Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹56.2 LAccepted-AOC COLLEGE CHOWMUHANI JIRANIA WEST TRIPURA | 1 | Accepted-AOC Accepted as lowest bidder by STC-II Members | |
| 2 | Rejected-Technical JOGENDRA NAGAR AGARTALA WEST TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | - | Rejected-Technical Found unqualified during Technical Evaluation | |
| 3 | Rejected-Technical DAMDAMA PO SABROOM SABROOM SOUTH TRIPURA | SABROOM | SOUTH TRIPURA | TRIPURA | - | Rejected-Technical Found unqualified during Technical Evaluation |
Tender Value
₹56.7 L
EMD Value
₹96,036
Closing Date
16 Apr 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM
O/o the DGM, ED-Jirania
Electrification of un-electrified Households and Public Places under DA JGUA Scheme within the jurisdiction of ESD Mandwi
2025_POWER_60088_1
DGM/ED/JRN/2025-26/01
Open Tender
Electrical Works
Turn-key
150 days
within the jurisdiction of ESD-Mandwi under ED-JRN
As per Tender requirement
3 documents required · 3 mandatory
₹10,000
₹96,036
Yes
O/o the DGM, ED-Jirania
28 May 2025
7 Apr 2025
17 Apr 2025
7 Apr 2025
16 Apr 2025
8 Apr 2025
8 Apr 2025 - 9 Apr 2025
10 Apr 2025
Amount
SCHEDULE - A
Supply of DTR 25 KVA 11/0.433 KV Aluminium Wound- BIS Level-2
Supply of 9 Mtr. long ST pole(SP 30)
Supply of 8 Mtr. long ST pole
Supply of 8 Mtr. long PCC pole.
Supply of Stay set complete.
Supply of Stay insulator for H.T
Supply of Stay insulator for L.T
Supply of Stay wire 7/4 mm.
Supply of M.S Channel 100x50x50x6mm.
Supply of M.S Channel 75x40x40x6mm.
Supply of M.S Angle 65x65x6mm.
Supply of ACSR Weasel (30 sq mm) conductor
Supply of G.I wire 8 SWG.
Supply of 11 KV G.O Switch (3-Ph)
Supply of 11 KV D.O Fuse unit ( 3-Ph )
Supply of 11 KV L.A
Supply of 11 KV 45 KN Disc insulator (Poly)
Supply of 11 KV Disc fittings.
Supply of 11 KV Pin insulator (Poly)
Supply of PVC Cable 70 mm.²
Supply of PVC Cable 2.5 mm.²
Supply of Cut Out 100 Amps.
Supply of Reel Insulator (16-25mm)2
Supply of Alluminium lugs 70mm2
Supply of Wooden plank (AS)
Supply of G.I Strips 25x3mm for DTR Earthing
Supply of LT AB Cable (3x25+1x25+1x16) sq. mm
Supply of Suspension Clamp
Supply of Dead end Clamp
Supply of Eye hook
Supply of Pole Clamp
Supply of Distribution Box 3phase
Supply of Insulation Piercing Connector (IPC)
Supply of Bracket clamp
Supply of Stay clamp
Supply of M.S Nuts & bolts i/c Washer of assorted size ISI Mared machine made.
Supply of 2.5 Mtr. long, 40mm dia G.I Pipe. (Make:- TATA,/ JINDAL)
Supply of 60Kg salt & 55Kg Charcoal (for 1 Pit)
Erection of 9 mtrs length of Steel Tubular Pole at any kind of soil upto a depth of 1/6th of pole height, including excavation of earth, refilling the pit with soil upto the ground level, ramming and making complete in all respect.
Erection of 8 mtrs length of Steel Tubular Pole at any kind of soil upto a depth of 1/6th of pole height, including excavation of earth, refilling the pit with soil upto the ground level, ramming and making complete in all respect.
Erection of 8 mtrs length of PCC Pole at any kind of soil upto a depth of 1/6th of pole height, including excavation of earth, refilling the pit with soil upto the ground level, ramming and making complete in all respect.
Erection of stay set direct in earth complete with 19mm x 1800mm long stay rod, anchor plate of size 300 x 300 x 8mm, thimble, turn buckle, 7/3.15mm dia GI standed stay wire and stain insulator etc. with supply of M.S. clamp, Nuts & Bolts, etc. as required and making complete in all respect.
Erection of M.S. Channel Cross- Arm 0.3 to 1.2 Mtr. Long 75 x 40 x 40x 6mm (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S. Channel Cross- Arm 1.3 to 2.8 Mtr. Long 75 x 40 x 40x 6mm (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of M.S. Angle Cross- Arm 1.0 to 2.5 Mtr. Long 65 x 65 x 6mm (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of 11 KV Pin insulator alomg with Pin
Erection of 11 KV Disc insulator set along with necesary fittings.
Laying & stringing of 1KM (single conductor) ACSR 6/1/2.59mm dia 'WEASEL' including hoisting & binding etc. Complete as required.
Positing of cable drum, removing of cable from drum and Laying, hoisting & drawing of AB Cable 3x25+1x25+1x16 sq. mm of 101KV grade as per direction of Engineering In-Charge.
Fitting-Fixing of Service main 1/3Phase distribution box of 1.1KV grade on Steel Pole with the help of Pole brackets or Steel Straps & buckles as per direction of Engineering In-Charge
Erection & Fitting- Fixing of Insulated suspension clamp including pole clamp, Eye hook for cable massenger of 1.1KV grade on Steel Pole with the help Pole brackets or Steel Straps & buckles as per direction of Engineeing In-Charge
Erection & Fitting- Fixing of Insulated Dead end enchoring clamp including pole clamp, Eye hook for cable massenger of 1.1KV grade on Steel Pole with the help Pole brackets or Steel Straps & buckles as per direction of Engineeing In-Charge
Erection & Fitting- Fixing of Insulation Piercing connectors (IPC) all sizes of 1.1 KV grade including connection from main cable to Distribution box, Tee-off as per directioin of Engineering In-Charge
Laying & stringing of 1KM (single conductor) 10/8SWG G.I wire including hoisting & binding etc. Complete as required.
Erection of 11kv protective guarding by GI wire 8SWG as per technical specification, across road/ River/Telecom line etc. in horizontal formation complete.
Erection of M.S. Channel Cross- Arm 0.6 to 2.8 Mtr. Long 100 x 50 x 50x 6mm (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of 11KV 200 Amp. GOS unit set of three nos, including necessary connection complete as per technical specification. (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of 11KV DOF unit set of three nos, including necessary connection complete as per technical specification. (Excluding the cost of Back clamp, Nuts & Bolts)
Erection of 9KV, 5KVsingle pole metal oxide gapless type LA, including necessary connection complete as per technical specification.
Installation/ Positioning of 11/0.430KV, 3-Phase 25KVA of Distribution Transformer on Pole with necessary connection & fitting fixing of all allied accessories components as required for making completein all respect for energizing.
Earthing with G.I pipe 2.5mtr. long and 40mm dia,including excavation, riffiling with alternate lauer of salt & charcoal as per drawing (excluding supply of G.I. Pipe, Salt & Charcoal, G.I. wire, Nuts & Bolts, etc. as per required )
Laying of 8 SWG GI wire at 300mm below the ground level for earthing of Sub-Station equipments from the earth electrode
Providing Single Phase service connection with laying PVC cable from nearby Electrical pole to Premises upto 35mtr. in length supported by G.I wire, Reel Insulator i/c fitting fixing of Energy Meter as required.
Grouting of steel tubular poles of ratio 1:2:4 (1 cement, 2 river sand, 4 jhama brick) aggregate of complete with excavation , refilling of earth, ramming alongwith centering & shuttering as reqd. @ 0.273 Cum per pole.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .