the contractor’s inability to make arrangements for supply of materials which
normally he has to arrange for, the Engineer-in-Charge shall have the right, at his own discretion, to Issue such
materials If available with the Owner or procure the materials from the market or elsewhere and the contractor
will be bound to take such materials at the rates decided by the Engineer-in-Charge. This, however, does not in
any way absolve the contractor from responsibility of making arrangements for the supply of such materials in
part or in full, should such a situation occur, nor shall this, constitute a reason for the delay in the execution of
viii) None of the materials supplied to the contractor will be utilized by the contractor for manufacturing item, which
can be obtained from standard manufacturer in finished form.
ix) The contractor shall, if desired by the Engineer-in-Charge, be required to execute an indemnity bond for safe
custody and accounting of all materials issued by the Owner.
x) The contractor shall furnish to the Engineer-in-Charge sufficiently in advance a statement showing his
requirements of the quantities of the materials to be supplied by the Owner and the time when the same will be
required by him for the works, so as to enable the Engineer-in-Charge to make necessary arrangement for
procurement and supply of the material.
xi) A daily account of the materials issued by the Owner shall be maintained by the contractor indicating the daily
receipt, consumption and balance in hand. This account shall be maintained in a manner prescribed by the
Engineer-in-Charge along with all connected papers viz. requisition, issues etc. and shall be always available for
inspection in the contractor’s office at site.
xii) The contractor should see that only the required quantities of materials are got issued. The contractor shall not
be entitled to cartage and incidental charges for returning the surplus materials, if any, to the stores/location
where from they were issued or to the place as directed by the Engineer-in-Charge.
xiii) Materials/ Equipment supplied by Owner shall not be utilized for any other purpose(s) than issued for.
58 MATERIALS PROCURED WITH ASSISTANCE OF OWNER:
Notwithstanding anything contained to the contrary in any or all the clause of this document where any materials for
the execution of the contract are procured with the assistance of Owner either by issue from Owner’s stock or
purchase made under orders or permits or licences issued by Government, the contractor shall hold the said materials
as trustee for the Owner and use such materials economically and solely for the purpose of the contract and not
dispose them off without the permission of the owner and return, if required by the Engineer-in-Charge, all surplus
or unserviceable materials that may be left with him after the completion of the contract or at its termination for any
reason, whatsoever on his being paid or credited such prices as the Engineer in-Charge shall determine having due
regard to the condition of the materials. The price allowed to the contractor however, shall not exceed the amount
charged to him excluding the storage charges if any. The decision of the Engineer-in- Charge shall be final and
conclusive in such matters. In the event of breach of the aforesaid condition, the contractor shall in terms of the
licenses or permits, and/or for criminal breach of trust, be liable to compensate the Owner a double rate or high rate,
in the event of those materials at that time having higher rate or not being available in the market, then any other
rate to be determined by the Engineer-in-Charge and his decision shall be final and conclusive.
59 MATERIALS OBTAINED FROM DISMANTLING:
If the contractor in the course of execution of the work is called upon to dismantle any part for reasons other than
those stipulated in clauses 66 & 70 hereunder, the materials obtained in the work of dismantling etc. will be considered
as the Owner’s property and will be disposed off to the best advantage of the Owner.
60 ARTICLES OF VALUE FOUND:
All gold, silver and other materials, of any description and all precious stones, coins, treasure relies, antiquities and
other similar things which shall be found in, under or upon the site, shall be property of the Owner and the contractor
shall duly preserve the same to the satisfaction of the Engineer-in-Charge and shall from time to time deliver the
same to such person or person indicated by the Owner.
61 DISCREPANCIES BETWEEN INSTRUCTIONS:
Should any discrepancy occur between the various instructions furnished to the contractor, his agents or staff or any
doubt, arise as to the meaning of any such instructions or should there be any misunderstanding between the
contractor’s staff and the Engineer-in-Charge’s staff, the contractor shall refer the matter immediately in writing to
the Engineer-in-Charge whose decision thereon shall be final and conclusive and no claim for losses alleged to have
been caused by such discrepancies between instructions, or doubts, or misunderstanding shall in any event be
62 ALTERATIONS IN SPECIFICATIONS AND DESIGNS AND EXTRA WORK:
A) The Engineer-in-Charge shall have power to make any alterations in, omissions from, additions to of substitutions
for, the schedule of rates, the original specifications, drawings, designs and instructions that may appear to him
to be necessary or advisable during the progress of the work and the contractor shall be bound to carry out such
altered / extra / new items of work in accordance with any instructions which may be given to him in writing signed
by the Engineer-in-Charge and such alterations, omissions, additions or substitutions shall not invalidate the
contract and any altered additional or substituted work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on the same conditions in all respect on
which he agree to do the main work. The time for completion of work may be extended for the part of the particular
job at the discretions of the Engineer-in-Charge, for only such alteration, additions or substitutions of the work, as
he may consider as just and reasonable. The rates for such additional, altered or substituted work under this
clause shall be worked out in accordance with the following provisions:
a) If the rates for the additional, altered or substituted work are specified in the contract for the work, the
contractor is bound to carry out the additional, altered or substituted work at the same rates as are specified in
b) If the rates for the additional, altered or substituted work are not specifically provided in the contract for the
work, the rates will be derived from the rates for similar class of works as specified in the contract for the work.
The opinion of the Engineer-in-Charge as to whether the rates can be reasonably so derived from items in the
contracts will be final and binding on the contractor.
c) If the rates for the altered, additional or substituted work cannot be determined in the manner specified in sub-
clause (a) and (b) above, then the contractor shall inform the Engineer-in-Charge of the rate which is his
intention to charge for such class of work supported by analysis of the rate or rates claimed, and the Engineer-
in-Charge shall determine the rates on the basis of the prevailing market rates of materials, labour cost at
schedule of labour plus 10% to cover contractor’s supervision, overheads and profit and pay the contractor
accordingly. The opinion of the Engineer-in-Charge as to the current market rates of materials and the quantum
of labour involved per unit of measurement will be final and binding on the contractor.
d) Provisions, contained in sub-clause (a) to (c) above shall not, however, apply:
Where the value of alterations / additions / deletions or substitutions exceeds beyond plus or minus 25% of the
estimated contract value (i.e. quoted item rates of contractor shall hold good for variations etc. within plus or
minus 25% of estimated contract value)
B) In the event and as a result of such alternatives / additions / substitutions / deletion, the scope of contract work
exceed the value stipulated in the contract by more than the limits given in clause (d) above, the Contractor shall
claim revision of the rates supported by the proper analysis in respect of such items for quantities in excess of the
above limits, notwithstanding the fact that the rates for such items exist in the tender for the main work or can be
derived in accordance with the provision of sub-clause (b) of Clause 62 A, and the Engineer-in-Charge may revise
their rates having regard to the prevailing market rates, and the contractor shall be paid in accordance with the
rates so fixed. But, under no circumstances the contractor shall suspend / stop / slowdown the work on the plea
of non-settlement of rates of items falling under this clause.
63 VARIATION IN CONTRACT VALUE :
Compensation for Reduction in Contract value due to change in quantity:
Upto & inclusive of (-) 25% of Total Contract Value (TCV): No cost compensation.
Beyond (-) 25% of TCV: Cost compensation @ 10% of reduction in the contract value from (-) 25% of TCV (i.e. 75% of
Discount to be obtained for Increase in contract value due to change in quantity:
Upto & inclusive of (+) 50% of TCV: No discount.
Beyond (+) 50% of TCV: Reduction @ 10% of increase in the contract value beyond (+) 50% of TCV.
64 ACTION WHERE NO SPECIFICATIONS ISSUED:
In case of any class of work for which there is no such specification given by the Owner in the tender documents,
such work shall be carried out in accordance with Indian Standard Specifications and if the Indian Standard
Specifications do not cover the same the work should be carried out as per standard Engineering Practice subject to
the approval of the Engineer-in-Charge.
65 ABNORMAL RATES:
The contractor is expected to quote rate for each item after analysis of cost involved for the completion of item/work,
considering all specifications and conditions of contract. This will avoid loss of profit or gain, in case of curtailment or
change of specification for any item. In case it is noticed that the rates for any item, quoted by the tenderer are
unusually high or unusually low, it will be sufficient cause for the rejection of the tender unless the Owner is convinced
about the reasonableness of the rates on scrutiny of the analysis for such rate to be furnished by the tenderer on
66 INSPECTION OF WORK:
66.1 The Engineer-in-Charge will have full power and authority to inspect the works at any time wherever in progress
either on the Site or at the contractor’s premises / workshop where situated premises /workshops of any person,
firm or corporation where work in connect with the contract may be in hand or where materials are being or are to
be supplied, and the contractor shall afford or procure for the Engineer-in-Charge every facility and assistance to
carry out such Inspection. The contractor shall at all time during the usual working hours and at all other time for
which reasonable notice of the intention of the Engineer in-Charge or his representative to visit the works have been
given to the contractor, either himself be present to receive order and instructions or post a responsible agent duly
accredited in writing for the purpose. Orders given to the contractor’s agent shall be considered to have the same
force as if they had been given to the contractor himself. The contractor shall give not less than seven days, notice
in writing to the Engineer-in-Charge before covering up or placing any work beyond reach of inspection and
measurement any work in order that the same may be inspected and measured. In the event of breach of above
the same shall be uncovered at contractor’s expense carrying out such measurement or inspection.
66.2 No materials shall be dispatched by the contractor before obtaining the approval of Engineer-in-Charge in writing.
The contractor is to provide at all times during the progress of the work and the maintenance period, proper means
of access with ladders, gangways, etc. and the necessary attendance to move and adopt as directed for inspection
or measurement of the works by the Engine in-Charge.
67 ASSISTANCE TO THE ENGINEERS:
The contractor shall make available to the Engineer-in-Charge, free of cost necessary instruments and assistance in
checking of setting out of works and taking measurement of work.
68 TESTS FOR QUALITY OF WORKS:
68.1 All workmanship shall be of the respective kinds described in the contract documents and in accordance with the
instructions of the Engineer-in-Charge and shall be subjected from time to time to such test at contractor’s cost as
the Engineer-in-Charge may direct at place of manufacture or fabrication or on the site or at all or any such places.
The contractor shall provide assistance, instruments, labour and materials as are normally required for examining,
measuring and testing any workmanship as may be selected and required the Engineer-in-Charge.
68.2 All the tests necessary in connection with the execution of the work as decided by Engineer-in-Charge shall be carried
out at the field testing laboratory of the Owner by paying the charges as decided by the Owner from time to time.
In case of non-availability of test facility with the Owner, the required test shall be carried out at the cost of contractor
at government or any other testing laboratory as directed by Engineer-in-Charge.
68.3 If any tests are required to be carried out in connection with the work or materials workmanship not supplied by the
contractor, such tests shall be carried out by the contractor as per the instructions of Engineer-in-Charge and cost
of such tests shall be reimbursed by the Owner.
The contractor shall furnish to the Engineer-in-Charge for approval when requested or if required by the specifications,
adequate samples of all materials and finishes to be used in the work. Such samples shall be submitted before the
work is commenced and in ample time to permit tests and examinations thereof. All materials furnished and finishing
applied in actual work shall be fully identical to the approval samples.
70 ACTION AND COMPENSATION IN CASE OF BAD WORK:
If it shall appear to the Engineer-in-Charge that any work has been executed with unsound, imperfect or unskilled
workmanship or with materials of any inferior description, or that any materials or articles provided by the contractor
for the execution of the work are unsound or of a quality inferior to that contracted for, or otherwise not in accordance
with the contract, the contractor shall on demand in writing from the Engineer-in-Charge or his authorised
representative, specifying the work, materials or articles complained of, notwithstanding that the same have been
inadvertently passed, certified and paid for forthwith shall rectify or remove and reconstruct the works specified and
provide other proper and suitable materials or articles at his own charge and cost, and in the event of failure to do
so within a period to be specified by the Engineer-in-Charge in his demand aforesaid, the contractor shall be liable to
pay compensation at the rate of one percentage of the estimated cost of the whole work, for every week limited to
a maximum of 10 per cent of the estimated cost of the whole work, while his failure to do so shall continue and in
the case of any such failure the Engineer-in-Charge may on expiry of notice period rectify or remove and re-execute
the work or remove and replace with others, the materials or articles complained of as the case may be at the risk
and expenses of the contractors in all respects. The decision of the Engineer-in-Charge as to any question arising
under this clause shall be final and conclusive.
71 SUSPENSION OF WORKS:
The contractor shall, if ordered in writing by the Engineer-in-Charge or his representative, temporarily suspend the
works or any part thereof for such period and such time as so ordered and shall not, after receiving such written
order, proceed with the work therein ordered to be suspended, until he shall have received a written order to proceed
therewith. The contractor shall not be entitled to claim/ compensation for any loss or damage sustained by him by
reason of temporary suspension of the works aforesaid. An extension of time for completion, corresponding with the
delay caused by any such suspension of the works as aforesaid will be granted to the contractor, should he apply for
the same, provided that suspension was not consequent to any default or failure on the part of the contractor.
72 OWNER MAY DO PART OF WORK:
Upon failure of the contractor to comply with any instructions given in accordance with the provisions of the contract,
the owner has the alternative right, instead of assuming charge for entire work to place additional labour force, tools,
equipments and materials on such parts of the work, as the owner may designate or also engage another contractor
to carry out the work. In such cases, the owner shall deduct from the amount which otherwise might become due to
the contractor, the cost of such work and materials with ten percent added to cover all departmental charges and
should the total amount thereof exceed the amount due to the contractor, the contractor shall pay the difference to
73 POSSESSION PRIOR TO COMPLETION:
The Engineer-in-Charge shall have the right to take possession of or use any completed or partially completed work
or part of the work. Such possessions or use shall not be deemed to be an acceptance of any work completed in
accordance with the contract agreement. If such prior possession or use by the Engineer-in-Charge delays the
progress of work, suitable adjustment in the time of completion will made and contract agreement shall be deemed
to be modified accordingly.
74 PERIOD OF LIABILITY FROM THE DATE OF COMPLETION OF WORK:
74.1 The contractor shall guarantee the installation/site work for a period of 12 (twelve) Months from the date of completion
of work, unless otherwise specified. Any damage that may lie undiscovered at the time of issue of completion
certificate, connected in any way with the equipment or materials supplied by him or in the workmanship shall be
rectified or replaced by the contractor at his own expense as deemed necessary by the Engineer-in-Charge or in
default, the Engineer-in-Charge may cause the same made good by other workmen and deduct expenses (for which
the certificate of Engineer-in-Charge shall be final) from any sums that may be then or at any time thereafter, become
due to the contractor or from his security deposit. In case the defect arises within the abovementioned Defect Liability
Period (DLP) and the same is repaired/replaced, the DLP for the repaired/replaced job/item will be extended suitably
so as to cover the original DLP. However, in no case, such extension will exceed 24 months from date of start of initial
74.2 If the contractor feels that any variation in work or in quality of materials or proportions would be beneficial or
necessary to fulfill the guarantee called for, he shall bring this to the notice of the Engineer-in-Charge in writing. The
work will not be considered as complete and taken over by the Owner until all the temporary works etc., constructed
by the contractor is removed and work site cleaned to the satisfaction of Engineer-in-Charge.
74.3 Care of Works:
From the commencement to completion of works, the contractor shall take full responsibility for the care of all works
including all temporary works, and in case any damage, loss or injury happens to the works or to any part thereof
or to any temporary work, from any cause whatsoever, he shall at own cost repair and make good the same, so that
at completion, the work shall be in good order and in conformity in every respect with the requirements of the
contract and the Engineer-in-Charge’s instructions.
74.4 Effects prior to taking over:
If at any time, before the work is taken over, the Engineer-in-Charge shall
a) Decide that any work done or materials used by the contractor or any sub-contractor is defective or not in
accordance with the contract or that the works or any portion thereof are defective or do not fulfill the
requirements of contract (all such matters being herein after called ‘Defects’ in this clause) and
b) As soon as reasonably practicable, notice given to the contractor in writing of the said decisions specifying
particulars of the defects alleged to exist or to have occurred, then the contractor shall at his own expenses and
with all speed make good the defects so specified.
In the case contractor shall fail to do so, the Owner may take, at the cost of the contractor, such steps as may in all
circumstances, be reasonable to make good such defects. The expenditure, so incurred by the Owner shall be
recovered from the amount due to the contractor. The decision of the Engineer-in-Charge with regard to the amount
be recovered from the contractor will be final and binding on the contractor. As soon as the works have been
completed in accordance with the contract (except in minor respects that do not affect their use for the purpose for
which they are intended and except for maintenance thereof provided in clause 74.1) and have passed the tests on
completion, the Engineer-in-Charge shall issue a certificate (hereinafter called completion certificate) in which he
shall certify the date on which the work have been so completed and have passed the said tests and the Owner shall
be deemed to have taken over the works on the date so certified. If the works have been divided into various groups
in the contract, the Owner shall be entitled to take over any group or groups before the other or others and thereupon
the Engineer-in-Charge shall issue a completion certificate which will however, be for such group or groups as taken
74.5 Defects after taking over:
In order that the contractor could obtain a completion certificate, he shall make good with all possible speed, any
defect arising from the defective materials supplied by the Contractor or workmanship or any act of omission of the
contract that may have been noticed or developed after the works or group of the works has been taken over. The
period allowed for carrying out such work will be normally one month. If any defect be not remedied within a
reasonable time, the Owner may proceed to do the work at the contractor’s risk and expense and deduct from the
final bill such amount as may be decided by the Owner. If by reason of any default on the part of the contractor a
completion certificate has not been issued in respect of every portion of the work within one month after the date
fixed by the contract for the completion of the works, the Owner shall be at his liberty to use the works or any portion
thereof in respect of which a completion certificate has been issued provided that the works or the portion thereof
so used as aforesaid shall be afforded reasonable opportunity for completing these works for the issue of completion
74.6 The Security Deposit/retention money deducted / furnished as per clause 18 of GCC shall be retained for the period
of liability as given in clause 74.1 above. This Retention amount or Bank Guarantee furnished against Security
Deposit/retention money shall be released only on expiry of the period of liability and also based on the certification
of the Engineer-in-charge that no defect/damage has been reported / observed during the stipulated period of liability
for the contract.
74.7 Performance of contractor shall be evaluated on each job by Engineer-in-Charge and recorded. Review of performance
will be carried out at appropriate intervals by BPCL.
BILLS / MEASUREMENT / PAYMENT
75 SCHEDULE OF RATES AND PAYMENTS:
i) Contractor’s Remuneration
The price to be paid by the Owner to contractor for the whole of the work to be done and the performance of all the
obligations undertaken by the contractor under the contract documents shall be ascertained by the application of the
respective item rates (the inclusive nature of which is more particularly defined by way of application but not of
limitation, with the succeeding sub-clause of this clause) and payment to be made accordingly for the work actually
executed and approved by the Engineer-in-Charge. The sum so ascertained shall (excepting only as and to the extent
expressly provided herein) constitute the sole and inclusive remuneration of the contractor under the contract and
no further payment whatsoever shall be or become due or payable to the contractor under the contract.
ii) Schedule of rates to be inclusive:
The prices/rates quoted by the contractor shall remain firm till the issue of final completion certificate and shall not
be subject to escalation. Schedule of rates shall be deemed to include and cover all costs, expense and liabilities of
every description and all risk of every kind to be taken in executing, completing and handing over the work to the
Owner by the Contractor. The Contractor shall be deemed to have known the nature, scope, magnitude and the
extent of the works and materials required, though the contract document may not fully and precisely furnish them.
He shall make such provision in the item rates as he may consider necessary to cover the cost of such items of work
and materials as may be reasonable and necessary to complete the works. The opinion of the Engineer-in- Charge
as to the items of work which are necessary and reasonable for completion of work shall be final and binding on the
contractor, although the same may not be shown on or described specially in contract documents.
Generality of this present provision shall not be deemed to cut down or limit in any way because in certain cases it
may and in other cases it may not be expressly stated that the contractor shall do or perform a work or supply articles
or perform services at his own cost or without addition of payment or without extra charges or words to the same
effect or that it may be stated or not stated that the same are included in and covered by the schedule of rates.
iii) Schedule of Rates to Cover Constructional Equipments, Materials, Labour etc.
Without in any way limiting the provisions of the preceding sub-clause the schedule of rates shall be deemed to
include and cover the cost of all constructional equipment, temporary work (except as provided for herein), pumps,
materials, labour, the insurance, fuel, stores and appliances to be supplied by the contractor and other matters in
connection with each item in the schedule of rates and the execution of the works or any portion thereof, finished,
complete in every respect and maintained as shown or described in the contract documents or may be ordered in
writing during the continuance of this contract.
iv) Schedule of Rates to cover Royalties, Rents and Claims:
The Schedule of Rates shall be deemed to include and cover the cost of all royalties and fees for the articles and
processes, protected by letters, or otherwise incorporated in or used in connection with the works, also all royalties,
rents and other payments in connection with obtaining materials of whatsoever kind for the works and shall include
an indemnity to the Owner which the contractor hereby gives against all actions, proceedings, claims damages, costs
and expenses arising from the incorporation in or use on the works of a such articles, processes or materials, Octroi
or other municipal or local Board charges levied on materials, equipment or machineries to be brought to site for use
on work shall be borne by the contractor.
v) Schedule of Rates to Cover Taxes and Duties:
No claim or exemption or reduction of customs duties, GST, quarry or any port dues, transport charges, stamp duties
or Central or States Government or Local Body or Municipal Taxes or duties, taxes or charges (from or of any other
body), whatsoever, will be granted or obtained, all of which expenses shall be deemed to be included in and covered
by the Schedule of Rates. Contractor shall also obtain and pay for all permits, or other privileges necessary to complete
vi) Schedule of Rates to cover Risk of Delay:
The schedule of Rates shall be deemed to include and cover the risk of all possibilities of delay and interference with
the contractors conduct of work which occur from any cause including orders of owner in the exercises of his powers
and on account of extension of time granted due to various reasons and for all other possible or probable cause of
vii) Schedule of Rates cannot be altered:
For work under unit rate basis, no alteration will be allowed in the schedule of Rates by reason of work or any part
of them being modified, altered, extended, diminished or omitted. The schedule of Rates are fully Inclusive rates
which have been fixed by the contractor and agreed to the Owner and cannot be altered.
For lumpsum contract, the payment will be made according to the work actually carried out for which purpose an
item wise or workwise, Schedule of rates shall be furnished, suitable for evaluating the value of work done and
preparing running account bills.
76 PROCEDURE FOR MEASUREMENT / BILLING OF WORK IN PROGRESS:
i) Measurements:
All measurements shall be in metric system. All the works in progress will be jointly measured by the representative
of the Engineer-in-Charge and the Contractor’s authorise agent progressively. Such measurement will be got recorded
in the measurement book by the Engineer-in-Charge or his authorised representative and signed in token of accepted
by the contractor or his authorised representative.
For the purpose of taking joint measurement the contractor’s representative shall be bound to be present whenever
required by the Engineer-in-Charge. If, however, he absents for any reason whatsoever the measurement will be
taken by the Engineer-in-Charge or his representative and this will be deemed to be correct and binding on the
The contractor will submit a bill to the Engineer-in-Charge of the work giving abstract and detailed measurements
for the various items executed during a month, before the expiry of the 1st week of the succeeding month. The
Engineer-in-Charge shall take or cause to be taken the requisite measurements for the purpose of having the same
verified and the claim, as far as admissible, adjusted, if possible, before the expiry of 10 days from presentation of
iii) Dispute in Mode of Measurements:
In case of any dispute as to the mode of measurement not covered by the contract to be adopted for any item of
work, mode of measurement as per latest Indian Standard Specifications shall be followed.
77 LUMPSUMS IN TENDER:
For the items in tender where it includes lumpsum in respect of parts of work, the contractor shall be entitled to
payment in respect of the items at the same rates as are payable under this contract for such items, or if part of the
work in question is not In the opinion of the Engineer-in-Charge capable of measurement of determination, the owner
may at his discretion pay the lumpsum amount entered In the tender or a percentage thereof and the certificate In
writing of the Engineer-in-Charge shall be final and conclusive against the contractor with regards to any sum or
sums payable to him under the provisions of the clause.
78 RUNNING ACCOUNT PAYMENTS TO BE REGARDED AS ADVANCES:
All running account payments shall be regarded as payment by way of advance against the final payment only and
not as payments for work actually done and completed and shall not preclude the requiring of bad, unsound and
imperfect, or unskilled work to be removed and taken away and reconstructed or re-erected or be considered as an
admission of the due performance of the contract, or any part thereof in this respect, or of the accruing of any claim
by the contractor, nor shall it conclude, determine or affect in any way the powers of the Owner under these conditions
or any of them as to the final settlement and the adjustments of the accounts or otherwise, or in any other way vary
or affect the contract.
The final bill shall be submitted by the contractor within one month of the date of physical completion of the work,
and settled immediately but not later than 60 days otherwise the Engineer-in charge’s certificate of the measurement
and of total amount payable for the work accordingly shall be final and binding on all parties. The final bill shall be
presented by the contractor along with ‘No claim certificate’ in a format acceptable to the owner or such other
documents as directed by the owner.
Should the contractor consider that he is entitled to any extra payment for extra job carried out whatsoever in respect
of the works, he shall forthwith give notice in writing to the Engineer-in-Charge that he claims extra payment for the
extra work. Such notice shall be given to the Engineer-in-Charge within one week from the ordering of any extra
work or happening of any event, upon which the contractor bases such claims, and such notice shall contain full
particulars of the nature of such claim with full details and amount claimed. Failure on part of the contractor to put
forward any claim with the necessary particulars as above within the time above specified shall be an absolute
waiver thereof. No omission by the owner to reject any such claim and no delay in dealing therewith shall be waiver
by the owner of any rights in respect thereof.
80 PAYMENT OF CONTRACTOR’S BILL:
Generally no payment shall be made for works estimated to cost less than Rs. 50,000/- till the whole of the work
shall have been completed. But in case of works estimate to cost more than Rs. 50,000/- the contractor on submitting
the bill thereof be entitled to receive a monthly payment proportion to the part thereof approved and passed by the
Engineer-in-Charge, whose certificate of such approval and passing of the sum so payable shall be final and conclusive
against the contractor. This payment will be made after making necessary deductions as stipulated elsewhere in the
contract document for materials, security deposit or any moneys due to the Owner etc.
75% payment of the Running Account bill (RA bill) shall be released within 15 calendar days of receipt of RA bill duly
certified by Engineer-in-charge (EIC) and the balance payment shall be released within 30 days of receipt of RA bill
by EIC after detailed scrutiny.
81 CONCLUSION OF CONTRACT:
In a situation where the L1 bidder is not lowest for some specific line items and the L1/L2 parity is likely to be
affected during the execution of the contract, due to variation in quantities of individual line items in contract based on
site conditions, then the final payment could be restricted to ensure that the overall total payment of the executed
work does not exceed the overall amount that would have been payable to the then L1 as per the latter’s quoted rates.
82 MODE OF PAYMENT:
Payment will be made to the contractor normally through NEFT mode.
83 COMPLETION CERTIFICATE:
83.1 Application for Completion Certificate:
When the contractor fulfills his obligation under clause 74.4, he shall be eligible to apply for completion certificate.
The contractor may apply for separate completion certificate respect of each such portion of the work by submitting
the completion documents along with such application for completion certificate.
The Engineer-in-Charge shall normally issue to the contractor the completion certificate within one month after
receiving an application therefore from the contractor after verifying from the completion documents and satisfying
himself that the work has been completed in accordance with and as set out in the construction and erection drawings
and the contract documents.
The contractor, after obtaining the completion certificate is eligible to present the final bill for the work executed by
him under the terms of contract.
83.2 Completion Certificate:
The contractor shall be furnished with a certificate by the Engineer-in-Charge of such completion, but no certificate
shall be given nor shall the work be deemed to have been executed until all scaffolding surplus materials and rubbish
is cleared off the site completely or until the work shall have been measured by the Engineer-in-Charge whose
measurement shall be binding and conclusive. The work will not be considered complete and taken over by the
Owner, until all the temporary works, labour and staff colonies etc. constructed are removed and the work site
cleaned of all debris etc., as described in clause in 83.3 below and to the satisfaction of the Engineer-in-Charge.
If the contractor shall fail to comply with the requirements of this clause on or before the date fixed for the completion
of the work, the Engineer-in-Charge may at the expenses of the contractor remove such scaffolding, surplus materials
and rubbish and dispose off the same as he thinks fit and clean off such dirt as aforesaid, and the contractor shall
forthwith pay the amount of all expenses so incurred and shall have no claim in respect of any such scaffolding or
surplus materials as aforesaid except for any sum actually realised by the sale thereof.
83.3 Clearing the site:
Cart away all debris generated from the work and dispose it off without giving rise to any complaints from local,
municipal or government authorities. Metal scraps or any other scrap including wooden packing materials shall be
disposed as instructed by the Engineer-in-Charge or as follows:
a) All unused scrap steel bar/ structural steel sections/pipe materials etc., (Free issue by owner) shall be the
property of the owner and the same shall be returned by the contractor category-wise at their own cost
to Owner’s store. The weighment slip issued by the Warehouse (in original) is required to be attached
along with the final bill/ material reconciliation statement. In case, the material is supplied by the
contractor, as per their scope of work, the scrap material generated out of the same should be taken out
at their own cost before the settlement of the final bill.
b) Insulation material (either issued by owner to the contractor or supplied by contractor) shall be kept in the
area allocated by owner. During the insulation activities, the contractor should keep the work area clean
on day-to-day basis. On completion of insulation job, all debris/packing should be taken out to the
designated location or as directed by the Engineer in charge for disposal at their own cost before the
settlement of the final bill.
83.4 The financial implication of above, if any, should be taken care of in the quoted rates; and no separate claim shall be
entertained on this account. The final bill of the contractor shall be linked with the area cleaning in all respects, including
removal of shuttering material, disposal of debris/scrap etc. to the entire satisfaction of Engineer-in- Charge.
84 FINAL DECISION AND FINAL CERTIFICATE:
Upon Expiry of the period of liability and subject to the Engineer-in-Charge being satisfied that the works have been
duly maintained by the contractor during monsoon or such period as herein before provided in clause 74 and that the
contractor has in all respect duly made up any subsidence and performed all his obligations under the contract, the
Engineer-in-Charge shall (without prejudice to the rights of the Owner to retain the provisions of relevant clause
hereof) give a certificate herein referred to as the final certificate to that effect. The contractor shall not be considered
to have fulfilled the whole of his obligations under the contract until Final Certificate have been given by the Engineer-
in-Charge notwithstanding any previous entry upon the work and taking possession, working or using of the same or
any part thereof by the owner.
85 CERTIFICATE FOR PAYMENTS AND EVIDENCE OF COMPLETION:
Except the final certificate, no other certificate or payments against a certificate or on general account shall be taken
to be an admission by the Owner of the due performance of the contract or any part thereof or occupancy or validity
of any claim by the contractor.
TAXES/DUTIES/INSURANCE
86 TAXES AND DUTIES :
The contractor agrees to and does hereby accept full and exclusive liability for the payment of any and all taxes,
duties, etc. now in force or hereafter Imposed, increased or modified, from time to time in respect of work and
materials and all contributions and taxes for unemployment compensation, insurance and old age pensions or
annuities now or hereafter imposed by any Central or State Government authorities which are imposed with respect
to or covered by the wages, salaries, or other compensations paid to the persons employed by the contractor and
the contractor shall be responsible for the compliance with all obligations and restrictions imposed by the Labour Law
or any other law affecting employer - employee relationship and the contractor further agrees to comply and secure
the compliance by all sub-contractors, with all applicable Central, State, Municipal and local laws and regulations and
requirements of any Central, State or Local Government agency or authority. Contractor further agrees to defend,
indemnify and hold harmless from any liability or penalty which may be Imposed by the Central, State of Local
Authority by reason of any violation by contractor or sub-contractor of such laws, regulations or requirements and
also from all claims, suits or proceeding that may be brought against the Owner arising under, growing out of, or by
reason of the work provided for by this contract by third parties, or by Central or State Government authority or any
administrative sub-division thereof.
The vendor shall take steps viz. mention relevant GSTIN of BPCL in GST invoices and returns, uploading invoice in GSTR
1, payment of the tax liability on the said invoices and filing of Returns etc. and comply with all the requirements of
applicable laws including GST laws for the time being in force to enable the OWNER to avail tax credit/s including input
tax credit. Any loss or non-availability of input tax credit by the OWNER due to non-compliance of applicable tax law
including but not limited to GST laws in force or otherwise, on the part of VENDOR, an amount equivalent to any tax
liability accruing to the OWNER and/or to the extent of any loss accrued to the OWNER due to the non-availability of
input tax credit or any liability accrued to the OWNER shall either stand cancelled or deducted from the payment due
to the VENDOR or shall be reimbursed by the VENDOR as the case may be till such default is either rectified or made
good by the VENDOR and the OWNER is satisfied that it is in a position to claim valid input tax credit within the timelines
as per applicable laws. Any cost, liability, dues, penalty, fees, interest as the case may be which accrues to the OWNER
at any point of time on account of non-compliance of applicable tax laws or rules or regulations thereof or otherwise
due to default on the part of VENDOR shall be borne by the VENDOR. An amount equivalent to such cost, liability, dues,
penalty, fees, and interest as the case may be shall be reimbursed by the VENDOR within 30 days. Any GST as may be
applicable on such recovery of amount shall also be borne by VENDOR and same shall be collected by the OWNER.”
Contractor shall at his own expenses carry and maintain insurance with reputable insurance companies to the
satisfaction of the Owner as follows:
i) Employees State Insurance Act:
The Contractor agrees to and does hereby accept full and exclusive liability for the compliance with all
obligations imposed by the Employees State Insurance Act, 1948, and the contractor further agrees to
defend, indemnify and hold Owner harmless from any liability or penalty which may be imposed by the
Central, State or Local Authority by reason of any asserted violation by contractor or sub-contractor, of the
Employee State Act, 1948 and also from all claims suits or proceedings that may be brought against the
Owner arising under, growing out of or by reason of the work provided for by this contract whether brought
by employees of the contractor, by third parties or by Central or State Government authority or any political
sub-division thereof.
The contractor agrees to filing, with the Employees State Insurance Corporation, the Declaration Forms
and all forms which may be required in respect of the contractor’s or sub-contractor’s employees whose
aggregate remuneration as fixed by the concerned authorities and who are employed in the work provided
for or those covered by ESI Act under any amendment to the Act from time to time. The contractor shall
deduct and secure the agreement of the sub-contractor to deduct the employee’s contribution as per the
first schedule of the Employee State Insurance Act from wages and affix the Employee’s contribution Cards
at Wages payment intervals. The contractor shall remit and secure the agreement of the sub-contractor to
remit to the authorized bank, Employee’s State Insurance Corporation Account, the Employee’s contribution
as required by the Act. The contractor agrees to maintain all Cards and records as required under the Act
in respect of employees and the payments and the contractor shall secure the agreement of the
subcontractor to maintain such records. Any expenses incurred for the contribution, making contribution or
maintaining records shall be to the contractor’s or sub-contractor’s account.
The Owner shall retain such sum as may necessary, from the total contract value until contractor shall
furnish satisfactory proof that all contributions as required by the Employees State Insurance Act,
have been paid.
ii) Workman’s Compensation and Employee’s Liability Insurance:
Insurance shall be effected for all the Contractor’s employees engaged in the performs of this contract, if
any of the work is sublet, the contractor shall require the sub-contractor to provide workman’s
compensation and employer’s liability Insurance for the latter’s employees if such employees are not
covered under the contractors insurance.
iii) Any other Insurance Required Under Law or Regulations or by Owner:
Owner shall cover Project Material and Equipments under and over all Marine-cum-Erection Insurance
Policy. Contractor shall carry and maintain any and all other insurance which be required under any law or
regulation from time to time. He shall also carry and main any other insurance which may be required by
iv) Automobile Liability Insurance:
Contractor shall take out an Automobile Liability Insurance to cover all risks to Owner for each of his vehicles
plying on works of this contract and these insurance shall be valid for the total contract period. No extra
payments will be made for this insurance. Owner shall not be liable for any damage or loss not made good
by the insurance company, should such damage or toss result from unauthorised use of the vehicle.
88 DAMAGE TO PROPERTY:
i) Contractor shall be responsible for making good, to the satisfaction of the Owner any loss of and any
damage to all structures and properties belonging to the Owner or being executed or procured or being
procured by the Owner or of other agencies within the premise all the work of the Owner, if such loss or
damage is due to fault and/or the negligence willful acts or omission of contractor, his employees, agents,
representative or \ sub-contractor.
ii) The contractor shall indemnify and keep the Owner harmless of all claims for damage to property other
than Owner’s property arising under or by reason of this agreement if such claims results from the fault
and/or negligence or willful acts or omission of contractor, his employees, agents, representatives or sub-
LABOUR LAWS AND OTHER REGULATIONS
89 LABOUR LAWS:
i) No labour below the age of eighteen years shall be employed on the work.
ii) The contractor shall not pay less than what is provided under the Minimum Wages Act for the applicable
trade or category of workman to the worker engaged by him on the work and also ensure that any sub-
contractors engaged by him also pay not below the applicable minimum wages under the Act and hold the
company, indemnified in respect of any claims that may arise in respect or non-compliance with this
iii) The contractor shall observe all the formalities required under the provisions of the contract labour
(Regulation and abolition) Act 1970 and the rules made thereunder and as may be amended from time to
time. He shall pay the required deposit under the Act Appropriate to the number of workmen to be employed
by him or through sub-contractor and get him self registered under the Act. He shall produce the certificate
of registration granted by the Govt. authority under the Act to the company before commencement of
work. The company recognises only the contractor and not his sub-contractors under the provisions of the
Act. The contractor will have to submit daily a list of his employees, who will be entering the Company’s
premises for the work awarded. He will also keep his wage register available at all times as close to the
work site as possible and produce the same for inspection whenever required by designated Company
officials. If the company so desires, a deposit may be taken from the Contractor to be refunded only after
the Company is satisfied that all the workmen employed by the contractor have been fully paid for the
period of work in Company’s premises at least at rates equal to or better than wages provided for under
the Minimum Wages Act.
iv) The Contractor will comply with the provisions of the employee’s Provident Fund Act and the Family Pension
Fund Act as may be applicable and as amended from time to time. Contractor shall obtain their own
provident fund account number. Offer of the contractor who does not have provident fund account will be
liable for rejection.
v) The Contractor will comply with the provisions of the Payment of Gratuity Act 1972 as may be applicable
and as amended from time to time.
90 IMPLEMENTATION OF APPRENTICES ACT 1961:
The Contractor shall comply with provisions of the Apprentices Act 1961 and the Rules/orders issued thereunder from
time to time. If he fails to do so, his failure will be breach of the contract and the Engineer-in-Charge may, at his
discretion, cancel the contract. The contractor shall also be liable for any pecuniary liability arising on account of any
violation by him of the provision of the act.
91 CONTRACTOR TO INDEMNIFY THE OWNER:
i) The contractor shall indemnity the owner and every member, officer and employee of the Owner, also the
Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs, and expenses
whatsoever arising out of or in connection with the matters referred to in clause 86 and all actions/
proceedings, claims, demands, costs and expenses which may be made against the Owner for or in respect
of or arising out of any failure by the contractor in the performance of his obligations under the contract
documents. The Owner shall not be liable for or in respect of any demand or compensation payable by law
in respect of or in consequence of any accident or injury to any workmen or other person in the employment
of the contractor or his sub-contractor and contractor shall indemnify and keep indemnified the Owner
against all such damages and compensations and against all claims, damage, proceedings, costs, charges
and expenses whatsoever, thereof or in relation thereto.
ii) Payment of Claims and Damages:
Should the Owner have to pay any money in respect of such claims or demands as aforesaid the amount
so paid and the costs incurred by the Owner shall be charged to and paid the Contractor and the contractor
shall not be at liberty to dispute or question the rig of the Owner to make such payments notwithstanding
the same may have been made without his consent or authority or in law or otherwise to the country.
In every case to which by virtue of the provisions of Section 12, sub-section (I) of workmen’s compensation
Act 1923 or other applicable provisions of workmen’s Compensation Act any other Act, the Owner is obliged
to pay compensation to a workmen employed by contractor in execution of the works, the Owner will
recover from the contractor the amount of compensation so paid and without prejudice to the rights of
Owner under Section 12 sub-section (2) of the said Act. Owner shall be at liberty to recover such amount
or any part thereof by deducting it from the security deposit or from any sum due to the contractor whether
under the contract or otherwise. The Owner shall not be bound to contest any clime made under Section
12, sub-section (I) of the said Act except on the written request of contractor and upon his giving to the
Owner full security for all costs for which the Owner might become liable on consequence of contesting
iii) Employment Liability:
a) The contractor shall be solely and exclusively responsible for engaging or employing persons for
the execution of work. All employees engaged by the contractor shall be on his/ their payroll and
paid by him/ them. All disputes or differences between the contractor and his/ their employees
shall be settled by him/ them. Owner has absolutely no liability whatsoever concerning the
employees of the contractor. The contractor shall indemnify owner against all loss or damage or
liability arising out of or in the course of his/ their employees. The contractor shall make regular
and full payment of wages without giving any complaint by any employee of the contractor or
his sub-contractor regarding non-payment of wages/ salaries or other dues. Owner reserves the
right to make such payments directly, to such employee or sub-contractor of the contractor and
recover the amount in full from the bills of Contractor, and the contractor shall not claim any
compensation or reimbursement thereof. The Contractor shall comply with the Minimum Wages
Act applicable to the area with regard to payment of wages of his employees and also of
employees of his sub-contractor.
b) The Contractor shall advise in writing to all of his employees and the employees of his sub-
contractor as follows:
It is fully understood that your appointment and/ or deployment is only in connection with the
owner and it does not give you any right of claim for employment by owner.
92 (a) HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS:
In respect of all labour directly employed in the works for performance of the contractor’s par this agreement, the
contractor shall comply with or cause to be complied with all the rules and regulations of the local sanitary and other
authorities or as framed by the Owner from time to time for the protection of health and sanitary arrangements for
(b) MEDICAL FITNESS CERTIFICATION :
Contractor shall follow guidelines for medical fitness certification of workers employed for working at height more
than 30 metres using temporary structures.
93 SAFETY REGULATIONS:
i) In respect of all labour, directly or indirectly employed In the work for the performance of contractor’s part
of this agreement, the contractor shall at his own expenses arrange for all safety provisions as per safety
codes of C.P.W.D. Indian Standard Institution, the Electricity Act, The Mines Act and any such other acts
ii) The Contractor shall ensure that he, his sub-contractor and his, or their personnel or representatives shall
comply with all Fire / Safety regulations issued from time to time by the Company or otherwise howsoever
and should any injury resulting in death or not or loss / or damage due to Fire to any property or a portion
thereof, occurred as a result of failure to comply with such regulations, the contractor shall be held
responsible for the consequences thereof and shall keep the company harmless and indemnified.
94 ARBITRATION:
Any dispute or difference whatsoever arising out of or in connection with this Agreement including any question
regarding its existence, validity, construction, interpretation, application, meaning, scope, operation or effect of this
contract or termination thereof shall be referred to and finally resolved through arbitration as per the procedure
mentioned herein below :
(a) The dispute or difference shall, in any event, be referred only to a Sole Arbitrator
(b) The appointment and arbitration proceedings shall be conducted in accordance with SCOPE forum of Arbitration
Rules for the time being in force or as amended from time to time
(c) The Seat of arbitration shall be at _____________(Region/HQ from where the tender has been floated)
(d) The proceedings shall be conducted in English language
(e) The cost of the proceedings shall be equally borne by the parties, unless otherwise directed by the Sole
In the event of any dispute or difference relating to the interpretation and application of the provisions of commercial
contract(s) between the Central Public Sector Enterprises (CPSEs)/Port Trusts inter se and also between CPSEs and
Government Departments/Organizations (excluding disputes concerning Railways, Income Tax, Customs & Excise
Departments*), such dispute or difference shall be taken up by either party for its resolution through AMRCD as
mentioned in DPE OM no.4(1)/2013-DPE(GM)/FTS-1835 dated 22-05-2018.
(* The exclusion would also include disputes concerning GST, State level Sales Tax / VAT etc; though not mentioned
95 JURISDICTION:
The contractor shall be governed by the Laws in force in INDIA. The contractor hereby submits to the jurisdiction of
the Courts situated at Mumbai/(Ernakulam-in the case of Kochi Refinery), for the purpose of actions and proceedings
arising out of the contract and the courts at Mumbai/(Ernakulam-in the case of Kochi Refinery), only will have
jurisdiction to hear and decide such actions and proceedings.
96 ORDER OF PRECEDENCE FOR WORKS / SERVICES CONTRACTS:
1. Contract Agreement (in GCC)
2. Detailed letter of Acceptance along with its enclosures
3. Letter of Award / Fax of Acceptance
4. Job Specifications (specific to particular job only)
6. Special Conditions of Contract (SCC)
7. Technical Specifications
8. Instructions to Bidders
9. General Conditions of Contract (GCC)
10. Other Documents
Additionally, any variation or amendment / change order issued after signing of formal contract shall take precedence
over respective clauses of the formal contract and its Annexures.
97 LIMITATION OF LIABILITY
The aggregate total liability of the Contractor to Owner under the Contract shall not exceed the total Contract Price,
except that this Clause shall not limit the liability of the Contractor for following:
(a) In the event of breach of any Applicable Law;
(b) In the event of fraud, willful misconduct or illegal or unlawful acts, or gross negligence of the Contractor or any
person acting on behalf of the Contractor; or
(c) In the event of acts or omissions of the Contractor which are contrary to the most elementary rules of diligence
which a conscientious Contractor would have followed in similar circumstances; or
(d) In the event of any claim or loss or damage arising out of infringement of Intellectual Property; or
(e) For any damage to any third party, including death or injury of any third party caused by the Contractor or any
person or firm acting on behalf of the Contractor in executing the Works. Neither Party shall be liable to the other
Party for any kind of indirect or consequential loss or damage like, loss of use, loss of profit, loss of
production or business interruption which is connected with any claim arising under the Contract.
98 POLICE VERIFICATION OF CONTRACT STAFF AND TRANSPORT CREW AT LOCATION:
The Contract staff should submit the following documents for enabling them to enter the location:
i) Police verification certificate issued by the police (PVC)
ii) Photocopy of Aadhaar Card (Original to be cross checked)
iii) Assurance certificate from the Vendor / Contractor /transporter
The contractor shall not at any time do, cause or permit any nuisance on site or do anything which shall cause
unnecessary disturbance or inconvenience to Corporation, tenants or occupiers of other properties near the site and to
the general public.
100 BUILDING AND OTHER CONSTRUCTION WORKERS CESS:
i) Bidders to note that under Building and other Construction Workers Welfare Act (Re&CS) Act 1996, Cess is applicable
to contracts executed outside Factory Area (e.g. construction of new industrial installation, office &
residential buildings etc.) as per the provisions applicable under ‘The Building and Other Construction Workers
Welfare Cess Act 1996’.
ii) The contractor must be registered with the concerned authorities under the Building and other Construction Workers‟
(RE&CS) Act, 1996 or in case of non-registration; the contractor should obtain registration within one month of the
award of contract.
iii) The contractor shall be responsible to comply with all provisions of the Building and Other Construction
Workers‟ (RE&CS) Act, 1996, the Building and other Construction Workers‟ Welfare Cess Act, 1996, the Building
and other Construction Workers‟ (RE&CS) Rules, 1998 and the Building and other Construction Workers Welfare
iv) Cess, as per the prevailing rate (presently 1%), shall be deducted at source from bills of the contactors by the
Engineer-in-Charge and remitted to the “Secretary, Building and other Construction Workers Welfare Board” of the
concerned State.
v) The contactor shall be responsible to submit final assessment return of the Cess amount to the assessing officer
after adjusting the Cess deducted at source.
MEMORANDUM OF AGREEMENT
An agreement made this day of 20 between BHARAT PETROLEUM
CORPORATION LIMITED a Company Incorporated in India and having its registered office at Ballard Estate,
Mumbai, (herein after referred to as ‘the Company’ which expression shall include its heirs, legal representatives,
successors and permitted assignees) of the one part, and
(herein after referred to as “The Contractor” which expression shall include its heirs, legal representatives,
successors and permitted assignees) of the other part, whereby it is agreed:-
1. The Contractor shall carry out and complete the work as mentioned in the Purchase order/Contract No.
dated , (hereinafter referred to as “the work”) for the Company at its specified site to its
complete satisfaction in accordance with the specifications, schedule of rates and plans attached as per Purchase
order/Contract and with the instructions given from time to time, by the Company’s authorized engineer under
whose supervision the work shall be-executed. The parties hereto agree that this agreement shall be effective
from the date of the aforesaid Purchase Order/Contract.
2. Inspection of site: The Contractor has been given an opportunity before or at the time of the entrusting of the
work to him of making an inspection of the site to set at rest any doubt he may have had about the difficulties
attending his offer, and any difficulties which may be met with by him in the course of the execution of the work
shall neither relieve him from fulfilling the terms of this Agreement, nor entitled him to claim extra payment or
an extension of the period stipulated for the completion of the work, except where it will be agreed by the
Company’s authorized Engineer that such difficulties could not have been foreseen.
3. Supply of Labour and Materials: The Contractor shall furnish all labour, materials, equipment or tools
necessary for the construction of the work, except such materials, equipment or tools as will be supplied by the
Company and are detailed in Purchase order/Contract. The contractor will assume full responsibility for the
protection and safety of the work during its construction. The details and dimensions shown on the said plans
referred to in the Purchase order/Contract shall be strictly adhered to by the contractor and no alterations shall
be made therein unless previous sanction thereto has been given in writing by the Company.
(a) The Contractor shall prepare detailed and shop drawings and any other data required.
(b) All materials supplied by the Contractor shall be of the best quality. The Contractor shall at his own cost
arrange for and/or carry out any test of materials, which the Company’s authorized Engineer may
(c) The Contractor shall at the request of the Company’s authorized Engineer immediately dismiss from the
work any person employed thereon who, in the opinion of the Company’s authorized Engineer, is
unsuitable or incompetent or who, has been guilty of misconduct, and such person shall not again be
employed or allowed on the works without the permission of the Company, in writing.
4. E. & O. E. No advantage is to be taken either by the Company or the Contractor of any clerical error or mistake,
which may occur in the specification, schedule of rates, plans, tender or any other papers supplied to or by the
contractor in connection with the work.
5. Damage on account of Incomplete work: The Contractor shall commence the work and shall complete the
work as mentioned in Purchase order/Contract failing which the Contractor shall pay or allow to the Company to
recover as liquidated damages, at the rate of minimum 0.5% per week of delay or part there of up to a maximum
of 5% of the total contract value, if Liquidated damages clause is made applicable in the contract. Such damages
may be deducted by the Company from any amount due to the contractor; otherwise they shall be recoverable
by lawful means.
6. a) Determination of the Agreement: The company shall, at any time, be entitled to determine and terminate
the contract, if in the opinion of the company, the cessation of the work becomes necessary owing to paucity of
funds or for any other cause whatsoever. On such determination / termination, the cost of approved materials,
brought by the contractor and lying at the site, at current market rates as verified and approved by company’s
engineer and of the value of the work done to date by the contractor shall be paid for in full at the rate specified
in the contract. A notice in writing from the company to the contractor of such determination and termination
and reasons therefore shall be the conclusive proof of the fact that the contract has been so determined and
terminated by the company.
Should the contract be determined as above and the contractor claims payment to compensate expenditure
incurred by him in the expectation of completing the work, the company shall consider and admit such claim as
are deemed fair and reasonable and are supported by the vouchers to satisfaction of the engineer-in-charge. The
company’s decision on the necessity and propriety of such expenditure shall be final and conclusive and binding
on the contractor.
The contractor shall not be entitled to get any possible loss of profit that he could have earned had the contract
been not determined / terminated under the above clauses of this article.
b) Termination/Offloading: The contractor fully understands that timely completion of the work as per the
schedule is of paramount necessity as otherwise it would lead to adversely affecting the schedules of other
works/project with resultant financial and other losses to the Company. In view of this, the contractor
unconditionally agrees and binds himself to be liable for all the consequences for non-completion of the work
within the stipulated time.
In case a situation is brought about by the contractor warranting termination/off-loading of the whole or any part
of the work for any reason whatsoever, the Company shall have the liberty and right to entrust/engage/award
the work so terminated off loaded at the risk and cost of the contractor to any other agency/contractor by adopting
any mode of inviting tenders, i.e. open/limited/single party/negotiation basis etc. in order to ensure completion
of the work as per the schedule or at the quickest possible time.
7. Defective Work / Materials: If the work done by the Contractor or any part there of shall be found defective
in workmanship or by reason of bad or inferior materials used, then in such case he shall at his own risk and cost
without delay, demolish all such defective work and rebuild or replace the same in a satisfactory manner. The
Company may, if necessary, at the cost and risk of the Contractor, temporarily stop all other activities by the
Contractor in connection with the work until such time as the defective work has been rebuilt or replaced at the
Contractor’s cost. In case of default on the part of the contractor to remove defectives work and rebuild or replace
the same without delay and in a manner satisfactory to the Company, the Company shall be entitled to employ
another Contractor or its own workman to carry out the removal and rebuilding or replacing at the risk and cost
of the contractor.
8. Substitution of Contractor : If the Company finds it necessary to employ a person or persons for the purposes
provided in clauses 6 (b) and 7 above, then the Company may deduct and retain from out of the sums due to
the contractor all such amounts as they may require to pay or to reimburse themselves there from in respect of
the costs and expenses which they have incurred in completing the work and or in removing defective work and
rebuilding or replacing the same in a manner satisfactory to the Company and if such amounts be more than the
sums due or thereafter becoming due to the Contractor, than the balance, shall be a debt recoverable from the
Contractor by the Company. The Contractor shall not in any manner do or cause to be done any act, matter or
things whatsoever to prevent the person or persons so employed by the Company from removing defective work
and re-building or replacing the same in a manner satisfactory to the Company and/or from, completing the work
in the manner aforesaid.
9. Removal of Material: On the Determination of the Agreement as referred to in Clause 6, the Contractor shall
at his own risk and cost remove from site within Seven days all his materials, equipment and tools. It is agreed
that in case of such determination the company shall be entitled to purchase from the Contractor such materials
as will be approved by the Authorized Engineer of the Company at the prices then current. If the Contractor does
not remove the other materials, equipment and tools which he has been asked to remove within the time
prescribed as aforesaid, the Company may remove and sell the same holding the proceeds less the cost of
storage, removal and sale to the credit of the Contractor. Should Company incur any loss in respect of the sale,
it shall be entitled to recover same from the Contractor.
10. Inspection of work: Inspection will be made periodically during the progress of the work by the authorized
Engineer of the Company and all work performed must be of acceptable quality of which the said Engineer-in-
Charge will be the sole judge.
11. Supervision: The Contractor shall during the whole time the work is in progress, employ one or more competent
and technical English speaking Supervisors acceptable to the Company’s authorized Engineer, one of whom at
least shall be in constant attendance at the site while persons are at work there. Any directions, explanations,
instructions, or notices in connection with the work given by the Company’s authorized Engineer to these
Supervisors shall be deemed to have been given to the Contractor.
12. Payment: The Company, in consideration of the contractor carrying out and completing the said work at the
Company’s said site, to the satisfaction of the Company, shall pay the contractor as per the said schedule of
Rates, subject to deductions, retentions and abatements, if any to be made therefrom in accordance with the
provisions of this Agreement. During the progress of the work and provided the work is progressing according to
the time-table laid down to the contractor, the contractor shall be entitled once a month to receive advance
payment on the above mentioned sum proportionate to such part of the work as shall have been executed during
the preceding month but only after such part of the work as has been executed has been inspected and approved
by the Company’s authorized Engineer. From such interim payments each time 10% will be withheld as Security
deposit and this 10% will be paid to the Contractor after the defect liability period, provided that any defects
appearing during that period are corrected by him. OR
100% payment will be made on the basis of actual executed quantities after satisfactory completion and due
certification by BPCL Engineer-in-charge. In lieu of 10% Retention money towards Security deposit, contractor
shall submit bank guarantee of equivalent amount of retention money (10% of contract value) before submission
of 1st Running Account (RA) bill valid for defects liability period specified. Further, the Bank Guarantee shall have
a claim period of six months beyond the date of expiry, and the same shall be mentioned clearly in the Bank
13. Defects after Completion: Any defects which may appear within the defect liability period specified shall, upon
the directions in writing of the Company and within such reasonable time as shall be specified therein be amended
and made good by the Contractor, at his own cost unless the Company shall decide that the Contractor will be
paid for such amending and making good, and in case of default on the Contractor’s part, the Company may
amend and make good or have amended and made good such defects and all damages, losses and expenses
consequent thereon, incidental to those shall be borne by the Contractor and such damages, losses and expenses
shall be recoverable from him by the Company or may be deducted by the Company from any moneys due to or
thereafter becoming due to the Contractor. Alternatively, the Company may, in lieu of such amending and making
good by the Contractor elect to deduct from any moneys due or thereafter becoming due to the Contractor a
sum to be determined by the Company sufficient to cover the cost of amending and making good such defects,
and in the event of the amount withheld in accordance with Clause 12 being insufficient, recover the balance
from the Contractor together with any expenses the Company may have incurred in connection with such
recovery. Should any defective work have been done or bad inferior materials supplied by any Sub-Contractor
employed on the work, has been approved by the Company as provided in Clause 15, the Contractor shall be
liable to amend and make good in the same manner as if such work or materials had been done or supplied by
the Contractor. The Contractor shall remain liable under this Clause notwithstanding the signing by the Company’s
authorized Engineer of any certificate or the passing of any account.
14. Alterations: The Company reserves the right at any time to alter any quantities of any item indicated in the
Purchase order/Contract, in which case the total amount payable to the Contractor shall be less or higher,
proportionate with the reduction or increase in quantity of such item, allowance for which will be made at the
Contractor’s agreed rates.
15. Subletting Agreement: The Contractor shall not sublet or assign the work or any part thereof to another party
without the written consent of the company and no such subletting or assignment shall relieve the contractor from
the full and entire responsibility of his obligation under this Agreement.
16. Cancellation: The Company shall at any and all times during the period stipulated for the work, has the right
forthwith to cancel this agreement by giving written notice thereof to the Contractor and in such case the
Contractor shall be paid for such part of the work as has been executed by him up to the date of cancellation, on
the basis of schedule of rates as per Purchase order/Contract and shall be reimbursed by the Company for the
cost and expenses incurred by him but which would now be wasted as a direct consequence of the cancellation
of the Agreement.
17. Workmen’s Compensation Liability: The Contractor shall hold the Company harmless and indemnified from
and against all claims, costs and charges for which the Company shall be liable under the Workmen’s
Compensation Act, 1923 and any amendments thereof and the expenses to which it shall be put thereunder, both
in respect of personal injuries (within the meaning of the said Act) to the employees and servants of the Contractor
or Sub-Contractors, (if any), arising out of, or occasioned during the currency of this agreement through the acts
or omissions, whether due to negligence or not of the Contractor, Sub-Contractor and/or Company and/or their
respective servants and employees and also in respect of the personal injuries (within the meaning of the said
Act) to the servants and employees of the Company arising out of, or occasioned through the acts and omissions
whether due to negligence or not of the Contractor, Sub-Contractor and or their servants and employees in
carrying out any of the provisions of this Agreement. This indemnity shall be in addition to and not in lieu of any
indemnity to which the Company shall be entitled in law. The Contractor shall at his own expense effect and
maintain, until the completion of the work, with an approved office a Policy of Insurance in the joint names of
the Company and the Contractor, against such risks and deposit such Policy or policies with the Company from
time to time during the currency of this Agreement. The Contractor shall be responsible for anything not included
in the Insurance Policies above referred to and also for all other damage to person or property arising out of or
incidental to the negligent or defective carrying out of this agreement and shall keep the Company harmless and
indemnified. He shall also indemnify the Company in respect of any costs, charges or expenses arising out of any
claim or proceedings and also in respect of any award of compensation or damages arising therefrom. The
Company shall be entitled to deduct the amount of any damages compensation costs, charges and expenses
arising or accruing from or in respect of any such claim or damages from any sum or sums due or thereafter
becoming due to the Contractor.
18. Safety Regulation: The Contractor shall ensure that he/his Sub-Contractor and his, or their personnel or
representatives shall comply with all safety regulations issued from time to time by the Company or otherwise
howsoever and should any injury resulting in death or not or damage to any property occur as result of failure to
comply with such regulations the Contractor shall be held responsible for the consequences thereof, shall keep
the Company harmless and indemnified.
19. ARBITRATION: Any dispute or difference whatsoever arising out of or in connection with this Agreement
including any question regarding its existence, validity, construction, interpretation, application, meaning, scope,
operation or effect of this contract or termination thereof shall be referred to and finally resolved through
arbitration as per the procedure mentioned herein below :
(a) The dispute or difference shall, in any event, be referred only to a Sole Arbitrator
(b) The appointment and arbitration proceedings shall be conducted in accordance with SCOPE forum of
Arbitration Rules for the time being in force or as amended from time to time
(c) The Seat of arbitration shall be at _______ (Region/HQ from where the tender has been floated)
(d) The proceedings shall be conducted in English language
(e) The cost of the proceedings shall be equally borne by the parties, unless otherwise directed by the Sole
In the event of any dispute or difference relating to the interpretation and application of the provisions of
commercial contract(s) between the Central Public Sector Enterprises (CPSEs)/Port Trusts inter se and also
between CPSEs and Government Departments/Organizations (excluding disputes concerning Railways, Income
Tax, Customs & Excise Departments*), such dispute or difference shall be taken up by either party for its
resolution through AMRCD as mentioned in DPE OM no.4(1)/2013-DPE(GM)/FTS-1835 dated 22-05-2018.
(* The exclusion would also include disputes concerning GST, State level Sales Tax / VAT etc; though not
mentioned explicitly)
20. Jurisdiction:
The contractor shall be governed by the Laws in force in INDIA. The contractor hereby submits to the jurisdiction
of the Courts situated at Mumbai/(Ernakulam-in the case of Kochi Refinery), for the purpose of actions and
proceedings arising out of the contract and the courts at Mumbai/(Ernakulam-in the case of Kochi Refinery), only
will have jurisdiction to hear and decide such actions and proceedings.
21 Minimum Wages:
The Contractor, his executors and administrators (and in the case of a Limited Company, its successors and
assigns) shall hold the Company harmless and indemnified from and against all claims, costs and charges, for
which the Company shall be liable under the Minimum Wages Act, 1948, the Contract Labour (Regulation and
Abolition) Act, 1970 and any amendments or modifications thereof, and all expenses it shall be put thereunder
through the acts or omissions whether willful or not on the part of the Contractor. This indemnity shall be in
addition to and not in lieu of, any indemnity to which the Company shall be entitled in law.
22. Employees State Insurance: This Contractor hereby admits that he is fully aware of his responsibilities under
the Employees State Insurance Act, 1948, as an immediate employer of the employees engaged by him for the
execution of this contract which he agrees to discharge. The Contractor acknowledge the statutory right of the
company (as a Principle Employer) to recover the amount of the contributions, paid by it in the first instance in
respect of the employees employed by or through him (the Contractor), as well as the employee’s contribution,
if any, either by deduction from any amount payable to him by the Company under any contract or as debt
payable by him to the Company.
In witness where of the said contracting parties have set their hands.
For Bharat Petroleum Corporation Ltd. For Bharat Petroleum Corporation Ltd.
Contractor’s witness - Signature Contractor’s Signature
Name & Address:- Name & Address:-
PROFORMA OF BANK GUARANTEE
(On non-judicial paper of appropriate value)
FOR EARNEST MONEY / SECURITY DEPOSIT TOWARDS PERFORMANCE
Bharat Petroleum Corporation Ltd.
M/s. have taken tender for the work CRFQ No/PO
for Bharat Petroleum Corporation Ltd.
The tender Conditions of Contract provide that the Contractor shall pay a sum of Rs.
(Rupees ) as earnest money/security deposit in the form therein mentioned. The form
of payment of earnest money/security deposit includes guarantee executed by Scheduled Bank, undertaking full responsibility to indemnify
Bharat Petroleum Corporation Ltd. in case of default.
The said have approached us and at their request and in consideration of the premises
we having our office at have agreed to
give such guarantee as hereinafter mentioned.
1. We hereby undertake and agree with you that
if default shall be made by M/s. in performing any of the terms and
conditions of the tender or in payment of any money payable to Bharat Petroleum Corporation Ltd. We shall on demand pay to
you in such matter as to you may direct the said amount of Rupees only or such portion
thereof not exceeding the said sum as you may from time to time require.
2. You will have the full liberty without reference to us and without effecting this guarantee postpones for any time or from time to
time the exercise of any of the powers and rights conferred on you under the contract with the said and to
enforce or to for bear from endorsing any power of rights or by reason of time being given to the said which under law relating
to the sureties would but for provision have the effect of releasing us.
3. Your right to recover the said sum of Rs. (Rupees ) from us
in manner aforesaid will not be affected or suspended by reason of the fact that any dispute or disputes have been raised by the
said M/s. and/or that any dispute or disputes are pending before any officer,
tribunal or court.
4. The guarantee herein contained shall not be determined or affected by the liquidation or winding up, dissolution or change of
constitution or insolvency of the said but shall in all respects and for all purposes be
binding operative units payment of all money due to you in respect of such liabilities is paid.
5. Our liability under this guarantee is restricted to Rupees Our guarantees shall remain
in force until unless a suit or action to enforce a claim
under Guarantee is filed against us within six months from
(which is date of expiry of guarantee) all our rights under the said guarantee shall be
forfeited and shall be relieved and discharged from all liabilities thereunder.
6. We have power to issue this guarantee in your favour under Memorandum and Articles of Association and the undersigned has
full power to do under the Power of Attorney dated granted to him by the Bank.
Yours faithfully
Bank by its Constituted Attorney Signature of a person duly authorized to sign on behalf of the
TAX RESIDENCY CERTIFICATE
TRC obtained by the Non-resident from Government of foreign country shall contain the following particulars:
i. Name of the assessee
ii. Status (individual, company, firm, etc.) of the assessee
iii. Nationality (in case of individual)
iv. Country or specified territory of incorporation or registration (in case of others)
v. Assessee’s tax identification number in the country or specified territory of residence or in case of no such number, then, a
unique number on the basis of which the person is identified by the Government of the country or the specified territory
vi. Residential status for the purpose of Tax
vii. Period for which the certificate is applicable
viii. Address of the applicant for the period for which the certificate is applicable
[See sub-rule (1) of rule 21AB of the Income-tax Act, 1961]
Information to be provided under sub-section (5) of section 90 or sub-section (5) of section 90A of the Income-tax Act,
1. I_________________*son/daughter of Shri _____________ in the capacity of ___________________(designation)do provide the
following information, relevant to the previous year _________,*in my case/in the case of __________for the purposes of sub-section
(5) of *section 90/section 90A:-
Sl. No. Nature of information Details #
(i) Status (individual, company, firm etc.) of the assessee :
(ii) Permanent Account Number (PAN) of the assessee if allotted : :
(iii) Nationality (in the case of an individual) :
Country or specified territory of incorporation or registration (in the case
(iv) Assessee’s tax identification number in the country or specified territory :
of residence and if there is no such number, then, a unique number on
the basis of which the person is identified by the Government of the
country or the specified territory of which the assessee claims to be a
(v) Period for which the residential status as mentioned in the certificate :
referred to in sub-section (4) of section 90 or sub-section (4 )of section
90A is applicable
(vi) Address of the assessee in the country or territory outside India during :
the period for which the certificate, mentioned in (v) above, is applicable
2. I have obtained a certificate referred to in sub-section (4) of section 90 or sub-section (4) of section 90A from the Government of
_________________________(name of country or specified territory outside India).
Permanent Account Number :___________________
I_________________do hereby declare that to the best of my knowledge and belief what is stated above is correct, complete and is
Verified today the ___________day of _________________
Signature of the person providing the information
1. * Delete whichever is not applicable.
2. #Write N.A. if the relevant information forms part of the certificate referred to in sub-section (4) of section 90 or sub-section (4) of
BHARAT PETROLEUM CORPORATION LTD
ACKNOWLEDGEMENT
We, M/s. having office at received
the copy of GENERAL CONDITIONS OF CONTRACT and confirm our acceptance to all the terms and conditions as mentioned herein
in this General Conditions of Contract and we are hereby returning this copy of Acknowledgement duly signed.
For & on behalf of M/s.
( Seal / Stamp )
GENERAL PURCHASE CONDITIONS
BHARAT GAS RESOURCES LIMITED
CITY GAS DISTRIBUTION PROJECT FOR AHMEDNAGAR
& AURANGABAD GA AND SANGLI & SATARA GA
SUPPLY OF MOTOR DRIVEN VARIABLE SUCTION
COMPRESSOR FOR CITY GAS DISTRIBUTION
PROJECT FOR AHMEDNAGAR & AURANGABAD GA
AND SANGLI & SATARA GA
GENERAL PURCHASE CONDITIONS (GPC)
THE GPC DATED 22.01.2020 OF
BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
SHALL BE ALSO REFERRED TO FOR
BHARAT GAS RESOURCES LIMITED (BGRL) TENDERS.
ALL THE TERMS & CONDITIONS IN THE ENCLOSED GPC SHALL BE
APPLICABLE FOR THIS TENDER.
Rev. 0 Supply of Motor Driven Variable Suction Compressor for Maharashtra GA Page 1 of
General Purchase Conditions Date:22.01.2020
The following conditions shall be applicable for all Non Hydrocarbon procurement unless specifically
mentioned in the Special Purchase Conditions.
2. REFERENCE FOR DOCUMENTATION
3. RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
4. LANGUAGE OF BID
6. TAXES AND DUTIES
9. INDIAN AGENT COMMISSION
10. ORDER AWARD / EVALUATION CRITERIA
11. CONFIRMATION OF ORDER
12. PAYMENT TERMS
13. GUARANTEE/WARRANTY
14. PERFORMANCE BANK GUARANTEE
15. PACKING & MARKING
17. UNLOADING AND STACKING
18. TRANSIT INSURANCE
19. VALIDITY OF OFFER
20. DELIVERY DATES AND PRICE REDUCTION SCHEDULE
21. RISK PURCHASE CLAUSE
22. FORCE MAJEURE CLAUSE
23. ARBITRATION CLAUSE
24. INTEGRITY PACT (IP)
25. RECOVERY OF SUMS DUE
26. CONFIDENTIALITY OF TECHNICAL INFORMATION
27. PATENTS & ROYALTIES
28. LIABILITY CLAUSE
29. LIMITATION OF LIABILITY FOR GOODS PROCUREMENT
30. COMPLIANCE OF REGULATIONS
31. REJECTION, REMOVAL OF REJECTED GOODS AND REPLACEMENT
33. NEW & UNUSED MATERIAL
34. PURCHASE PREFERENCE CLAUSE
35. CANCELLATION
36. ANTI –COMPETITIVE AGREEMENTS/ABUSE OF DOMINANT POSITION
38. GOVERNING LAW
41. POLICY ON HOLIDAY LISTING
42. ORDER OF PRECEDENCE FOR PURCHASES
43. TERMINATION FOR CONVENIENCE
44. BUILDING AND OTHER CONSTRUCTION WORKERS CESS
GENERAL PURCHASE CONDITIONS
1. DEFINITIONS:
The following expressions used in these terms and conditions and in the purchase order shall have the
meaning indicated against each of these:
1.1. OWNER: Owner means Bharat Petroleum Corporation Limited (a Government of India enterprise), a
Company incorporated in India having its registered office at Bharat Bhavan, 4 & 6 Currimbhoy Road,
Ballard Estate, Mumbai 400038 and shall include its successors and assigns (hereafter called BPCL as a
1.2. VENDOR: Vendor means the person, firm or the Company/ Corporation to whom this Request for
quotation (RFQ)/purchase order is issued and shall include its successors and assigns.
1.3. INSPECTOR: Person/ agency deputed by BPCL for carrying out inspection, checking/testing of items
ordered and for certifying the items conforming to the purchase order specifications..
1.4. GOODS/ MATERIALS: means any of the articles, materials, machinery, equipments, supplies, drawing,
data and other property and all services including but not limited to design, delivery, installation,
inspection, testing and commissioning specified or required to complete the order.
1.5. SITE/ LOCATION: means any Site where BHARAT PETROLEUM CORPORATION LIMITED desires to receive
materials any where in India as mentioned in RFQ.
1.6. “RATE CONTRACT” means the agreement for supply of goods/ materials between Owner and Vendor, for
a fixed period of time (i.e till validity of Rate Contract, with no commitment of contractual quantity) on
mutually agreed terms and conditions. The actual supply of goods/ materials shall take place only on issue
of separate purchase orders for required quantity as and when required by Owner.
2. REFERENCE FOR DOCUMENTATION:
2.1. The number and date of Collective Request for Quotation (CRFQ) must appear on all correspondence
before finalization of Rate Contract / Purchase Order.
2.2. After finalization of Contract / Purchase Order: The number and date of Rate Contract/ Purchase Order
must appear on all correspondence, drawings, invoices, dispatch advices, (including shipping documents if
applicable) packing list and on any documents or papers connected with this order.
2.3. In the case of imports, the relevant particulars of the import Licence shall be duly indicated in the invoice and
shipping documents as well as on the packages or consignments.
3. RIGHT OF OWNER TO ACCEPT OR REJECT TENDER:
The right to accept the tender will rest with the Owner.
The Bid and all supporting documentation and all correspondence whatsoever exchanged by Vendor and
Owner, shall be in English language only. In case any of the supporting documents (either technical or
financial) are not in English language, then the English translation copy of the same shall also be furnished
duly certified, stamped and signed by local Chamber of Commerce of bidder’s country or Indian embassy
in bidder’s country or their embassy in India
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21026.pdf
pdf • 1.23 MB
BUDGETDOC_21026.pdf
pdf • 4.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .