Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹25.3 L+₹2.3 L (10.2%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹26 L
EMD Value
₹52,000
Closing Date
11 Nov 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
MGCCD4 AMROHA
CONSTRUCTION OF CONTROL CABIN CUM SITE OFFICE BEHJOI BRANCH AT KM 22.750 RIGHT BANK UNDER MGC PROJECT STAGE-II DIST AMROHA LOT 10
2021_UPIDC_640014_1
03/EE/21-22 LOT 10
Open Tender
Civil Works - Canal
Item Rate
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹52,000
16 Mar 2022
5 Nov 2021
11 Nov 2021
5 Nov 2021
11 Nov 2021
5 Nov 2021
90 days
Amount
Earthwork in Excavation of foundation in ordinary soil including all lift and 30 metre lead with back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T & P etc but excluding cost of dewatering . The earth from cutting or excavation to be used in making embankment or to be deposited as spoil bank within 30 metre distance as directed by Engineer-in- charge.
Laying of C.C 1:5:10 in foundation including all cost of coarse sand , coarse aggregate of 20 mm to 40 mm size, all mterials, labour and T&P for proper complition of work.
20 mm Thick DPC in 1:2 cement sand ratio with water proofing coumpound including cost of all mterials, labour and T&P for proper complition of work.
23 cm Thick Brick work in 1:4 cement mortar including cost of all mterials, labour and T&P for proper complition of work in super structure up to 3.0 mtr height.
11.5 cm Thick Brick work in 1:4 cement mortar including cost of all mterials, labour and T&P for proper complition of work in super structure up to 3.0 mtr height.
Filling up brick bats including cost of all labour material and T&P etc.complete for proper completion of work.
Filling up sand as blanket including all labour material and T&Ps etc. complete for proper completion of work.
Centring & Shuttering for R.C.C work including cost of all mterials, labour and T&P for proper complition of work.
Laying of R.C.C 1:1.5:3 in slabs, lintel, beam, sun shed etc. including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, also including all cost of mterials, labour and T&P for proper complition of work excluding cost of steel.
Furshing and placing steel reinforcement including cutting, bending, binding and placing in position including cost of all mterials, labour and T&P for proper complition of work.
Providing and fixing of M.S. Angle 40 X 40 X 6 mm for frame for chowkhat of Door including all cost of mterials, labour and T&P for proper complition of work.
Providing and Fixing of fully glazed Z- section steel windows including all cost of mterials, labour and T&P for proper complition of work.
Plastring 12.50 mm thick in 1:4 cement mortar including cost of all labour material, T&P ets.required for proper completion of work.
20 mm Thick skirting / dedo in 1:3 cement mortar including cost of all mterials, labour and T&P for proper complition of work.
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Painting two coat over one coat of primer including all cost of labour material and T& Ps required for complition of work.
Distampering one coat of oil bound distamper of approved brand and manufacturer and required shade on undecorated wall surface to with an even sheds over and including a primer coat with cement primer of approved brand and manufacturer after thorouglly brushing the surface free from mortar dropping and other froeign matter and also including preparing the surface all needed.
Providing and fixing of Glass strip of size 3.15 mm thick and 22 mm depth including all cost of labour material and T& Ps required for complition of work .
25 mm thick C.C in 1:2:4 over 75 mm thick C.C 1:5:10 in flooring including all cost of labour material and T& Ps required for complition of work .
25 mm thick C.C in 1:2:4 without base concrete in floors including all cost of labour material and T& Ps required for complition of work .
Providing & Fixing 32 mm thick plywood door (Flush) including cost of all fittings, labour, material and T& Ps required for complition of work .
Making of drip coarse over the sun sheds and facia junctions including all cost of labour material and T& Ps required for complition of work .
Supplying and fixing of 6 mm. china white glazed tiles in flooring or skirting or in dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry jointing & polishing comlete including cost of all material labour T&P, all lifts and leads etc.
Supplying and fixing of 4 mm. china white glazed tiles walls with 1:3 cement and approved coarse sand mortar finished with white cement slurry jointing & polishing comlete including cost of all material labour T&P, all lifts and leads etc.
Supplying and fixing of PVC 4" dia pipe i/c all cost of material, labour, T&P etc. complete for proper completion of work
S/F CC jali 50 mm thick outside varandah wall i/c all cost of material, labour, T&P etc. complete for proper completion of work
S/F of mangalore ridge tiles 20 mm thick furnered brown etc over inclined roof on side varandah or any inclined concrete surface i/c all cost of material, labour, T&P etc. complete for proper completion of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Snowcem washing of two coats over one cot of primer including all cost of labour material and T& Ps required for complition of work
Electric Bell
SAKSHAM POWER CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .