Tender Value
₹10.6 L
EMD Value
₹26,396
Closing Date
13 Aug 2026, 3:00 pmClosed
Assistant Executive Engineer
WSSD, NTA
DEPOSIT-Railway -Doubling of track between Thiruvananthapuram-Kanyakumari project-Realigning water supply line in connection with doubling of railway line at Punnakadu and Villikulam area
2026_KWA_864357_1
WRD/KWA-CE(SR)/TR/13525/2024
Open Tender
Civil Works - Water Works
Item Rate
180 days
Neyyattinkara
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,760
Yes
₹26,396
Yes
5 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour charges | |||||
| 1.001 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | - | cum | - | - |
| 1.002 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.003 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - |
| 1.004 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
| 1.005 | 100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes. | - | metre | - | - |
| 1.006 | OD51190/2024-2025:Making connection from the newly proposed pipe line to the140/110/90/75/63 mm PVC pipe branch lines using required sizes of pvc Tee including cost of materials labour charges for cutting pipe and making Tee connection etc.. complete as per the direction of departmental officers. | - | no | - | - |
| 1.007 | OD51194/2024-2025:Alteration/ Making re connection with the existing water connection, /SF connection-Alteration using 20mm Indian Standard Class 6 uPVC pipe and uPVC /Brass specials viz. brass ferrule, Elbow, MTA(Brass Threaded,), FTA(Brass Threaded,), couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, safely removing & re-fixing existing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges as per the directions of the department officers. | - | no | - | - |
| 1.008 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.009 | 100.60.3.2.1:Providing additional length of house connection pipe using 25mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers | - | metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1462408.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .