| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 CrAccepted-AOC RAM NAGAR NEW BUS STAND NARWANA 126116 | NARWANA | JIND | HARYANA | 126116 | ₹27.0 Cr Quoted ₹27.1 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹27.4 CrRejected-Finance C 21 SUSHANT LOK III SECTOR 57 GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹27.4 Cr | L2 | Rejected-Finance quoted rate are on higher side |
| 3 | L3₹28.0 CrRejected-Finance HOUSE NO 399 NEAR UNION BANK BARWALA 125121 | HISAR | HARYANA | 125121 | ₹28.0 Cr | L3 | Rejected-Finance quoted rate are on higher side |
| 4 | L4₹28.1 CrRejected-Finance SCF 44 MODEL TOWN PANCHKULA HARYANA | JIND | HARYANA | 126116 | ₹28.1 Cr | L4 | Rejected-Finance quoted rate are on higher side |
| 5 | L5₹29.4 CrRejected-Finance | ₹29.4 Cr | L5 | Rejected-Finance quoted rate are on higher side |
| Sl No | Description | Qty | Unit | M / S DAYANAND CONTRACTOR L6 | P.S. INFRABUILD PRIVATE LIMITED L5 | R K JAIN INFRA PROJECTS PRIVATE LIMITED L2 | Raghbir Singh Contractor L1 | TEJWANT RAI GOVT CONTRACTOR L3 | M/s Bishan Parkash and Company L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | (NS item) CREDIT OF RCC NP3 PIPE | 76.2 | Per Metre | 536 -₹40,843.20 | 600 -₹45,720 | 536 -₹40,843.20 | 950 -₹72,390 | 476.23 -₹36,288.73 | 536 -₹40,843.20 |
| 2.00 | (NS item)Credit of dismantled brick and brick bats. | 56.19 | Cum | 880 -₹49,448.08 | 880 -₹49,448.08 | 880 -₹49,448.08 | 1,150 -₹64,619.65 | 781.88 -₹43,934.62 | 880 -₹49,448.08 |
| 3.00 | (NS item) Credit of CC Blocks | 8,34,847 | Nos | 1.2 -₹10,01,816.40 | 1 -₹8,34,847 | 1.2 -₹10,01,816.40 | 1.6 -₹13,35,755.20 | 1.06 -₹8,84,937.82 | 1.2 -₹10,01,816.40 |
| 4.00 | (NS Item)Providing,Fixing,laying cross shaped Rubber Stop Seal with vertical member 100 mm and horizontal member 50 mm as per relevant IS code complete in all respect as directed by Engineer -in- charge. | 1,55,058 | Metre | 95 ₹1.5 Cr | 75 ₹1.2 Cr | 85 ₹1.3 Cr | 114 ₹1.8 Cr | 106.62 ₹1.7 Cr | 70 ₹1.1 Cr |
Tender Value
₹31.6 Cr
EMD Value
₹63.2 L
Closing Date
23 Dec 2025, 6:00 pmClosed
PARSHANT KUMAR
W.S.Division Gohana
Estimate for the Remodelling of Bhalaut Sub Branch from Rd 38820 to 83000
2025_HRY_487476_1
20259D576D78 497C 44FD B2FF 0A44F106AACC210IRR
Open Tender
Civil Works
365 days
Gohana Kharkhoda Sonepat Rohtak
3 documents required · 3 mandatory
₹20,000
₹63.2 L
Yes
O/o Executive Engineer, Gohana W/S Division,Gohana
17 Mar 2026
2 Dec 2025
24 Dec 2025
2 Dec 2025
23 Dec 2025
2 Dec 2025
2 Dec 2025 - 22 Dec 2025
12 Dec 2025
(NS item) CREDIT OF RCC NP3 PIPE
(NS item)Credit of dismantled brick and brick bats.
(NS item) Credit of CC Blocks
(NS Item)Providing,Fixing,laying cross shaped Rubber Stop Seal with vertical member 100 mm and horizontal member 50 mm as per relevant IS code complete in all respect as directed by Engineer -in- charge.
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
(HSR item)[34.3.2]Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 2. English and Roman (Hyphens not to be paid) [Through Rate]
(HSR item) [14.72]Ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
(HSR item) [6.22.2.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.2. All works up to Plinth Level : M-15 grade plain cement concrete. (cement content considered @ 240 kg/cum) [Through Rate]
(HSR item) [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
(HSR item)[14.16.2]Extra allowance for form work in concrete lining 2. On side slopes [Through Rate]
(HSR item)[14.68.3.1.2]Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum as per required thickness including I0 mm thick cement plaster 1:5, curing, form work, dressing and preparation of sub grade as per directions of Engineer-in-charge. 3.1.2. 125mm thickness In bed Using Paver (Excluding form work) [Through Rate]
(HSR item) [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
(HSR item)[7.21.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
(HSR item) [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate]
(HSR item)[14.71]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km . [Through Rate]
(HSR item) [5.53.1]Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge 1. up to 600 mm dia [Through Rate]
(HSR item)[14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means [Through Rate]
(HSR item) [34.1.2]Cast in Situ Cement Concrete M20 Kerb Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 2. Using Concrete Batching and Mixing Plant [Through Rate]
(HSR item) [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
(HSR item)[17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate]
(HSR item)[14.68.3.2.2]Lining with design mix concrete of grade M-15 with minimum cement content 240kg/cum as per required thickness including I0 mm thick cement plaster 1:5, curing, form work, dressing and preparation of sub grade as per directions of Engineer-in-charge. 3.2.2. 125mm thickness In slope Using Paver (Excluding form work) [Through Rate]
(HSR item) [14.70]Demolishing of lining with Bricks/Tiles /Cement concrete blocks of any size manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. [Through Rate]
(HSR item [21.95.1]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 1. 350 mm [Through Rate]
(HSR item) [20.63.1]`Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-9 grade SandS pipes as per 15:8329-2000 (amended up to date), with internal cement mortar lining for potable water with rubber ring (EPDM/SBR) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/W to be measured and paid separately. ` 1. 100 mm i/d [Through Rate]
(HSR item)[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
(HSR item) [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
(HSR item)[34.27.2]Kilometre Stone Reinforced cement concrete M25 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc complete as per technical clause 804 of MORTH Specifications 2. Ordinary kilometre stone (precast) [Through Rate]
(HSR item) [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_565583.xls
BOQ • 0.29 MB
OT0142119.pdf
Other Document • 2.78 MB
Download all tender documents and submit your bid