Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BE BLOCK 396 BACK SIDE GALI NO 7 HARI NAGAR SOUTH WEST DELHI DELHI 110064 | WEST DELHI | DELHI | 110064 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹6,700
Closing Date
12 Dec 2022, 11:30 amClosed
EEEANDMM-5
EEEANDMM-5 NEAR KANHIYA NAGAR METRO STATION DELHI -35
Dismantling/commissioning of defective tube wells for distribution of water supply in Amba Bagh sub division AC-19
2022_DJB_232593_11
NIT NO. 16 (2022-2023)
Open Tender
Miscellaneous Services
Item Wise
75 days
EEEANDMM-5
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
THROUGH DJB OFFICIAL WEBSITE IN LINK TENDER
₹6,700
20 Dec 2022
5 Dec 2022
12 Dec 2022
5 Dec 2022
12 Dec 2022
5 Dec 2022
Dismantling of defective tube wells by taking out defective submersible pump set etc. from bore having depth up to 100 to 300 feet by doing following works:- Taking out double flange GI pipes by cutting the rusted nuts and bolts if required from the bore. Taking out submersible cable, pump sets as required and replacement of defective G.I. pipe, cable or pump sets as required for operation of tube well again. Lowering of submersible pump sets, cable, pipe etc as required at site joining of cable from sub. P/sets along with holding of cable with pipes and joining of D/F pipes etc. with nut and bolt rubber packing etc. will be supplied by the DJB. Connection of sub. Cable with starter, switch fuse unit etc. fixed in the LT panel board for operation of submersible pump set Work further includes fixing of GI bend clam and other accessories for running of submersible. All T&P, tripod stand and other material handling equipments transportation shall be arranged by the firm. Work will be carried out taking all safety measures/precautions as required for over head/electrical works/outdoor jobs as per requirements of NHRC. Deptt. Will not be responsible for any eventualities/accident/mishappening while doing work. NOTE: All materials to be replaced including sub. Pump set & other material i.e. nuts bolts rubber packing wire etc. will be provided by the department. The payment to be released on actual work basis.
Aqua Mech Systems
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .