Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
15 Jun 2026, 6:00 pm
PGVCL Divison Office-1, Morbi-1
Annual Rate Contract for(East & North Zone Area) New HT, LT Connection & Replacement of TC/CTPT for ND, SPA, SI, SKJY and all type of Scheme work under Ghuntu Ind Sdn (PR.863222)
311208
EEMRB-1/T-1/E-Tender Notice/1999/Dt.04.06.2026
Open
Electrical and Maintenance Works
Morbi
6 documents required · 5 mandatory · 1 optional
₹1,180
PGVCL Division Office-1, Morbi
₹20,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
2 Estimated cost in Rs. 20,00,000/-
3 Tender Fee in Rs. ( non-refundable) 1180/-
4 Payment of tender fees to be deposited online by N.A.
RTGS/NEFT to the details of bank account is SBI, A/C
No.056071000401 IFSC code:-SBIN0060071 and name
of account holder Paschim Gujarat Vij Company Limited
Earnest Money Deposit amount in Rs.
(1 % of Tender Amount) (Payment RTGS/NEFT to
the details of bank account is SBI, 20000/-
A/CNo.056071000401 IFSC code:-SBIN0060071 and
Name of account holder Paschim Gujarat Vij Company
6 On line ( e-tendering ) tender / offer
submission last Date 15.06.2026 up to 18:00 hours only
(This is mandatory )
7 Date & Time for pre bid meeting ( If Required) No
8 No Requirement of Physical submission of all the
relevant Documents
9 Date of opening of Technical Bid at Date 16.06.2026
@11:00 hours (if possible)
10 Date of on line opening of Price bid, Date 16.06.2026
@11:00 hours (if possible)
11 Validity of Bid 120 Days
Sign & Stamp of the Bidder P a g e 1 |
Sr. Particulars Page
1 Tender Details Table No 1
2 SECTION I: INSTRUCTIONS TO THE BIDDER
3 SECTION II: Schedule A
4 SECTION III: General Instructions to the
successful bidder
5 SECTION IV :TERMS & CONDITIONS
REGARDING INDUSTRIAL LAWS AND OTHER
RELATED MATTERS
6 SECTION V : TAXES
7 SECTION VI : General Terms & Conditions
8 SECTION VII : Annexure I to XI, BG Formats
for EMD and, SD, Agreement and Indemnity
9 SECTION VIII : Technical Specifications
10 SECTION IX : Drawings
11 SECTION X : Schedule B
Sign & Stamp of the Bidder P a g e 1 |
GENERAL INFORMATIOS FOR BIDDERS
1.1 The "PGVCL" shall mean the Executive Engineer MORBI Division-1, PASCHIM
GUJARAT VIJ COMPANY LTD., having its corporate office at Nana mava Main Road,
Laxminagar, Rajkot. With expression shall unless repugnant to the context include its
permitted assigns or successor / authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been
accepted by the PGVCL for award of the contract and shall include his authorized
representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act as
Engineer-in-Charge to supervise the work – for the purpose of the contract.
1.4 The "Specification" shall mean the tender forming a part of the contract along with
Performa, schedules and drawings.
1.5 The "Order" shall mean the official letter issued by the PGVCL, informing the bidder that
his tender has been accepted.
1.6 The "Contract" shall mean the agreement to be entered into by the PGVCL with the
contractor and shall include the commercial technical and general conditions,
schedules, drawings and any other conditions specifically agreed between the parties
forming a part of the contract.
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement
as per order placed by the PGVCL and calculated from the quantities indicated in the
1.9 The "Completion Period" shall mean the period starting from the date of issue of "Order"
and required to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
1.11 “Inspector” shall mean the any person nominated by PGVCL from time to time to
inspect the works under the contract and/or duly authorized representative of the
PGVCL “Letter of Award” shall mean the official notice issued by the PGVCL
notifying the contractor that his bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been issued.
1.13 “Month” shall mean the calendar month day or days unless herein otherwise
expressly defined shall mean calendar day or days of 24 hours each.
1.14 “A Week” shall men the continuous period of seven days.
1.15 HT means High Tension
1.16 LT means Low Tension
1.17 U/G means Under Ground
1.18 Electricity Rules: - All the works shall be carried out in accordance with latest Rules
under Electricity Act-
1.19 Testing: - After completion of work execution required Tests are to be taken in
Presence of Engineer in Charge whenever required.
1.20 Definition of “Similar work” for overhead network: Erection of overhead Electric
Network up to voltage level 22 KV
1.21 Definition of “Similar work” for underground network: Laying of HT / LT
Underground Power cable network for Distribution system.
Sign & Stamp of the Bidder P a g e 1 |
2. PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
2.1 Approve vendor is only qualified for participate in this tender. The work
executed through open / advertised tender shall only be considered for experience
of work. The work done through limited tender shall not be considered for
2.2 Any vendor having any work delayed by more than 120 days in entire
division will be disqualified from participation. Other vendor promoted by
one or more similar partners of vendors promoted by one or more similar
partners of agencies so disqualified will also be disqualified
2.3 Following documents are mandatory for the Bidders.
The vendor registration policy to include eabinitio. No submission during BID is
The self-certified online transaction slips for tender fee and EMD.
The cancelled check of concern bidder is to be attached for further course
action of payment as per rule through RTGS/NEFT by PGVCL.
Bidder has to upload scanned copies of original (Notarized/self-attested copies
of original–as specified in this tender) with bid.
It shall be sole responsibility of the bidder that the uploaded scanned documents (in
PDF form)remain legible and should not be password protected.
3. INSTRUCTIONS FOR E TENDERING (ON LINE TENDERING) TO BIDDERS.
3.1 Bidders willing to participate in tender will have to get themselves registered on
website www.nprocure.com
3.2 Bidders willing to participate in tender should have valid digital certificate / Digital
Signature as per Information technology Act 2000 using which they can sign their
electronic bids. Bidders can also procure the same from (n) code solutions, a division
of GNFC Ltd., who are licensed certifying authority by Govt. of India.
Download tender Documents from nprocure web site up to date shown in
The tender document.
3.3 For details regarding digital certificate and related training the below mentioned
address may be contacted
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev,
3.4 Bidders who already possess valid Digital certificate need not procure a new digital
3.5 Bidders can prepare and edit their offers number of times before tender submission
date and time as mentioned in this tender details table no1. After tender submission
date and time, bidder cannot edit their offer submitted in any case. No written or
online request in this regard shall be granted.
3.6 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in Electronic
format on website www.nprocure.com before the validity period mentioned in
tender details Table no1.
3.7 Offers submitted without digitally signed will not be accepted.
3.8 Offers only in physical form will not be accepted in any case
Sign & Stamp of the Bidder P a g e 1 |
4. UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND
SPECIFICATIONS.
4.1 All interested parties are requested to understand this Tender Document in detail in
order to comply with PGVCL’s requirements including but not limited to the Tender
fees, EMD and deadlines, selection criteria, selection methodology, scope of work,
and minimum technical standards.
4.2 The Bidder is required to carefully examine the specifications and documents and
fully inform himself as to all the conditions and matters which may in any way affect
the Work or the cost thereof. If any Bidder finds discrepancies or omissions in the
specifications and documents or is in doubt as to the true meaning of any part, he
shall at once request in writing in advance before filling in the tender, within the time
limit as per Table no 1, for an interpretation/ clarification by the PGVCL MORBI
Division office-1. Then The PGVCL MORBI Division office-1 will issue interpretation
and clarifications as he may think fit of such interpretations and clarifications, the
Bidder may submit his bid but within the time and date as specified in the Table no1.
All such interpretations and clarifications shall form a part of the specifications.
and documents, and accompany the bidder's proposal. In case of difference of
opinion about interpretation of specification etc. the decision of Executive Engineer,
MORBI Division will be final and shall be binding to the contractor.
4.3 Verbal clarifications and information given by the PGVCL or his employee(s) or his
representative(s) shall not in any way be binding on the PGVCL.
4.4 All interested parties requested to strictly abide by all terms prescribed in this RFP
Document and provide accurate information to the best of their knowledge without
misleading PGVCL to be considered for participation in this Project.
4.5 Bidders should be in touch with websites https://pgvcl.nprocure.com &
www.pgvcl.com for information regarding revision/ corrigendum/ Amendment
in the Tender Document till due date of online/offline submission and
thereafter. No separate information shall be sent in this regards and also not
publish in newspaper.
5. TENDER FEES (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST Rules in
force during this Tender Period.
5.1 The Tender fees is payable, as per following Table, between the dates mentioned in
Table no-1 by RTGS/NEFT to the details of bank account is the SBI, A/C No.
056071000401 IFSC code;-SBIN0060071and name of account holder Paschim
Gujarat Vij Company Limited. The transaction ID and Slip is to be uploaded in on line
Tender Fees Present rate of
Sr.No Tender Amount
Above Rs 5,00,000/-
Above Rs10,00,000/-
Above Rs25,00,000/-
5.2 The tender fees once paid for tender document will not be refunded under any
circumstances or not transferred to other bidder.
Sign & Stamp of the Bidder P a g e 1 |
6. EARNEST MONEY DEPOSIT (EMD)
6.1 The EMD payable, between the dates mentioned in Table no 1, Payment RTGS/NEFT to
the details of bank account is SBI, A/C No.056071000401 IFSC code:-SBIN0060071070 and
name of account holder Paschim Gujarat Vij Company Limited. The EMD Amount is 1 %
of the Tender Estimated Cost.
6.2 The digital copy of amount transfer towards Tender fee and EMD is to be uploaded with
the tender documents.
6.3 The EMD of all unsuccessful bidders except that of the successful bidder will
be returned after the award of the contract.
6.4 EMD of the successful bidder to whom a contract is awarded will be returned
after the said bidder pays the security deposit and signs the contract agreement.
6.5 If the successful bidder fails to submit a Security Deposit within 15days from the date of
LOA of the contract or fails to sign the contract agreement then the EMD amount will
be forfeited in favour of PGVCL without any notice or and action for “Stop deal” will be
initiated as decided by tender inviting authority.
6.6 No interest will be payable by the PGVCL on the above Deposit.
6.7 Tenders without Earnest Money Deposit by the firms/Name will be rejected without
entering in to further Correspondence in this regard and no reference will also be
7. In case of On line Tenders
7.1 Technical & Commercial Bid cover:
Following documents are mandatory and to be upload scanned copies of
original(Notarized/Self attested copies of original-as specified in tender documents).
1. The vendor certificate issued form Circle office is to be attached.
2. All the tender documents to be uploaded with online bid only.
3. Online amount transaction details slip of tender fee and Earnest Money Deposit.
4. Every bidder should, at the time of submission of bid, give a declaration, that
bidder shall not have conflict of interest with other Bidders for particular quoted
7.2 Commercial / Price Bid:
The bidder must clearly quote their rates in Schedule – B of this tender, in
percentage above than, below than or equal to, the tender rate in figure as well as in
words. The bidder should specify whether the quoted rates are with or without
prevailing taxes, if applicable, in force at that time, The bidder must work out the total
price of their tender offered accordingly and the total amount should be clearly
price of their tender offered accordingly and the total amount should be clearly
written in words & figure, in case of any discrepancy whatever written in words shall
prevail. Company shall at liberty to decide the matter as it deem fit.
Further bidders, for “On line tenders”, are requested to submit price – bid on-
line only and not to submit the price bid in physical form. This is mandatory. If
price bid is submitted in physical form, same will not be opened and only on-line
submitted price bid will be considered for evaluation. In On Line price Bid, GST is
to be mentioned in separate raw/Column.
PGVCL reserves the right to reject any OR all tenders without assigning any
reasons thereof.
8. All the submission is to be done in online exclusively. No physical submission of
Technical-Commercial/Price bid is necessary.
9. The works referred here in shall cover the entire scope of the Tender.
10. The issuance of bid document would not mean that the bidder has qualified for the
bidding. Hence bidders should ensure themselves of their credentials be for e-submitting
Sign & Stamp of the Bidder P a g e 1 |
11. Executive Engineer, PGVCL, Morbi Division Office-1 reserves the right to spread the order
12. Does not anticipate change in the PGVCL ownership during the proposed period of work.
13. AMENDMENT TENDER
13.1 At any time prior to the deadline for submission of bids, as mentioned in Table1,PGVCL
may, for any reason, whether at its own initiative or in response to a clarification
requested by a respective bidder, modify the bidding documents by amendments.
13.2 The amendment will be notified, only on PGVCL Website & nprocure website in case of
on line tender, PGVCL will bear no responsibility or liability arising out of noncompliance
of the same in time or otherwise.
13.3 Such amendments, clarification etc. shall be binding on the bidders and will be given
due consideration by the bidders while they submit their bids and invariably enclose
such documents as a part of the bid.
14. SUBMISSION OF TENDERS
14.1 Follow all the instructions narrated this tender document for submission and no any
further communication in the matter will be entertained.
The Bidders must ensure that all the Annexures are completely filled in their tenders
and the information called for is given in totality. A set of complete tender documents is
required to be submitted duly signed and stamped by authority competent to sign on
behalf of bidder on each page as a token of unconditional acceptance to the conditions
of various clauses of tender documents. The bidder's bid and the documents attached
there to shall be considered for forming part of the contract documents.
14.2 For “On Line Tenders”
Tender Papers & Specifications may be down-loaded from Web site
https://pgvcl.nprocure.com (For view, download and on line submission) and
PGVCL web site www.pgvcl.com (For view & down load only).
The bidder has to follow instruction given in this tender documents as well as the
documents submitted for vendor registration
Price bids to be submitted ON LINE only before time limit specified in
“Tender Details” as mentioned in this document.
15. REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions, schedules and
other details called for in this specification and keep himself fully informed about all
which may, in any way, affect the work, or cost thereof. The bidder should sign on
each page of tender documents , as mentioned in Section 1 point no. 2.15, filure to
furnish the required information or submission of tender not as per the specification
will be at the Bidders risk may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this tender.
15.3 If any bidders firm or/and partner or proprietary firm anywhere in companies (PGVCL,
UGVCL, MGVCL, GETCO, DGVCL, GSEC) under GUVNL are under criminal
investigation for any kind of fraud for public and theft of material or/and with handlings
the material and any civil and/or criminal case pending at any stage than offer of such
bidder /firm will be out rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids as set out in the
Table no1, shall be rejected.
15.5 Any deviation found in Data/Details/Documents between online offer (e-tendering) and
physically submitted documents of bidder, offer of the same shall be liable for rejection
at the discretion of PGVCL.
15.6 Conditional bids shall not be accepted.
Sign & Stamp of the Bidder P a g e 1 |
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall be
accompanied by its translation in English. Failure to comply with this may disqualify a bid.
In the event of any discrepancy in meaning, the English language copy of all documents
17. SIGNATURE OF BIDDER
The bid must Bidders willing to participate in tender should have valid digital
certificate/Digital Signature as per Information technology Act 2000 using which they can
sign their electronic bids. Bidders can also procure the same from (n)code solutions, a
division of GNFC Ltd., who are licensed certifying authority by Govt. of India.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for opening of the
20. EVALUATION AND COMPARISION OF TENDERS
Generally the qualifying price bids, Bid price shall mean the bid price quoted by each bidder
in his bid for the complete scope of works including all duties and Taxes will be evaluated
by the PGVCL to ascertain the best and lowest evaluated bid in the interest of the PGVCL,
for the complete works covered under these specifications and documents.
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will prevail. If
there is discrepancy between the unit price and the total price which is obtained by
multiplying the unit price and quantity, or between sub-total and the total price, the unit or
sub-total price shall prevail, and the total price shall be corrected. In case of discrepancy
between sub-total price obtained by adding various prices in the schedule and the sub-
total price indicated for that particular schedule, the sub-total obtained by addition of
various arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of the prices
arrived at from various schedules, identified for that purposes, in the bid proposal sheets.
If the bidder does not accept the correction of the errors as above, his bid will be rejected.
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the successful bidder by
22.2 The contract will be awarded to the best qualified and responsive bidder offering the
lowest evaluated bid in conformity with requirements of these specifications and
documents and PGVCL shall be the sole judge in this regard and subject to the
provisions of these instructions to bidders and other terms and conditions detailed
out in these documents and specifications. A responsive bid is one which accepts all
terms and conditions of these specifications and documents without any
22.3 PGVCL Reserves the right to award separate contract to two or more parties in line
with the terms and conditions specified in the specification.
23. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this Tender
consist 365 Days. The commencement date of Order shall be Date of issue of the Order.
You shall have to complete the work as per the given time limit in sub order and if any
work order/sub work order is delayed beyond 120 days from the eligible time limit
mentioned. If you are failed to complete the work in this time period then you/firm is not
eligible for further orders till all allotted works are finalized.
Sign & Stamp of the Bidder P a g e 1 |
The time will be extended as per provision laid dawn in Delegation of Powers(Committee
level) Clause no 5.0 Power relating to Contractors and sub clause no 5.5 B as
“Extension of time limit for works contract if applied be forever after the expiry of contract
period with penalty”
24. Conflict of Interest among Bidders/Agents:-
A bidder shall not have conflict of interest with other bidders for particular quoted item.
Such conflict of interest can lead to anti-competitive practices to the detriment of
Procuring Entity’s interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item if:
a) They have proprietor/partner(s)/Director(s)in common ;or
b) They receive or have received any director in direct subsidy/financial stake from
any of them ;or
c) they have the same legal representative/ agent for purposes of this bid ;or
d) they have relationship with each other, directly or through common third parties,
that puts them in a position to have access to information about or influence on
the bid of another bidder ;or
e) Bidder participates in more than one bid in this bidding process. Participation by
a bidder in more than one Bid will result in the disqualification of all bids in which
the parties are involved. However, this does not limit the inclusion of the
components/ sub-assembly/ assemblies from one bidding manufacturer in more
f) In cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers ,one agent can not represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorise only
one agent/dealer.
There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of
the design or technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing
units, or more than one unit having common business ownership/management,
only one unit should quote. Similar restrictions would apply to closely related
sister companies.
Bidders must proactively declare such sister/common business/management
units in same/similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition act,
as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration, that
bidder shall not have conflict of interest with other bidders for particular quoted
item, as above.
Sign & Stamp of the Bidder P a g e 1 |
25. The Warrantee period
(1) If during one year following the work completion any maintenance is felt necessary,
for example straitening of pole, cross arms, Conductor stringing, Tightening of Guy
etc. Then such work will have to done by the bidder free of cost.
(2) If there is any new material required for maintenance during this warrantee period
i.e. one year time period, such requirement will have to be approved by The
Executive Engineer of concerned division. Quarterly report of such material issued
(vendor wise) will have to be shared with circle office by division office.
Sign & Stamp of the Bidder P a g e 1 |
SECTION II Schedule A:
1. For Underground Cable
1. Bidder has to maintain the records of allotted Cable Drum with actual Cable/Conductor
length. Cable length must be measured before laying. Cable joints are to be done as per
requirement only and length of cable must be utilized accordingly.
2. Cable is to be laid in Trench as per instructions of Engineer-in-Charge.
3. The trench excavation and filling–in shall be so executed that all walls, roads, sewers,
drains, pipes, cables, structures, places and things shall be reasonably secured against
risk of injury and shall be carried out to the satisfaction of the authorities concerned.
However, if any, damages to existing services made, Contractor shall arrange and pay for
any necessary repair, to make good the damages.
4. When the excavation of the trenches has been accurately executed, the contractor shall
inform engineer in-charge for approval. Lying of cables shall not be started until engineer
in-charge approves the trench.
5. All the related material for laying the cable in trench i.e. Half round RCC Pipes having
_both sides smooth surfaces, 25.4 mm thick , 152.4 mm inner diameter, 1000 mm long
and well cured and good quality;Sand from river bed, HDPE Pipes, GI Pipes and sundries
material if any (As per Schedule B) are to be supplied by Bidder at his own Cost. All such
material must be approved from concerned Engineer-in-charge before utilization and it
must be ISI marked where ever applicable.
6. Cable laying work must be executed as per prescribed in Schedule B. sand filling in
Trench must be done as mentioned in Schedule B. Megger test of Cable must be taken in
presence of Engineer-in-charge before laying and Bidder has to maintain separate
Records duly signed by Engineer-in-Charge for each results. After laying the Cable in
trench it is to be covered with half round pipe of RCC as prescribed in Schedule B and
approved sample. Each Half round Pipe must be marked with “PGVCL” with solid Red
7. Proper methodology of laying is to be adopted by the Bidder. Bidder has to lay Cable in
the stretch on small pulleys kept in the Trench so that it can be prevented from any
scratches on Cable. Drum must be fixed on Drum Machine while stretching and to be kept
on one end of Trench for smooth laying.
8. After completion of laying as above, remaining trench must be filled with sand. Leveling
with Road is to be done after complete sand filling. No any stones or any other debris are
to be utilized in filling of Trench. The contractor shall dispose of surplus material at his
9. A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall also be
laid. The warning tape shall be printed in RED letter (IN ENGLISH AS WELL AS
GUJARATI) as “CAUTION: 11000 VOLTS PGVCL CABLE” and to be placed at about
300 mm To 450 mm depth from ground level along the route of cable.
10. Trench route is to be made as per instructions of concerned Engineer-in-Charge and then
laying of cable in this trench accordingly.
11. Cable Laying with Mechanical Boring across the Road without disturbing the asphalt is to
be done instructions of concerned Engineer-in-Charge with prior approval and work is to
be executed as per Specifications in Schedule B only.
12. For Cable kit Make (Brand) Bidder has to submit any NABL accredited Lab Type test
certificate not older than Seven years and as per relevant IS 13573:2011 with latest
amendment if any along with sample before installation of cable kit at concern Division
office. GTP is to be submitted with Technical Bid.
Sign & Stamp of the Bidder P a g e 1 |
13. If any Hard Rock area is encountered during the digging of Trench, Bidder must have all
the modernized equipment i.e. Erath Cracker JCB etc. to execute the required Trench.
Such area must be certified by a formation of Committee at Division Level headed by
Executive Engineer and to be executed in presence of Engineer-in Charge.
IS 1255-1983 is to be followed for the depth of trench in such area.
14. Route Markers are to be installed at every 100 Meters length as per specifications in
Schedule B The marker should incorporate the following relevant information:
1) The name of the Company – PGVCL.
2) Voltage – 11 KV Cable
3) Distance of cable from the marker
The interval should be maximum 50/100 meters (As per EIC instructions and
requirements) between two markers. It shall also be put at bends, curves, road crossing,
Cable Joints etc. of cable route as per requirement over and above specified distance.
15. Empty Drums are to be credited at PGVCL respective stores at Bidders cost and Risk
after successful completion and Execution of work. Otherwise Recovery will be proposed
as per Section V Clause No.
16. After Laying of Cable in Trench and filling of all type Cable Box and Joints, testing must
be carried out with help of Voltage Surge Testing Kit as per IE Act by applying 22 KV for
continuous Five Minutes and Cable must hold the satisfactory Results. Bidder must have
such testing facility. Following Pre commissioned Tests are also to be carried out.
a) Insulation Resistance of each cable drum length after laying and before jointing.
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
c) After laying each cable with end termination shall withstand a voltage of 10 KV DC for one
minute between each phase to phase & phase to cable earth.
d) Test for 5 min. with system voltage applied between the conductor and the screen.
e) Continuity & Phase confirmation
17. During the Execution if any deficit found in allotted material OR in case of any theft of
PGVCL allotted material, then PGVCL will recover the cost of such material from Bidder
as per the prevailing Market Rates.
18. No any Advance Payment will be made after issuing of Order.
19. PGVCL will be not responsible and liable for the material supplied by the Bidder.
20. During Execution of work for Trench and Cable Laying authorized representative of
Bidder who is in knowledge of Engineer-in-Charge must remain present.
21. Bidder must have to submit the List of all related Equipment and Testing facility
necessary for the Tendered work while quoting the Bid.
22. PGVCL reserves the right to change/modify/alter/addition in condition in case of any
dispute and holds the power to decide the final verdict.
23. GST as per prevailing rates are applicable to Bidder for this work.
24. In case of any Disputes, Superintending Engineer of Concerned area is the final Authority
to take any Decision.
25. Work may be required to be executed in any 66/132/220KV Sub-Stations also.
26. Necessary shutdown for connection/jumper of UG cable with existing network will be
provided as per availability or convenience of the PGVCL which shall be acceptable to the
contractor & contractor shall try to complete the work in minimum time.
27. All the sundries material like Clamps, Screws, nuts, bolts, nails etc. is at Contractor’s cost.
28. Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15 and
PGVCL/Tech/UG cable/02/14-15 are attached in Section XI.
29. Before initiating any type of digging activity, prior intimation through “Call Before u
Dig”(CBuD)app is mandatory.
Sign & Stamp of the Bidder P a g e 1 |
2. For Overhead Line
1. Bidder has to maintain the records of allotted Conductor Drum with actual Conductor
length. Conductor length must be measured before Stringing.
2. For erecting poles the pits should be digging by using Pole Erecting Devise (PED
Machine). Where ever it is not possible to use the PED machine in the area lick
hard rock, small streets etc. the permission ofthe engineer in charge shall be
obtained for digging of pits as per the conventional method.
3. Stringing, installation of Fabrication, switches, distribution boxes, must be done as per
standards and esthetically.
4. Earthing of Poles and Transformers must be as per Drawings and RE Standards. The
Coal and Salt composition must be followed as per rules. The Earth Pit must be kept at a
distance mentioned in Standard form the Pole. Earth Pit must be as per Drawing.
5. Concreting of Poles/Guys are to be carried out as per site situation and as per
instructions of Engineer –In-Charge.
6. Construction of Transformer Structure must be as per standard with all required
accessories like LA, Box and Fuse etc.
7. Delta Type Three Earthing are compulsory for each Transformer Centre.
8. All the jumpers at Shackle Points/DP Structures must be of “D” Type only.
9. Wherever required, Guarding as per standard must be done.
10. Pole Concreting: Whenever concreting of poles (PSC/RSJ) required, subdivision officers
has to submit the proposal to the division office with all justification before
commencement of work. Committee of Executive Engineer, DE Tech of Division office
has to verify the submitted proposal and decide whether concreting is required or not.
After the approval of committee work of concreting should be process as per specification
attached herewith.
11. Bidder must have records of each work carried out with every material inventory and
account thereof issued to him.
12. Bidder must have the well-drawn sketch of each work and to be submitted with Inventory
sheet within 15 Days of work completion.
13. All the fabricated material and Girder Poles must be painted with Coats of Silver Oxide
and without this work, work completion will not be accepted.
14. Pole Numbering must be completed within week time as per Engineer-in-Charge
15. Bidder must have proper pole accounting for the work carried out by him. He must have
the location details from where the poles are lifted and where these poles are utilized for
each work. A separate Register is to be maintained by him and details are required to be
submitted with Inventory and Sketch submission.
16. Necessary shutdown for connection/jumper of newly erected line with existing network will
be provided as per availability or convenience of the PGVCL which shall be acceptable to
the contractor & contractor shall try to complete the work in minimum time.
17. Successful Bidder must have ensured for that the safety Gadgets are issued to his
Labour, by him, and required regulations of Safety will be followed while carrying out the
line erection work.
18. The Work for the erection of Poles, Guys, Earthing, Transformer and Concreting,
Stringing and Guarding must be done as per attached Specifications and Drawings.
19. The material which is dismantled from site during the execution of work must be credited
to respective Divisional stores immediately after completion of work with complete
inventory and measurement details and length to weigh conversion calculations.
Sign & Stamp of the Bidder P a g e 1 |
20. Any violation of Electricity Act 2003 Section No. 136 & 137, necessary action will be
initiated against the Contractor
21. In case of any Disputes, Superintending Engineer of Concerned area is the final Authority
to take any Decision.
Sign & Stamp of the Bidder P a g e 1 |
General Instructions to the successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful Bidders
indicating the quantity allocated to them and the security deposit amount to be deposited by
them with PGVCL. Short listed Bidders will be required to deposit the requisite security
deposit within 15 days from issuance of LOI/LOA
2. Security Deposit:
2.1 Security deposit will be accepted by RTGS/NEFT to the details of bank account is SBI,
IFSC code; -SBIN0060070 and name of account holder Paschim Gujarat Vij Company
Limited or Bank Guarantee(BG) from Nationalized /Scheduled Banks as per Govt. GR
No. EMD /10/2014/570/ DMO dated 01.04.15 will be acceptable.
2.2 The successful Bidders will be required to deposit the requisite security deposit within
15 days from the date of issuance of LOI / LOA of an amount equivalent to 5 % of the
value of the work to be allotted to him and as mentioned in LOI / LOA.
2.3 In case, if the Bank Guarantee is furnished / submitted, it should have a Clear one time
validity till the completion of awarded work of this work order. Bank Guarantee for
interim period will not be allowed. Security Deposit shall be suitably extended time to
time as per requirement.
2.4 If by any reasons the completion period of this work order is extended, then supplier
should undertake to renew the Bank Guarantee at least one month before the expiry of
the validity failing which PGVCL will be at liberty to encase the same. CORPORATE
GUARANTEES NOT ALLOWED.
2.5 No interest will be paid on the Security Deposit.
2.6 In the event of awarding the order of additional quantity, the successful Bidders will be
required to deposit additional Security Deposit on prorate basis within two weeks of the
issuance of LOA /LOI for the additional order quantity.
2.7 In the event of failure to carry out work offered by successful Bidders and as accepted
by them while receiving the order within given time period, will lead to forfeiture of the
Security Deposit up to 100% and will lead to disqualification of the bidder to transaction
business with PGVCL for at least TWO years or the time duration as may be decided by
the Managing Director, PGVCL.
2.8 Security deposit will be returned on after completion of awarded work.
2.9 If the successful Bidders fails to pay security deposit within given time limit then the
letter of intent will stand cancelled. EMD amount will be forfeited in favour of PGVCL
without any notice or and action for “Stop deal” will be initiated as decided by tender
inviting authority.
3. SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the receipt of
LOI/LOA,on Stamp Paper of Rs 300/-as per Company’s rules in the prescribed form of the
P.G.V.C.L. attached with this Tender. The cost Rs.300.00 of the Stamp Paper will have to
be borne by the successful Bidders.
4. For the Tendered work, other than turnkey work, entire material will be issued by PGVCL.
Any other related material required to carry out work mentioned in Schedule A is to be
brought by Bidder. No any extra cost will be paid towards such material.
5. Successful Bidder has to follow all the rules and Regulations of Work Safety. Required
tools and Tackles for Safety are to be arranged by Bidder only.
Sign & Stamp of the Bidder P a g e 1 |
6. Bidder is responsible to any type theft/damages of Company’s material and also
responsible to any type damages to any property and any kind fatal/non-fatal accidents to
anybody during the execution of work. Insurance of all workers is compulsory, who are
involved in Execution of Tendered work. There will be no any financial liabilities of PGVCL
for damage charges paid such way. Copy of valid Labour Insurance Policy in the name of
bidder is to be submitted with Tender Documents.
7. Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
8. Work must be completed in in specified Schedule narrated in the Tender. If concerned
Engineer not satisfied with quality of work, no any Time limit extension will be granted and
Penalty with applicable GST and other taxes in force at that time will be levied on delayed
portion of work.
9. Agreement must be executed within 15 (Fifteen) Days from the date of issue of LOA.
Security Deposit (In form of DD/BG) and Insurance Policy is also to be submitted with
Agreement within this time limit i.e. 15 (Fifteen) Days.
10. Remaining material is to be credited at Respective Stores of PGVCL within a month after
completion of work.
11. Agreement and Indemnity Bond is to be executed on Rs. 100/- Stamp Paper and cost of
stamp paper is to be borne by Bidder. Solvency Certificate is to be submitted as per
PGVCL rules and Tender Condition.
12. Bidder is solely responsible for the material supplied by PGVCL.
13. Coal and Salt are to be brought by Bidder at his own expenses, for earthig work, and work
to be done as per PGVCL rules and RE specification for this work.
14. Work is to be carried out in presence of PGVCL authorized representative and to be duly
certified also.
15. No idle labour charges will be paid by the PGVCL in case such occasion of idle labour
arises, due to want of any materials or any other situations.
16. PGVCL have full rights to accept or reject the offer received against the Tender.
Sign & Stamp of the Bidder P a g e 1 |
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in force in
India, including any such laws passed or made or coming into force during the period of the
2. Wages to be paid at the time of payment etc.by the contractor
2.1The successful bidder shall pay minimum prevailing rates per day, as may be specified
here after, or rates fixed under the Minimum Wages Act, whichever is higher. The wages
of every contract labour employed by him under this contract shall be paid by him before
the expiry of 7th day of the month irrespective of which the wages are payable i.e. wages
of a last month have to be paid by him in the first week of the next month). The
contractor shall have to make wages to his workers through bank only. The agency shall
have to submit the copy of a letter given to the Bank advising for crediting wages in
individual account of the workmen along with photocopy of the cheque showing total
payment to be made to all such workmen whose accounts are operated in that branch. (If
there is more than one Branch, the agency will have to submit separately for each
2.2The successful bidder shall give his telephone number and address to the company so
that in case of labour trouble etc. the contractor can be contacted. The contractor shall
arrange to have his office outside the factory premises and the contractor shall keep
himself present through the work hours.
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to 6.00 am.
5. Identity cards as prescribed under the factories Act/Shops and establishment Act (As the
case may be applicable) with Photo affixed thereto, for identification.
6. The successful bidder shall maintain a valid Labour license under the contract labour
(regulation and abolition) Act for employing necessary manpower required by them. In
absence of such license, the contract shall be liable to be terminated without assigning any
reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws and keep the
PGVCL indemnified in respect thereof. Some of the major liabilities under various labour
and industrial laws which the Contractor shall comply with below conditions.
7.1. Payment of contribution by way of employer's contribution towards provident fund,
administrative charges etc. at the rates made applicable from time to time by the
Government of India / Government of Gujarat or other statutory authority.
7.2. Payment of deposit in respect of each contract labour at the prevailing rate with the office
of the commissioner of labour as per the Contract Labour (Regulation and abolition) Act.
7.3. License fee as prescribed under the contract labour (Regulation and abolition) Act rules
framed there under depending upon the number of workmen.
7.4. Paid leave facility and wages as per the provision of the Factories Act at the rate of one
day for every 20 days of working.
7.5. Payment of retrenchment compensation, Notice pay and other liabilities as per industrial
Dispute Act. Any payment to the Contractor's employee arising out of any claim of
disputes under the Industrial Dispute Act 1947 or any other labour Laws.
7.6. Payment of compensation in case of accidental death or injury as per Employee's
compensation Act.
7.7. Maternity leave as per the provisions of the Maternity Benefit Act.
7.8. In case, PGVCL becomes liable to pay any wages or dues to any manpower deployed or
any government Contractor under any of the provisions of the Minimum wages act,
Payments of wages Act, Employee's compensation Act, Contract Labour regulation
abolition Act, Employee provident fund or any other law due to act of omission of the
Contractor, the PGVCL may make such payment and shall recover the same from the
successful bidder's Bill.
Sign & Stamp of the Bidder P a g e 1 |
7.9. If the PGVCL is caused to pay under any law as a principal employer such amount as
may be necessary to cause of observe, or for non-observance of the provisions
stipulated in the notifications/byelaws/Acts/Rules/Regulations/ including amendments. If
any, on the part of the Contractor, the PGVCL shall have the right to deduct any money
due to the successful bidder under this contract or any other contract with the PGVCL
including his amount of security deposit for adjusting the payment. The PGVCL shall also
have right to recover from the Contractor any sum required or estimated to be required
for making good the loss or damage suffered by the PGVCL.
8. Employee's compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's compensation fund
and under the liabilities insurance. The Contractor will arrange insurance policies for
arranging payment to his staff injured / met with accident (Fatal / nonfatal) on duty of
sufficient amount as per Labour laws. In case of any such happening Contractor will be
liable for any other payment to workers / staff engaged as per existing rules. Contractor will
not make any such payment to the Contractor's staff or any compensation etc. during the
pendency of the contract.
9. Following Salient features of some major laws are applicable to establishments engaged.
9.1. Employee PF and Misc. Provision Act
9.2. Payment of Gratuity Act
9.3. Maternity Benefit Act
9.4. Equal Remuneration Act
9.5. Payment of Bonus Act
9.6. Industrial Dispute Act
9.7. Industrial Employment (Standing orders) Act
9.8. Trade Union Act
9.9. Employees compensation Act
9.10.Contract Labour (Regulation and abolition) Act
9.11.Child Labour (Prohibition and regulation) Act
9.12.Inter-state migrant workmen's (Regulation of Employment and conditions of service )
9.13. Minimum wages Act
9.14. Payment of Wages Act
9.15.Factories Act
9.16.Shops and Est. Act
9.17. The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in addition to other liabilities
prescribed under the various labour laws, in force from time to time, from statutory
authorities like GOI-GOG, which the Contractor shall have to comply with.
10. It should be ensured that before commencing the said work, the successful bidder should
submit the details of their labourer such as a full name, address and age with proof and
subsequently changes of workers details are submitted accordingly.
11. The successful bidder shall employ adequate number of an experienced staff at site for
daily supervision and for maintenance of various register and records required under the
law and contract. No payment for supervision shall be admissible.
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act,
Workmen’s Compensation Act, Insurance Rules etc. or any other act, rules or regulations
that have to be observed by the contractor for carrying out the work.
13. The contract will be governed by the company as per works terms & conditions of the
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the work. No female worker
shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
Sign & Stamp of the Bidder P a g e 1 |
14.2 Contractor shall maintain a valid labour license under the Contract Labour (Regulation
and abolition) Act for employing necessary manpower required by him. In the absence of
such a license, the contract shall be liable to be terminated without assigning any reason
thereof. Contractor should also employ qualified and experiences persons as per
requirement of Electricity Act and rules for carrying out supply and erection work under
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or any Government
agency under any of the provisions of the Minimum Wages Act, Payment of Wages Act,
Employee Compensation Act, Contract Labour Regulation Abolition Act, Employee
Provident Fund or any other law due to act of omission of the Contractor, PGVCL may
make such payment and shall recover the same from the Contractor’s bills.
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect of
each concerned employee The contractor's contribution and the workers’ contribution
towards Provident Fund and Family Pension Scheme shall be done at the rate made
applicable by the Government from time to time and deposited by the contractor with
Regional Provident Fund Commissioner, Rajkot.
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees who are
members of the Provident Fund as the contribution to the Deposit Linked Insurance
Scheme with Regional Provident Fund Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be deposited by the
Contractor with Regional Provident Fund Commissioner, Rajkot at the rates applicable.
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labour shall be provided by the Contractor to his, workers. He shall maintain Leave
Records, Leave Cards for individual labourer which shall be duly verified, approved and
certified by the Authorized Officer of PGVCL. Remuneration for such leave period shall be
fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the performance
of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/ Workers as per
rates fixed under the Minimum Wages Act. The wages of every Contract Labour
employed by him under this contract shall also be paid by him before the expiry of
7th day from the last day of the month in respect of which the wages are payable
(i.e. wages of a month have to be paid by him in the first week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the Contractor shall
be punishable to the extent of Rs. 100/- for each day of default.
20.3 The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL, so
that, in case of labour trouble etc. the Contractor can be contacted. The Contractor
shall arrange to have his office within working area and the contractor keep himself
present throughout the working hours.
20.4 The separate P.F. code issued from RPFC is required to be taken by the contractor
and if it is not taken, offer of the firm will not be considered. The attested
documentary evidence to be submitted along with the offer.
20.5 The contractors who are having separate P.F. Code No. from RPFC, it should be
ensured that all the contract labourers are covered under the provident fund scheme
and employees’ pension scheme and their contributions are remitted regularly to the
concerned RPFC. The photo copies of the Chelan in this regard should be collected
from the concerned contractor and kept in the file of the concern contractor.
Sign & Stamp of the Bidder P a g e 1 |
21. CONTRACTOR TO INDEMNIFY THE COMPANY
The successful bidder shall indemnify the Company and every member officer and
employees of the Company, also engineer in charge and his staff against all actions,
proceedings, claims of demands, coasts and expenses, which may be made against the
Company or Government for or in respective of or performance of his obligation under the
contract documents the Company shall not liable for or in respective of or in consequence
of any accident or inquiry to any workman or other person in the employment of the
contractor or his sub-contractor and the contractor shall Indemnify and keep indemnified
the Company against all such damage and compensation and against all claims, demands,
proceedings costs, charges and expenses whatsoever in respective thereof in relation
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance Bidder’s attention is specifically invited to these clauses. Bid price
shall include all the costs in fulfilling all the insurance liabilities under the Contract.
The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and interests of
the PGVCL against all perils detailed herein. The form and the limit of such insurance as
defined herein together with the under-writer in each case shall be acceptable to the
PGVCL. However, irrespective of such acceptance, the responsibility to maintain adequate
insurance coverage at all time during the period of Contract shall be of Contractor alone.
The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall
be in the name of the Contractor. The Contractor shall, however, be authorized to deal
directly with Insurance Company or Companies and shall be responsible in regard to
maintenance of all insurance covers. Further the insurance should be in freely convertible
23. Any loss or damage to the equipment during handling, transportation, storage,
erection, putting in to satisfactory operation and all activities to be performed till the
successful completion of commissioning of the equipment shall be to the account of
the Contractor. The Contractor shall be responsible for preference of all claims and
make good the damages or loss by way of repairs and/or replacement of the
equipment, damaged or lost. The transfer of title shall not in any way relieve the
Contractor of the above responsibilities during the period of Contract. The
Contractor shall provide the PGVCL with copy of all insurance policies and
documents taken out by him in pursuance of the Contract. Such copies of
documents shall be submitted to the PGVCL immediately after such insurance
coverage. The Contractor shall also inform the PGVCL in writing at least sixty (60) days
in advance regarding the expiry/cancellation and/or change in any of such documents and
ensure revalidation, renewal etc., as may be necessary well in time.
24. The perils required to be covered under the insurance shall include, but not be limited to
fire and allied risks, miscellaneous accidents (erection risks) workman compensation risks,
loss or damage in transit, theft, pilferage, earth quake, riot and strikes and malicious
damages, civil commotion, weather conditions, accidents of all kinds, etc. The scope of
such insurance shall be adequate to cover the replacement/reinstatement cost of the
equipment for all risks up to and including delivery of goods and other costs till the
equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the
extent of insurance cover and the amount of claim available from the underwriters, the
Contractor shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per project requirements.
Sign & Stamp of the Bidder P a g e 1 |
25. All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the PGVCL may from
time to time, during the pendency of the Contract, ask the Contractor in writing to limit the
insurance coverage, risks and in such a case, the parties to the Contract will agree for a
mutual settlement, for reduction in Contract price to the extent of reduced premium amount.
The Contractor, while arranging the insurance shall ensure to obtain all discounts on
premium which may be available for higher volume or for reason of financing arrangement
of the project.
26. The clause entitled ‘Insurance’ covers the additional insurance requirements for the portion
of the works to be performed at the Site.
27. The successful bidder will not be allowed to work after working hours except in special
28. The successful bidder has to engage required strength of skilled persons for execution of
work and proper supervisor to avoid complication and unnecessary delay to complete work
timely. The successful bidder will be solely responsible for labour claims arising out of the
labour employed for this job.
29. The successful bidder should furnish details of past experience of such job of similar nature
completed by him satisfactorily within the time limit in PGVCL will be preferable.
30. The successful bidder will be abide by and fulfil all the terms and provisions of the “Tender
and contract” for works as applicable and in case of any default there to the PGVCL
Company shall forfeit the S.D. or any other action as may be decided by Executive
Engineer MORBI Division-1.
31. The successful bidder will certify that he has complied with the provisions of
Industrial & Labour Laws including PF Act, ESI Act etc. as may be applicable. Copy
of challans of PF related to be submitted along with bill.
32. The successful bidder will governed by the PGVCL general conditions of works contract.
The Booklet will be available in the concerned office in any working days. In the event of
placing order, the successful bidder will be bound to the terms & conditions of the booklet.
All the usual terms and conditions of the Company though the same might have not been
mentioned in this specification or contractor booklet will applicable to this contract, and the
decision of the Executive Engineer, MORBI Division shall be binding on the Contractor.
Sign & Stamp of the Bidder P a g e 1 |
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services. The amount and % of GST and Cess as applicable should
clearly be indicated separately. (GST/Cess means all applicable Tax/Cess under GST
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act,
CGST Act, UTGST Act and SGSCT Act, 2017 and all related ancillary legislations).
3. Contractor shall have to submit a C.A Certificate & duly authorized Signatory, certifying that you
have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not
claim any such Refund, on a future date, from the concerned Authorities and if, any Refund, in
respect of such GST and Cess, is claimed by you, it will be immediately passed on to the
COMPANY, without COMPANY making any specific Claim, for the same, either from the
Department or from you.
4. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST
and Cess is not mentioned clearly unless the bidder has opted for Composition Scheme under
GST Act, which should be clearly indicated in the price bid. COMPANY may at its discretion
consider such offer with presumption of highest applicable rate of VAT/GST/Cess prevailing
when the price quoted is inclusive of GST and Cess.
5. If the Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will have to
be borne by the tenderer. In no case additional amount towards tax or otherwise will be paid /
reimbursed to supplier/contractor. Further Statutory Variation clause will not be applicable in
case of Supplier / Contractor has opted for Composition Scheme under GST.
6. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability
of GST (later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code,
etc.) over and above as charged in the invoice shall be borne by the Supplier/Contractor.
However, any refund received by the supplier / contractor on account of GST charged from the
company; such refund shall have to be passed on to the company, along with interest if any.
Such refund along with interest needs to be passed on suo-moto by the contractor.
7. Further, the Company has a right to recover the amount of GST along with penal interest at the
rate of 15% per annum if GST charged is not paid/short paid to the government or fail to upload
the details or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within
the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
8. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of
any other additional item of their inputs / input services under the ambit of the Input Tax Credit
provisions under the GST Act, subsequent to the date of submission of the offer, the same
should be passed on to COMPANY and you should inform such changes to COMPANY from
time to time. PGVCL’s GST Registration No.is 24AADCP1453C1ZZ
Sign & Stamp of the Bidder P a g e 1 |
9. TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed against
the PGVCL or the Contractor in pursuance of the Contract. In addition the Contractor shall be
responsible for payment of all Indian duties, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
10. Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in accordance with the
provision of Income-Tax Laws and to that effect a certificate will be issued to the contractor,
however added as contractor has to submit separate invoice for supply parts item as well as
works part item separately, otherwise TDS will be deducted on entire invoice value.”
11. Applicable welfare cess will be deducted from contractors each bill by PGVCL to pay the same
to the respective Govt. Department. Tax will be deducted as per applicable statutory rules.
12. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST TDS, welfare
cess or any other taxes applicable time to time etc. All other statutory liabilities towards this
contract will be on your part.
13. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place within the
contract period will not be considered except GST. No statutory variation will be given for
this work except GST.
14. The Contractor shall be fully responsible for deducting the P.F. of the employees/labour
Working under him as per statutory regulations and depositing the same with the
concerned authorities.
15. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all losses,
expenses or claims arising in connection with the death of or injury to any person employed
of the Contractor or his subcontractors for the purposes of the Works.
Sign & Stamp of the Bidder P a g e 1 |
TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the papers,
drawings, etc. attached & if has any doubt as to the meaning of any portion of any
condition / specification, etc. he shall before signing the contract submit the particulars
thereof to PGVCL in order that such doubts are removed.
1.2 The successful bidder shall not, without the consent in writing of PGVCL, transfer,
assign or sublet the work under this contract or any substantial part thereof to any other
1.3 The execution of work should be commenced as per the instruction of the Engineer In
Charge as per actual requirement and should be completed within the time limit
1.4 PGVCL may at any time by notice in writing to the successful bidder either stop the work
altogether or reduce or cut it down. If the work is stopped altogether, the Bidder shall
only be paid for work done. If the work is cut down the Bidder shall not be paid for the
work as so cut down, but in neither case shall be paid any compensation what so ever
for the loss or profit which he might have made if he had been allowed to complete all
the work included in the contract.
1.5 Notices, Statements and other communications sent by PGVCL through registered post
or telegram or telex or any other way of communication to the successful bidder at his
specified address shall be deemed to have been delivered to the successful Bidder.
1.6 The work shall be carried out by the successful bidder with prior approval of PGVCL.
Work carried out without PGVCL’s approval shall not be accepted and the PGVCL shall
have right to reject it and to recover the cost from the successful bidder. He will be liable
against all losses, expenses or claims arising in connection with the death of or injury to
any person employed by the successful bidder or his subcontractors for the purposes of
1.7 The successful bidder shall be responsible for any damage to the equipment during
transit due to improper or inadequate packing, handling, loading and unloading. The
cases containing easily damageable material shall be very carefully handled. Adequate
protection must be provided for outdoor storage at site in tropical humid climate,
wherever necessary. The successful bidder without any extra cost shall supply any
material found short inside intact store area.
1.8 If the successful bidder neglects to execute the work with due diligence and expedition
or refuses or neglect to comply with any reasonable orders within two days’ notice given
in writing to the successful bidder and if he fails to comply with the notice, then in such a
case PGVCL shall be at liberty to get the work or any part of it, executed through any
other agency/Bidder in the manner and on the terms it thinks proper. If the cost of
executing the work as aforesaid shall exceed the balance due to the Bidder, and the
Bidder fails to make good the deficiency, PGVCL may recover it from the Bidder in any
1.9 PGVCL shall have at all reasonable time access to the works being carried out by the
Bidder under this contract and stores where material issued by PGVCL is stored. All the
works shall be carried out by the Bidder to the satisfaction of PGVCL.
Sign & Stamp of the Bidder P a g e 1 |
1.10 The quantities mentioned in the accompanying schedule B are only approximate same
may decrease or increase. The PGVCL reserves the right for revising or omitting any of
the quantities. The actual work executed by the successful bidder will be calculated at
the rate given in the contract schedule of the rates binding to the successful bidder.
1.11 No higher rate or revised rate will be application for the work, if work is held-up/closed
due to whatever so reasons.
1.12 Price shall not be changed subject to any upward/downward revision on any account
whatsoever through the period of contract.
1.13 All other general terms and conditions as prevailing in the PGVCL shall be applicable to
this work contract.
1.14 The successful bidder has to co-ordinate and co-operate fully with Engineer In Charge
and for execution of the works.
1.15 Either successful bidder or successful bidder’s authorized person should contact our
Engineer In Charge as well as Division Office, MORBI daily for the availability of
materials required for this work, failing to which this work order shall be terminated
without giving any notice.
1.16 The successful bidder has to maintain site register covering all aspects of material
received/utilized/dismantled for day to day work and has to obtain signature of Engineer
1.17 In case of any dispute doubt, the decision of Executive Engineer MORBI Division shall
be unchallengeable and final, which will be binding to the contractor.
1.18 Security Deposit (without any Interest) will be refunded after completion of guaranteed
1.19 All legal complication of disputes is subject to MORBI jurisdiction only.
1.20 A fresh and valid solvency certificate to the extent of 20% of the ordered value will have
to be produced by the contractor and party has to submit attested copy of solvency
certificate to the company before commencing of work.
1.21 The successful bidder will be solely responsible for any accident/damage either to
equipment or any human being during the time of execution of work.
1.22 Prior institution in writing for starting the job will be given by PGVCL for the work.
1.23 The successful bidder will have to make his own arrangement for required all kinds of
tools, tackles, required for the execution of work.
1.24 The cost of damages, if any will be recovered from the successful bidder’s bill. The
assessment of which will be done by Engineer In Charge in consultation with division
office, and his sole discretion and his decision shall be binding to the successful bidder
and shall be considered as final and unchallengeable.
1.25 The successful bidder will have to give indemnity bond to PGVCL against any possible
claim of compensation for damage to Contractor’s equipment or staff or any of third
parties during the execution of work as per attached format.
1.26 The successful bidder will have to complete entire work, as mentioned in Schedule-B of
contract awarded to him, as per directive and instruction of Engineer In Charge. If he
fails to do so entire work will be carried out at the risk and cost of Contractor.
1.27 The contractor must engage sufficient knowledgeable person round the clock,
exclusively for execution of work.
1.28 Specification in any items mentioned in tender are subject to change without any prior
notice and binding to the contractor.
1.29 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules of all
relevant Govt. Authorities from the bill.
Sign & Stamp of the Bidder P a g e 1 |
1.30 If the work is required to be carried out during fix outage then the successful bidder has
to deploy adequate man power, material, tools etc. well in advance and has to complete
the entire work during this specific outage period only, failing to which Company shall be
at liable to deduct the amount of revenue loss due to prolong outage.
1.31 The tender include all minor accessories and items of work which may not have been
specifically mentioned in the specification / Schedule etc. but are essential for
completion of work. The contractor will not be eligible for any extra payment in
respect of such minor accessories and item of work.
1.32 The successful bidder shall not refuse to execute the work order at any time and it will
be his sole responsibility to execute and complete this work as per the instruction of
Engineer In Charge.
1.33 For shortage of any materials issued by the PGVCL for the work, recovery shall be
made from you, on the basis of prices of the materials (prevailing on the date of
settlement of materials account) plus 15% supervision charges.
1.34 The successful bidder has to carry out all the works in accordance with revised and
latest provision under I.E. Rule Act made there under and as per instruction of Engineer
1.35 All the materials issued by PGVCL shall be transported to the work site on same day
and to be preserved in safe custody failing to which PGVCL shall initiate Police action.
Similarly as per instruction of Engineer In Charge, you have to credit the material at
PGVCL store without any loss of time failing to which PGVCL shall initiate Police action.
1.36 Any delay causing extension of outages shall be successful bidder’s responsibility and
appropriate amount (in term of Rupees) as decided by Executive Engineer, MORBI
Division shall be recovered from successful bidder’s bill as a penalty with applicable
1.37 No tools, tackles, manpower, crane facilities etc. will be provided by the PGVCL.
1.38 The contractor has to follow all labour laws, safety rules and regulations. The PGVCL
does not take any responsibility in case of accident or injury to the workers. The safety,
security of men, materials and equipment shall be sole responsibility of the contractor.
1.39 The compliances of all Central / State Govt. Rules, safety and insurance rules etc. and
that of local body is a must condition for the successful bidder.
1.40 The successful bidder shall specifically note that PGVCL will not pay any extra amount
towards any type of claim except for the description indicated in Schedule –A. The party
has to carry out all other additional required activities / work as directed by Engineer In
Charge which is not mentioned in Schedule but required to be completed as per the site
condition and for this work no extra payment shall be made by PGVCL.
1.41 The contractor should employ as a Supervisor with sufficient qualification and
experience who could supervise the execution of work throughout. He should always be
present on the site.
1.42 The contractor shall be responsible for breakages, losses and a theft of material during
transit or erection after the materials issued from the stores till the completion of work
and is taken over by the PGVCL.
1.43 As regard damages to the materials, equipment, successful bidder himself will be
responsible. If there is any compensation to be paid in respect of “WORKMAN”
Compensation Act or any other statutory provisions, the same will be paid by contractor
directly. If he thinks fit, he may take necessary insurance covering at his cost.
1.44 The successful bidder shall co-operate with the PGVCL for taking measurement etc. as
early as possible and he shall fulfil the entire requirement which is necessary to finalize
Sign & Stamp of the Bidder P a g e 1 |
1.45 The competent authority can delete any item in schedule of the tender if he feels that the
rate quoted by the contractor for the item is abnormally high when compared to the
estimated rates.
1.46 The successful bidder shall not refuse to execute this work order at any time and it will
be his sole responsibility to execute and complete this work as per the instruction of
Engineer In Charge.
1.47 The erection work should be carried out according to the specification as per instructions
and programmed laid out by the Engineer in charge. Contractor has to ensure safe
shifting and erection of all accessories/equipment as per standard norms.
1.48 The Bidder shall not display the photograph of the work and shall not take advantage
through publicity of the work without written permission of PGVCL.
1.49 The inspection as mentioned in above clause No. 6 of this section by PGVCL’s
representative shall not relieve the successful bidder from full responsibility of
completing the work confirming to the requirement of this contract.
1.50 Under the Contract, the Contractor shall be responsible for loss or damage to the line
and Electrical Equipment until the successful completion as defined elsewhere in the Bid
1.51 All demurrage, wharf age and other expenses incurred due to delayed clearance of the
material or any other reason shall be to the account of the Contractor.
1.52 The law applicable to the contract shall be the laws in force in India. The courts of Rajkot
shall have exclusive jurisdiction in all matters arising under the contract.
2. PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted firm price
basis (Inclusive of all Taxes) and lowest evaluated bid in the interest of the PGVCL, for the
complete works covered under these specifications and documents.
If more than one party is to be considered for placement of order, they will have to match
their end cost with end cost of L-1 technically acceptable bidder. PGVCL (tender Inviting
Authority) may go to the L-2, L-3 and so on depending upon the requirement. If PGVCL
(tender Inviting Authority) feels that there is lack of serious competition or any other
reasons, PGVCL (tender Inviting Authority) may negotiate with the L-1 party. PGVCL’s
(tender Inviting Authority) decision shall be final and binding on all the parties.
3. QUANTITY DISTRIBUTION
3.1 For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular who have
confirmed /fulfilled pre eligibility criteria , as mentioned in Section 1 sr No 2 , will only be
considered for price evaluation. PGVCL will not consider the price bid of any contractor
who does not confirm / fulfil the eligibility criteria as mentioned in Section 1 sr No
While placing the order, the quantity distribution to each new contractors / new firms
shall be restricted up to 30 % of the tender amount/Qty. for all such new bidders
provided the price of New contractor is lower than the regular/experienced contractor.
New contractor / new firm will be considered as a regular contractor only after full filing
experience criteria as mentioned in Bidders qualifying criteria as per point no. 2 in
The new contractor will be asked to match the L-1 prices of the new contractor only and
the Regular contractor has to match the L-1 price of the Regular/experienced contractor
But if there are no Regular contractor OR if the rate of Regular contractor is very high,
the above condition no. 2.11 shall be suitably relaxed by PGVCL. L-1 regular contractor
however will get heavy weight age in order placement.
Sign & Stamp of the Bidder P a g e 1 |
3.2 For lying of Under Ground Cable work:
While placing the order, the quantity distribution to each new contractors / new firms,
Section 1 sr No 2, shall be restricted up to 10 % of the tender amount/Qty. for all such new
bidders provided the price of New contractor is lower than the regular/experienced
contractor. New contractor / new firm will be considered as a regular contractor only after
full filing experience criteria as mentioned in Bidders qualifying criteria as per point no. 2 in
The new contractor will be asked to match the L-1 prices of the new contractor only and
the Regular contractor has to match the L-1 price of the Regular/experienced contractor
But if there are no Regular contractor OR if the rate of Regular contractor is very high, the
above condition no. 2.21 shall be suitably relaxed by PGVCL. L-1 regular contractor
however will get heavy weight age in order placement. The Contractors who have
confirmed /fulfilled pre eligibility criteria will only be considered for price evaluation.
PGVCL will not consider the price bid of any contractor who does not confirm / fulfil the
eligibility criteria. L-1 regular contractor however will get heavy weight age in order
4. IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each
concerned Divisions under above locations. The planning for each location has to be
prepared in consultation of the Deputy Engineer of the concerned Sub Division under
whose control the work is allocated. The work must be carried out under Supervision of
concerned S/dn Head or Authorized Staff appointed by SDO.
5. ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be allotted from any store Centres of
PGVCL jurisdiction and successful bidder has to take delivery from these stores at his own
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued
Fourth Sub Work Order only after the submission of Inventory sheet with sketch and
material account statement for any of the three previously issued Sub Work Orders.
7. TAKING DELIVERY AND INSURANCE:
7.1 The contractor has to keep all materials in safe custody and transport to the respective
sites and will be fully responsible for any damage to or loss of all materials at any
stage during transportation or erection till taking over by PGVCL
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe
custody of all the stored materials at his own cost. Material which is to be allotted by
PGVCL is to be carted, loaded and unloaded at Bidder’s cost and risk from PGVCL’s
respective Stores. PGVCL must have access to such Store/s at any time of Day
thought the contractual period and Contractor will cooperate for verification of such
store/s and Inventory accounting. Failing to which actions may be initiated after
issuance of required Notice to the Contractor. Store address/s is to be mentioned in
the “General information about the Bidder” under Section I of this Tender.
7.3 The Contractor shall have total responsibility for the entire materials stored, loose,
semi assembled and/or erected by him at site in his custody. The Contractor shall
make suitable security arrangements at his own cost to ensure the protection of all
materials, equipment and works from theft, fire pilferage and any other damages and
loss. It shall be the responsibility of the contractor to arrange for security till the works
are finally taken over by the PGVCL
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to
the extent of 100 % cost of materials, which are required to complete the work.
Contractor shall have to take comprehensive insurance policy equivalent to the Order
Value against any loss, damage, theft, pilferage, fire etc. for the complete period of
Sign & Stamp of the Bidder P a g e 1 |
storage, erection and commissioning up to the time of taking over by PGVCL. The
Contractor shall deal directly and pursue the claim with the Insurance Company and
shall be responsible in regard to maintenance of all insurance coverage as well as for
settlement of claim. The proof of insurance policy taken by the successful Contractor
shall be furnished to Engineer-In-Charge. In absence of the above insurance policy,
R.A. Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be
responsible to lodge, pursue and settle all the claims with the Insurance Company for
all items, materials and the PGVCL shall be kept informed about it. Contractor shall
replace the lost / damaged materials / items promptly irrespective of the settlement of
the claims by underwriter and ensure that the work progress is as per agreed
schedule. The loss, if any, such replacement will have to be borne by the Contractor
and PGVCL will not entertain any claim / representation in this regard. However it will
be contractor's responsibility to insure the entire project is taken over by the PGVCL.
8. Account of material issued
8.1 The successful bidder shall have to maintain accurate day to day item wise account of
use of issued materials which shall be got checked from time to time by the Engineer In
Charge of the Company. The contractor will be responsible for custody and preserving
the issued materials till the work is hand over by the contractor after completion.
8.2 The successful bidder has to maintain site register, covering all the daily details of
material receipt and utilization, progress of work etc. This register shall be checked and
signed by Engineer In Charge/Deputy /Executive Engineer, MORBI Sdn/Division during
the site visit as per requirement and exigency of work if deem fit.
8.3 Material of one work should not be used in another work, except only in
exceptional circumstances with the approval of concern Executive Engineer of
respective division office.
8.4 After completion of the work against each Sub Work Order, all the surplus materials
issued by the PGVCL shall be returned by you to the respective divisional /Regional
stores only at contractor’s cost. Do not credit this material in S/Dn store.
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to complete the
ordered work within 365 Days from the Date of issue of Work Order.
9.2 Time limit of Each sub work order should not be maximum up to 60 Days.
9.3 You shall have to complete the work as per the given time limit in sub order and if any
work order/sub work order is delayed beyond 120 days from the eligible time limit
mentioned. If you are failed to complete the work in this time period then you/firm is not
eligible for further orders till all allotted works are finalized.The time will be extended as
per provision laid dawn in Delegation of Powers(Committee level) Clause no
Power relating to Contractors and subclause no 5.5 B as “Extension of time limit for
works contract if applied before or after the expiry of contract period with penalty”
9.4 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either due to
heavy rains or other reasonable causes, such facts should be immediately brought to
notice of the Engineer In Charge. If the reasons for stopping the work are genuine the
Engineer In Charge may ask the successful bidder to start the work again as per
condition. The period of such stoppage will not be considered as a part of working days
moreover the successful bidder cannot claim compensation for such stoppage.
9.5 PROGRESS OF WORK
Sign & Stamp of the Bidder P a g e 1 |
You will have to submit fortnightly progress report regularly in duplicate to Engineer In
Charge and Executive Engineer MORBI. If found that the work is unsatisfactory or not
progressing as per schedule then any action would be taken by the PGVCL as may
deemed fit to see that work is completed at the risk and cost of contractor.
The completion time allowed for each Sub work Order shall be strictly observed.
10. Time limit extension will be given, as per Clause No. 12of this section, if material is
not supplied in time and in any case of objection not cleared in time. But if materials
given in time and there is no any objection, then no time limit extension will be
granted and penalty with applicable GST will be imposed as per rules.
11. CHANGE OF QUANTITY
11.1 During the execution of the Contract, the PGVCL reserves the right to increase or
decrease the quantities of items under the Contract but without any change in unit
price or other terms & conditions. Such variations unless otherwise specified in the
accompanying GCC and/or Technical Specifications, shall not be subjected to any
limitation for the individual items but the total variations in all such items under the
Contract shall be limited to the extent of 30% (Thirty Percept) of the contract price by
way of suitable amendment to the contract.
11.2 The Contract price shall accordingly be adjusted based on the unit rates available in
the Contract for the change in quantities as above. The base unit rates, as identified
in the Contract shall however remain constant during the currency of the Contract, In
case the unit rates are not available for the change in quantity, the same shall be
subjected to mutual agreement.
11.3 As this is an EPC contract, engineering work will be done by the Contractor.
Responsibility of material will be that of the contractor.
12. Penalty with GST:
12.1 Penalty with GST is levied on thetime limit of Sub Work Orders. If the work is not
completed within the scheduled period as prescribed in Sub Work Order, penalty +
GST at the rate of 0.5 % per week or part thereof on delayed portion subject to
maximum up to 10 % of the sub work order Valuewith GST as per applicable rate.
This will be deducted from the bills payable either against this contract or any bank
guarantee or any other amount payable under any other contract with the PGVCL. For
Penalty calculations or Time limit Extension, following points are to be observed.
12.2 Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on which
the first material is issued against the Sub Work Order.
12.3 If material is not available in respective stores then “NO STOCK” stamping by Store
In-charge/Store Keeper must be taken against the particular item by the contractor.
12.4 In Case of non-availability of Material, contractor must visit the respective store every
fortnight and no stock material details are to be submitted to respective Executive
Engineer and concerned SDO.
12.5 TLE of Sub work order can be granted on the basis of above such documents
produced by Contractor.
12.6 Time limit Extension must be given as per F &A Letter No. PGVCL/F&A/5083/14-06-
12.7 At the time of submission of Bill against SWO, all such Documents are to be submitted
by contractor for waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
Sign & Stamp of the Bidder P a g e 1 |
13. During the execution of Work, if Contractor/Labour are found violating OR Braking the
Safety rules and Regulations, then Engineer-in-Charge will serve the warning Notice on
first Instance. On second Instance the amount of Fine will be Rs. 500.00 or 0.1 % of
amount of SWO (Whichever is high). Even If after above two instances, still Contractor
found breaking of Safety Rules and Regulations then Procedures for Stop dealing must be
initiated against him as per rules and regulations.
14. Payment terms shall be as follows:
14.1 Payment will be made against Invoice value and shall be paid against actual execution.
The bills should be submitted in Duplicate to respective Superintending/Executive
Engineer, Circle/Division Office along with following documents:
Measurement Report of each site by PGVCL authorized inspection Officer (not below the
rank of Deputy Engineer)
Material Accounting for work duly certified by Engineer-in-charge
Work Completion Certificate duly signed by Contractor for which the Bill is submitted.
Copy of Insurance Policy against the Material equivalent to the Order Value as
per Tender Condition No. No.7 under this Section.
Contractor must submit the above documents within Fifteen (15) Days from the
actual date of completion of work to respective S/dn Office.
DOP is to be followed for Payments against the Work Orders.
14.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works otherwise
only final bill shall be paid.
14.3 The time limit for the work may be reduced and contractor should make all his efforts
to complete the work within stipulated time limit as may be given by the Engineer In
Charge depending upon emergency of work.
15. FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the
parties including:
15.1 War and other hostilities, (whether war be declared or not), invasion, act of foreign
enemies, mobilization, requisition or embargo;
15.2 Rebellion, revolution, insurrection, military or usurped power and civil war;
15.3 Ionizing radiation or contamination by radioactivity from any nuclear fuel or from any
nuclear waste from the combustion of nuclear fuel, radioactive toxic explosive, or other
hazardous properties of any explosive nuclear assembly or nuclear components
15.4 Riot, commotion or disorder, except where solely restricted to employees of the
15.5 Neither party shall be considered to be in default or in breach of his obligations under
the Contract to the extent is that performance of such obligations prevented by any
circumstances of Force Majeure that arise after the date of the Notification of Award.
15.6 If either party considers that any circumstances of Force Majeure have occurred which
may affect performance of his obligations he shall promptly notify the other party.
15.7 Upon the occurrence of any circumstances of Force Majeure, the Contractor shall
endeavour to continue to perform his obligations under the Contract so far as
reasonably practicable. The Contractor shall notify the Engineer-in-Charge of the steps
he proposes to take including any reasonable alternative means for performance, which
are not prevented by Force Majeure. The Contractor shall not take any such steps
unless directed so to do by the Engineer-in-Charge.
15.8 If circumstances of Force Majeure have occurred and shall continue for a period of
days, notwithstanding, the Contractor may by reason thereof, having been granted an
extension of Time for Completion of the Works, either party shall be entitled to serve
upon the other, 30 days’ notice to terminate the Contract. If at the expiry of the period of
30 days Force Majeure shall continue, the Contract shall terminate.
Sign & Stamp of the Bidder P a g e 1 |
16. TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all works
connected with line having been completed correctly as per Indian Electricity Rules &
procedure. Any extra cost involved due to incompleteness of work or bad workmanship
found out subsequently shall be set right with and by you at your own cost.
17. HANDING OVER OF ASSET
17.1 After successful completion of the lines and Transformers or any other electrical
equipment the entire newly created network is to be handed over to the concern
Deputy Engineer of PGVCL. The handing over note covering the details of all the
materials used and total work executed must be signed jointly by the bidder and
PGVCL Engineer. Copy of handing over note must be attached along with bill.
17.2 The contractor shall arrange to hand over the complete work immediately on
completion of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR by contractor
due to non-availability of particular item/material for long period of time and TLE cannot be
approved for that work beyond certain time limit Or such item if not required to be installed
at particular location, then Recovery is to be made as mentioned below for not carrying out
that work from SWO issued for that work.
Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor and No any other
Recovery should be made other than above Work.
19. CONTRACT QUALITY ASSURANCE:
19.1 The Bidder shall include in his proposal the Quality Assurance Program containing the
overall quality management and procedures which he proposes to follow in the
performance of the Works during various phases as detailed in relevant clause of the
General Technical Conditions.
19.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed
for the execution of the Contract. PGVCL reserve the right to inspect the work at any
stage of contract i.e. during the execution and after the execution of work.
19.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items
(if any) are being supplied. Such details shall be accompanied by their list of previous
supplies made performance reports etc. However, in case of orders are placed, specific
approval shall be obtained from the PGVCL for the vendor supplied materials. The
quality assurance program shall be furnished for each material separately for approval.
20. TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
20.1 In case of any type of misappropriations, cheating or intention of cheating, frauds,
irregularities, malpractice, etc. the Managing Director PGVCL reserves the right to
cancel the order without giving reasons thereof and forfeit the security deposit.
20.2 The PGVCL reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
PGVCL shall in such an event give fifteen (15) days’ notice in writing to the
Contractor of his decision to do so.
20.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall
discontinue the work on the date and to the extent specified in the notice, make all
reasonable efforts to obtain cancellation of all orders and Contracts to the extent they
are related to the work terminated and terms satisfactory to the PGVCL, stop all
further sub-contracting or purchasing activity related to the work terminated, and
assist PGVCL in maintenance, protection, and disposition of the works acquired
under the Contract by the PGVCL. In the event of such a termination the Contractor
shall be paid compensation, equitable and reasonable, dictated by the circumstances
prevalent at the time of termination.
Sign & Stamp of the Bidder P a g e 1 |
20.4 If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners
dies then unless the PGVCL is satisfied that the legal representatives of the individual
Contractor or of the proprietor of the propriety concern and in the case of partnership,
the surviving partners, are capable of carrying out and completing the Contract the
PGVCL shall be entitled to cancel the Contract as to its in completed part without
being in any way liable to payment of any compensation to the estate of deceased
Contractor and/or to the surviving partners of the Contractor’s firm on account of the
cancellation of the Contract. The decision of the PGVCL that the legal
representatives of the deceased Contractor or surviving partners of the Contractor’s
firm cannot carry out and complete the Contract shall be final and binding on the
parties. In the event of such cancellation the PGVCL shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased
Contractor and/or the surviving partners of the Contractor’s firm liable to damages for
not completing the Contract.
21. ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and Bidder, in
connection with this agreement except as to matters, the decision for which has been
specifically provided, either party may forthwith give to the other notice in writing of
existence of such questions, dispute, difference and the same shall be referred to the sole
arbitration of a person nominated by Managing Director, PGVCL. This reference shall be
governed by Indian Arbitration Act prevailing at the time of dispute and the rules made
there under. The award in such arbitration shall be final and binding on all the parties.
Work under the agreement shall continue during the arbitration proceedings unless the
PGVCL or the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related documents forming
part of the enquiry or Contract are property of PGVCL and shall not be used for any other
purpose, except for the execution of the contract. All rights related to the technical
specifications, drawings and records are reserved by PGVCL only and no part or partial
should be reproduced, copied or alter without prior permission to PGVCL in writing. In the
event of the breach of this provision, PGVCL can claim the damages caused by such
23. Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
23.1 Has submitted fake, false or forged documents/certificates
23.2 Has revised/withdrawn price bid after opening of Techno: commercial bid, until and
unless it is sought for
23.3 Has refused to accept Letter of Acceptance/Purchase Order/Work Order after the same
is issued by the Company within the validity period and as per agreed terms and
23.4 Has committed breach of contract or has failed to perform a contract or has abandoned
23.5 Has failed to provide suitable expertise for the work as per prescheduled program
23.6 Has failed to submit all the necessary Test reports/documents within time schedule / as
per Company's time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is
placed subject to submission of type reports / documents to the firm.
23.7 Has indulged in construction and erection of defective works.
23.8 Has substituted materials In lieu of materials supplied by the Company or has not
returned or has short returned or has unauthorised disposed of materials/ documents/
drawings/ tools or plants or equipment supplied by the Company
23.9 Has involved in malpractices such as bribery, corruption, fraud, canvassing and
23.10 Has unauthorised obtained official company information or copies of documents, in
relation to the Tender/Contract
Sign & Stamp of the Bidder P a g e 1 |
23.11 Has failed to follow the stipulated mode of communication, if specified by the tendering
authority/ purchaser.
23.12 Any other ground for which in the opinion of the Company makes it undesirable to deal
with the Firm, and
23.13 In case the State Government directs the Company to place a firm in stop dealing/
banned for business dealing/ blacklisting
23.14 The firm, stop deal and/or banned for business dealing and/ or blacklist by GUVNL or
any subsidiary Companies of GUVNL shall be considered as a stop deal and/ or banned
for business dealing and/ or blacklisting for all Companies.
24. Effect of putting a proprietor/firm for Stop dealing/Banned for business dealing are
24.1 The proprietor/all the partners/directors of the stop deal/ banned for business dealing/
blacklisting firm shall also be considered for stop deal/ banned for business dealing.
24.2 Once the name of the firm and/ or proprietor/ partner/ director of the firm appears in the
list of Stop dealing / Banned for business dealing in any Company of GUVNL and its
Subsidiary Companies,
i.No enquiry shall be issued to a firm.
ii.No bids / tender shall be considered for evaluation and the bid submitted by the Firm
shall be returned.
24.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm is put on
Stop dealing/ Banned for business dealing by GUVNL or any of its subsidiary
Companies, during tender process: -
i. Before opening Technical bids, the bid submitted by the Firm will be treated as
“Disqualified Bid” and automatically stand as “Rejected Bid” at the time of scrutiny of
Preliminary / Technical Bid.
ii.After opening Technical bid but before opening the price bid, the price bid of the Firm
should not be opened and the bid submitted by the Firm will be treated as “Disqualified
Bid” and automatically stand as “Rejected Bid” at the time of scrutiny of Technical Bid.
iii.After opening of price bid, the offer of the Firm should be ignored and will not be further
evaluated. The Firm will not be considered for issue of order even if its price is the
lowest. In this situation, the next lowest bidder shall be considered as L1.
iv.The BG/EMD submitted by the Firm with tender should be returned after obtaining
confirmation from GUVNL and its other subsidiary Companies that there are no
outstanding dues recoverable from the firm.
24.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company and is
already executing work and/ or Letter of Acceptance/ purchase order awarded to them
by another Company, then the firm should be allowed to complete such awarded work /
24.5 The amount of EMD/SD/ any payment against supply withheld at the instance of
GUVNL or any of its subsidiary Companies shall be appropriated against the dues
recoverable from the firm by GUVNL or any of its subsidiary Companies. EMD/ SD/ PG
in the form of bank Guarantee shall be encashed and appropriated.
24.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and when a Firm
is put on Stop dealing/ Banned for business dealing, all the manufacturing works of the
Firm shall be on Stop dealing/ Banned for business dealing for GUVNL and its
Subsidiary Companies & for all Services of the Firm.
24.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary
Concern, then all the Concerns of the same Proprietor shall also be considered to be
on Stop Dealing/ Banned for business dealing.
24.8 The Board of Directors of the concerned Company may however, if he considers it to
be in the interest of the Company, remove the ban in respect of any specific Service
from any Contractor for that Company only.
25. Every bidder should, at the time of submission of bid, give a declaration as per Annexure
VI attached with this Tender, that bidder and/or proprietor/ partner/ director of the firm has
not been placed on Stop dealing / Banned for business dealing / blacklisting by GUVNL
and it’s any Subsidiary Companies.
Sign & Stamp of the Bidder P a g e 1 |
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Sr. Time required for work Mentioned in
1 Annual Rate Contract for (East
& North Zone Area) New HT, LT
Connection & Replacement of
TC/CTPT for ND, SPA, SI, SKJY
and all type of Scheme work
under Ghuntu Ind Sdn
Sign & Stamp of the Bidder P a g e 1 |
Details of work experience in last three years
(To be completely filled by the Bidder)
Sr. full address, Work Details of order
No. phone, fax and Description
the order Value
name of contact
• Copies of MAJOR Work orders along with Work completion certificates should be
attached with this information.
• If necessary, separate sheet may be used to submit the information
Sign & Stamp of the Bidder P a g e 1 |
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Reason for non-
Ref. & Work completion with
Sr. full address, Work
date of Order Certification of
No. phone, fax and Description
the order Value Order issuing
name of contact
• Copies of Resumes and appropriate certifications should be attached with this
• If necessary, separate sheet may be used to submit the information.
Sign & Stamp of the Bidder P a g e 1 |
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. __________________________________, employee of
PGVCL at _____________________ (place), is related to our
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives
employed or working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent
Department i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Sign & Stamp of the Bidder P a g e 1 |
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly
specified below in this sheet. If there are no deviations offered, it should be clearly
mentioned on this page.
Deviation offered to
Chapter No, Clause No. Deviation offered
of the tender document
Sign & Stamp of the Bidder P a g e 1 |
List of Onsite Testing Facility (For the work of Laying of HT/LT Underground Cable)
(To be completely filled by the Bidder)
Sr. Name of Date of purchase Date of Utility
No. equipment calibration
Sign & Stamp of the Bidder P a g e 1 |
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
All bidders will have to furnish the following undertaking duly filled in signed and stamped
for each quoted item of the tender along with the Technical Bid.
hereby certify that M/s_________________________________________________ is not
stop deal/black listed by GUVNL and or any subsidiary companies viz.
PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for the tendered item.
Sign & Stamp of the Bidder P a g e 1 |
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable)
(Not Older than 7 Years)
Tests Carried Rating & Type /
Type Test Name of the Results
out at (Name Designation of
Sr. No Report No. test Of the
& Date Conducted Tests.
Laboratory) Equipment
Sign & Stamp of the Bidder P a g e 1 |
List of Performance Certificate:
Sr. Name of the Authority by Reference No. &
Details of items
No. whom certificate is issued Date
Sign & Stamp of the Bidder P a g e 1 |
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during
Last Five Years
Sr. Type Of Accident Brief Reason for
Fatal/Nonfatal Affected
No. (Electrical/Mechanical) the Accident
Sign & Stamp of the Bidder P a g e 1 |
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR
FRAUD OR MISHANDALING OF MATERIAL
declare we will provide ______ nos of labours to carry out this tenders scope of work.
We are having Labour Insurance Policy No.____________________ for ________
nos of our labours. We declare that, as mention below table, we are having following
safety gadgets of our own and they all are in good condition.
List of Safety Gadget Unit owned by
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
Sign & Stamp of the Bidder P a g e 1 |
On Firm’s Letter Head
CERTIFICATE – “A”
I/We__________________________________________ authorized signatory of
M/s._________________________________________ is not related with other firms
who have submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
Sign & Stamp of the Bidder P a g e 1 |
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: ……………………………..…….
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm)
having their registered office at _____________________________________ (Address of the firms
Registered office) (hereinafter called the ‘Tenderer’) wish to participate in the tender No.
(Supply/ Erection/Supply & Erection Work) (Name of the material/equipment/Work) for
_________________________ Paschim Gujarat Vij Company Ltd. and WHEREAS a Bank
Guarantee for (hereinafter called the “Beneficiary”) Rs._____________ (Amount of EMD) valid till
_________ (Mention here date of validity of this Guarantee which will be 5 (FIVE) months beyond
initial validity of Tender’s offer) which is required to be submitted by the tenderer along with the
We, __________________ (Name of the Bank and address of the Branch giving the Bank
Guarantee) having our registered office at ______________________ (Address of Bank’s
registered office) hereby give this Bank Guarantee No.________________ dated _________ and
hereby agree unequivocally and Unconditionally to pay immediately on demand in writing from the
Paschim Gujarat Vij Company Ltd. or any officer authorized by it in this behalf any amount not
exceeding Rs.______________(Amount of E.M.D.),(Rupees ______________________________
(In words) to the said Paschim Gujarat Vij Company Ltd. on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender
or part thereof by the Tenderer within its validity or Non submission of Security Deposit by the
Tenderer within one month from the date tender or a part thereof has been accepted by the
Paschim Gujarat Vij Company Ltd. would constitute a default on the part of the Tenderer and that
this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in
case of any occurrence of a default on the part of the Tenderer and that the encashed amount is
liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
____________________ (Mention here the date of validity of Bank) and shall not be terminable by
notice or by Guarantor change in the constitution of the Bank or the firm of Tenderer Or by any
reason whatsoever and our liability hereunder shall not be impaired or discharged by any extension
of time or variations or alternations made, given, conceded with or without our knowledge or
consent by or between the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only
by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is
restricted to Rs. __________ (Amt. of E.M.D.) (Rupees
____________________________________) (In words). Our Guarantee shall remain in force till
_________ (Date of validity of the Guarantee). Unless demands or claims under this Bank
Guarantee are made to us in writing on or before_______ (Date of Validity of the Guarantee), all
rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and
discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the Bank’s Authorized Signatory
Address of the Bank with Branch Code, with
Telephone and Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are
(i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
Sign & Stamp of the Bidder P a g e 1 |
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of ___________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij
Company Ltd. or any Officer authorized by it in this behalf any amount up to and not
exceeding _______ (in words) Rupees ___________________ to the said Paschim
Gujarat Vij Company Ltd. on behalf of M/s.
contract for the supply/works specified below
This agreement shall be valid and binding on this Bank up to and inclusive of
______________ and shall not be terminable by notice or by change in the constitution of
the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our
liability hereunder shall not be impaired or discharged by any extension of time or variations
or alterations made, given conceded or agreed, with or without our knowledge or consent,
by or between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GUVNL or Subsidiaries). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of
the Guarantee can be made only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee
is restricted to Rs.___________ (Rupees ___________________________ only). Our
guarantee shall remain in force until ____________________ (Date of validity of the
Guarantee). Unless demands or claims under this Bank Guarantee are made to us in
writing on or before_______ (Date of validity of the Guarantee), all rights of Beneficiary
under this Bank Guarantee shall be forfeited and we shall be released and discharged from
all liabilities there under:
Please Mention here Complete Postal Signature of the
Address of the Bank with Branch Code, Bank’s Authorized Signatory with
Telephone and Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business,
which are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government
of Gujarat (GoG)
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
Sign & Stamp of the Bidder P a g e 1 |
This agreement is made at ___________the ___day of______month _______Year
between the Paschim Gujarat Vij Company Ltd. &__________________________
(hereinafter referred to as “the Contractor “which expression shall unless excluded by or
repugnant to the context included its successors or permit assigns) of the one part and the
Paschim Gujarat Vij Company Ltd. Having its Regd. and Corporate Office at Laxminagar,
Off Nanamava Road, Rajkot, 360004 (hereinafter called “The Company” which expression
shall unless excluded by or repugnant of the context include its successors of assigns) of
the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for
Company’s LOA No. ____________________, Dated ___________, hereinafter called
“The works and more particularly desorbed enumerated or referred to in the specifications,
other letters and schedule of price which for the purpose of identification have been signed
by The Superintending Engineer/Executive Engineer,, Circle/Division, PGVCL on
behalf of the Company, a list where of is made out in the schedule here under written and
all of which said documents are deemed to form part of this contract and include in the
expression “The works “wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the
terms and subject to the conditions herein mentioned.
1.) The contractors shall do and perform all works and things in this contract mentioned
and described or which are implied therein of therefore respectively or are reasonable
necessary for the completion of the works as mentioned and at the time in the manner
and subject to the terms conditions and stipulation contained in this contract and in
consideration of the due provision, executions, construction and completion of the
works agreed to by the contractors as aforesaid the company both hereby covenant
with the contractor to pay all the claims of money as and when they become due and
payable to the contractor under the provisions of the contract such payment to be
made at such times in such manner as is provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to
and without prejudice to the right of the company to enforce for delay and or any other
rights whatever including the right to reject and cancel on default or breach by the
contract of the conditions and the covenant as stipulated in the general conditions
specifications form Or tender schedule drawing etc. attached with the Company LOA
3.) The Contractor will strictly follow the safety Rules and Regulations during the execution
of aforesaid work. The Contractor will also provide all required Safety Gadgets to his
Supervisors and labours to execute the work mentioned in Tender. On violating or
breaking the Safety Rules and Regulations, and if Supervisors/Labours are found
without Safety Gadgets, “The Company” reserves the right to take actions as per the
terms and conditions mentioned in Tender without any prejudice.
4.) The Company reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
PGVCL shall in such an event give fifteen (15) days’ notice in writing to the Contractor
of his decision to do so.
Sign & Stamp of the Bidder P a g e 1 |
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and
to the extent specified in the notice, make all reasonable efforts to obtain cancellation
of all orders and Contracts to the extent they are related to the work terminated and
terms satisfactory to the Company, stop all further sub-contracting or purchasing
activity related to the work terminated, and assist “The Company” in maintenance,
protection, and disposition of the works acquired under the Contract by the Company.
In the event of such a termination the Contractor shall be paid compensation, equitable
and reasonable, dictated by the circumstances prevalent at the time of termination.
6.) If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners
dies then unless “the Company” is satisfied that the legal representatives of the
individual Contractor or of the proprietor of the propriety concern and in the case of
partnership, the surviving partners, are capable of carrying out and completing the
Contract “the Company” shall be entitled to cancel the Contract as to its in completed
part without being in any way liable to payment of any compensation to the estate of
deceased Contractor and/or to the surviving partners of the Contractor’s firm on
account of the cancellation of the Contract. The decision of the Company that the
legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding
on the parties. In the event of such cancellation the Company shall not hold the estate
of the deceased Contractor and/or the surviving partners of the estate of the deceased
Contractor and/or the surviving partners of the Contractor’s firm liable to damages for
not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters
may be altered by mutual agreement and if so altered shall not be deemed or constructed
to mean and to effect or alter other terms and conditions of the contract and the contract so
altered or revised shall be and shall always be deemed to have been subject without
prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month
year first above written.
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The Paschim Gujarat Vij Company Ltd
Sign & Stamp of the Bidder P a g e 1 |
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as
the COMPANY having given contract for the work of
A/T No. __________________________, dated _______________ and all future contract
that may be awarded to me in the next one year and in terms of the condition in clause
of the COMPANY’s tender and contract for work.
I residing at by this Bond bind myself responsible for and shall pay compensation to my
workmen payable under the workmen’s compensation ACT – 1923 (viii of 1923) hereinafter
called the said Act for death or injuries caused to the workmen engaged by this presents, if
such compensation is paid by the COMPANY as principal under such sub-section (1) of
section 12 of the said Act on behalf of me, to pay such amount of compensation on
demand within 48 hours to the COMPANY that it might have to spend as legal and other
incidental charges in defending any suit or action arising out of the death of injuries in
regard to compensation paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the
death or injuries to the workmen engaged by me. During the execution of work of said
contract and all future contracts that may be awarded to me in the next one year is filed by
the worker against the COMPANY, I shall imbrues to the COMPANY such sum that the
COMPANY is required to spend as legal and other incidental charges in defending such
suit or action and also the amount that may be ordered to be paid to the worker / or his
heirs as compensation and that the above written bind shall remain in full force and virtue
till the COMPANY is required to defend such suit or action filed by the workers and or heirs
against the COMPANY. Further it is applicable on death of contractor himself also. No any
compensation will be claimed by legal heirs of contractor.
Signature of the Executants
Sign & Stamp of the Bidder P a g e 1 |
Technical Specifications
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT For erection work
KV and L.T. Distribution lines and Transformer Centres
The work should be strictly as per specifications and approved designs of the PGVCL. The
inferior and unsatisfactory work is liable for rejection and to be rectified at the cost of contractor.
The work will have to be carried out as per programmed laid down by department and under the
entire instruction of engineer-in-Charge and contractor should employ supervisor who could
supervise the works throughout and he should remain present on site. No tools & Tackles will be
supplied by the department.
(A)Erection of HT and LT Lines:
Site clearing and tree branches trimming which come in the way of line will be done by the
contractor at his cost. The Company will assist the contractor in getting necessary permission for
tree cutting etc. Any claim for compensation in above respect will have to be borne by contractor.
(B)Fixing: Pole Position:
The Points of pole structures, guys and earthing will be fixed by the department and will be
shown to the contractor. He should adhere to these locations in all circumstances unless
directed by the department to make any change.The Poles from One site to other site or at
proposed locations must be carted by loading on Tractor or Hand-Cart. The Poles shall not be
carted by toeing/Dragging with Tractor or Cart or with any other means.
(C)Pole setting:
Where poles are set in good solid ground the depth of pit shall be 1/6th of the height of the pole
and for grounds of any other nature. The pit must be size of 2 X 2 X 5 feet. The poles and guys
must not be set at the edge of cuts/at shore/embankment where the soil is liable to be washed or
eroded out of such setting should be avoided. While back filling, earth must be packed tight and
in no case earth be dumped to greater depth more than four inches without being rammed, hard
before the next layer is thrown in. Extra earth should be packed around the poles and rammed.
The cost of damage done to the pole during erection will be recoverable from the contractor. No
pole, which is out of plumb or out of alignment shall be accepted. The pole will be in his safe
custody till erected and he is liable to compensate to the Company the full cost of pole along with
supervision charges, if the pole is broken during erection, or stolen from his custody. He should
be able to render full account of the poles entrusted to him whenever the Supervising Officer
demands to scrutinizes the same.
(D)Erection of Complete single Pole Structure
Erection of single pole structure comprises of shifting of pole from the stacking place in the
village, excavation of pit, erection in position (with base plate where required), of 8/10 meter PSC
poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps and cross arms and
fabricated materials, fixing of caution board, anti-climbing device etc. complete as per drawing
and specification inclusive of painting, numbering. Generally vertical formation will be used on
each pole. However horizontal formation will have to be used in special circumstances as per
instruction at Engineer in change.
(E)Double Pole (D. P.) Structure
Double poles structure such as for HT line tapping, Railway crossing, any other HT/LT or
telephone line crossing, terminal structure for distribution transformer centre comprises of
Excavation suitable pits and refilling of earth, erection in position of two Nos. of 8/10 meter PSC
poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps, cross arms, bracing
cross arm bracing etc. as per drawing/ standards with mounting D.O. fuses/A.B. switches/HT
metering equipment’s etc., painting, Pole numbering, fixing of caution Board and anti-climbing
The D.P. must be properly aligned and must be in plumb. Special structure if included will be
erected as per drawing supplied. Each Shackle Points must have “D” type Jumpers only.
Sign & Stamp of the Bidder P a g e 1 |
(F)Stringing of conductors
This includes stringing of stranded and solid bare conductor with fitting of necessary HT/LT pin
and strain insulators, binding on insulators, jumpers, the jointing in HT line will be done by
twisting sleeve joints as per standard practice. Care must be taken in handling the conductor to
protect against cuts, scratches or kinks. The conductor must not be drawn over rough or rocky
ground, when it is liable to be damaged. AAA/ACSR conductors must be drawn on wooden or
aluminium pulley only. Wastage and cutting should be avoided as far as possible. Not more than
3 % sag will be accepted in the materials account. The sag and spans will be maintained as per
drawing/standard. The cross arms insulators must be so fixed that neither tilts nor bands from
position. The sagging should be uniform for all conductors and uneven sagging will not be
allowed. The ground clearance to be maintained as per IE Rules 2010 Clause No. 58 as
mentioned below.
For lines of voltage not exceeding 650 Volts 5.8 Meters
street For lines of voltage exceeding 650 Volts but
not exceeding 33 kV
For lines of voltage not exceeding 650 Volts 5.5 Meters
street For lines of voltage exceeding 650 Volts but
not exceeding 33 kV
If bare - 4.6 Meter
Elsewhere For lines of voltage up to and including
than along or 11,000 Volts
street For lines of voltage exceeding 11,000 Volts
but not exceeding 33 kV
An overhead line shall not cross over an existing building as far as possible and no
building shall be constructed under an existing overhead line.
Where an overhead line of voltage not exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules
Clause No. 60 from any accessible point, on the basis of maximum sag, shall be observed,
(i) for any flat roof, open balcony, varandah roof and lean-to-roof and Pitched Roof-
(a) when the line passes above the building a vertical clearance of highest part of building
immediately under such line 2.5 meters from the highest point,
(b) When the line passes adjacent to the building a horizontal clearance of 1.2 meters from the
(ii) Where an overhead line of voltage exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules 2010 Clause
No. 61 from any accessible point, on the basis of maximum sag, shall be observed, namely:-
(a) when the line passes having voltage 650 V and up to and including 33000 V above the
building a vertical clearance of highest part of building immediately under such line
meters from the highest point,
(b) When the line having voltage 650 V and up to and including 11000 V passes adjacent to
the building a horizontal clearance between nearest Conductor and any part of such
building on the basis of maximum deflection of wind must be 1.2 meters
(iii) Minimum clearances in meters between lines crossing each other as per IE 2010 Clause No.
69 are as below.
Sr. Nominal System 11-66 110-132 220 400
No. Voltage kV kV kV kV KV
1 Low and Medium 2.44 3.05 4.58 5.49
Sign & Stamp of the Bidder P a g e 1 |
In case of illegal construction / structure on the line under erection, the same is to be put in
written notice to the Engineer-In-charge.
(G)Erection of Stay Set:
The erection of stay set comprises of anchor rod, turn buckle, eye bolt and excavation of
suitable pit size of 2 X 2 X 5 foot, fixing of stay clamp on pole, binding of GI stay wire. The stay
insulators must be inserted in the stay wire on all stays as per drawing. The wrapping of the
Guy wire strands at both ends the stay insulator must be even and must presents neat
appearance and good workmanship. No stay should be left loose but should be tight and
straight to withstand in say cyclone or sand storm, the item includes refilling of earth and
painting of fabrication material. If stays are not required to be concreted, a pre casted cement
concrete block will be supplied by the department from his division store which the contractor
will have to transport at his own cost to the site of work and will have to use for fixing of anchor
A pits of 2 X 2 X 5 foot is to be dig about 4 foot away from the pole on which earthing is
required to be carried out. The earthing pipe/earthing plate/earthing coil supplied by the
company shall be used as per specification and drawing. GI wire no. 8 SWG for earthing should
be bolted with earthing pipe/earthing plate/earthing coil. G. I. Wire must be passed through
PVC rigid Pipe which must be buried at least 0.5 Meter in ground and to be kept 2.0 Meters
above ground along the Pole. The earthing are to be done at place as indicted in the pole
schedule or as selected by the field Engineer. The coke and salt will have to be supplied by the
contractor at his cost. Erection of earthing should be carried out under the supervision of the
Engineer in charge or nominated Supervisors. At least 20 KG of salt and 20 KG of coal per
earth on alternate layers (as per drawing) will be used by contractor. No amount will be paid if
the work is not done in accordance with these specification.
The guarding will have to provide at crossing of lines, telephone line crossing, road crossing
and any accident prone places as indicated by the Engineer in Charge. The work comprises of
fixing of guard cross arms, eye bolts, guard cradle as per design, GI cross lacing wires
complete. Any special type of guarding if required will be designed by the department. Binding
cross arms must be used where the HT line crosses the road. The ground clearance, line to
line clearances etc. to be maintained as per IE Rules 2010 69 and 70. The poles for road
crossing may be concreted as instructions of the Engineer In-charge. The work has to be
carried out as instructions of the Engineer In-charge.
(J)Painting and Numbering:
Rail poles and girder poles shall be given one coat of approved red-lead paint and two coats of
approved aluminium paint. All fabricated material will also be painted with two coats of
approved aluminium paint and there should be sufficient interval between every coat of painting
in order to allow for drying. The bolts and must shall be dipped in anticorrosive oil before
insertion. The lower portion of steel poles up 3 foot above ground level shall be cleaned of all
dust and rust. This surface should be given a base coat of red lead and an additional coat of
black bituminous paint before inserting in the ground. The good quality paint will be supplied by
the contractor and should be of I.S.I mark and will be got approved from Executive Engineer,
prior to starting work.
Name of the feeder and pole number has to be written on all the poles in English/Gujarati as
per instruction of Engineer In-charge. The colour of back ground and name/number must be of
contras colour. Prior to apply Colour for Numbering on P.S.C poles, it should be properly
cleaned and all accumulations of earth, dirt etc. should be removed.
Sign & Stamp of the Bidder P a g e 1 |
Unless Specified concreting is to be done for Girder Poles/Guys only. No any PSC
Pole/Guys to be concreted without any special reason. The Concreting of PSC Poles must be
approved by concerned Executive Engineer prior to executionas per Tender Condition
mentioned under Section III Clause No. 2 and sub clause No. 8. Certificates for special
Reason and approvals must be submitted with detail Bill.
Cement concrete for any pole / stay should be carried out as per specification given by
Engineer In-Charge as and where required. Concreting should be with one part of cement, two
part of specified quality sand and four parts of well burnt Brice bats (1:2:4). The mixture should
be prepared on GI sheet and should be free from the dust. Cement, river sand and metal
should be used by contractor at his own cost. The finishing coat of cement plaster shall be
applied on outer surface Concreting and boxing for smoothness.
The normal size of concreting of pole shall be 2 X 2 X 2 Feet (0.226 cmt) & that for stay 2 x 2x
1 Feet (0.113 cmt). In case of Boxing for pole, it shall be 18” dia. x 3 feet (h) (2’ above and 1'
below ground) (0.15 cmt).
(L)Distribution Transformer Centre:
The distribution transformer centre (10 KVA to 200 KVA) will be of outdoor type on two poles
structures as per standard drawing and 5 KVA Transformers are to be on Single Pole. This
work include erection of special two pole structure as per Item No. 2 and fixing of all fabricated
material for support of line, L.A., HG Fuse/AB Switch, Transformer, LT Dist. Box, cable wiring,
anti-climbing devices etc. The works includes of transportation and hoisting of transformer,
numbering and painting of all fabricated materials. For transformer having capacity of 100 KVA
and above MS channel shall be utilize which will be supplied by the company. Three Earthing
are to be provided on each Transformers.
1) Earthing of LA on One side.
2) Earthing of all Metal Parts from Top angle and Transformer Body and Dist. Box on other
3) For neutral, two separate Earth wire on both side of Transformer and to be common at
All three earthing are to be done as in Delta Formation as shown in the attached Drawing. All
earthing wires are to be connected by proper size of lug and bolted at each earthing points
properly. The Earthing of Transformer Body must be done with lug only. Looping or winding
with Earthing Bolt on Transformer Body is not allowed. Earthing wire Lugs are to be
brought by Contractors. No any extra cost will be paid for this material.
Extra payment for hard soil or rock is payable as per SOR as per committee report to be
formed to decide hard soil or rock which shall consists of Concerned SDO, Deputy
Engineer (Tech) and Executive Engineer.
The cost of damage done to the transformer while erection/Transportation is recoverable from
Before starting the work(new, alteration or addition) and during the works the contractor must
obtain line clear wherever necessary for the concerned officer of this office of other Office. For
any damage done to the Men, Materials and/or property due to non-observance of rules, the
contractor will be solely responsible.
Sign & Stamp of the Bidder P a g e 1 |
SECTION IX: Drawings
Sign & Stamp of the Bidder P a g e 1 |
Sign & Stamp of the Bidder P a g e 1 |
Sign & Stamp of the Bidder P a g e 1 |
Arrangement of Transformer
Sign & Stamp of the Bidder P a g e 1 |
Earthing Arrangement for Transformer Centre
Sign & Stamp of the Bidder P a g e 1 |
Arrangements of Guy
1. Guy Clamp 2.Turn Buckle and Eye Bolt 3.Guy Insulator
4. Guy Wire 5.Guy Rod 6.Guy Pit (2 X 2 X 5 ft.)
7. θ 30 to 40 Deg.
Sign & Stamp of the Bidder P a g e 1 |
Sign & Stamp of the Bidder P a g e 1 |
Sign & Stamp of the Bidder P a g e 1 |
Double Pole (D.P.) Structure
Sign & Stamp of the Bidder P a g e 1 |
Guarding under 11 KV Line
Sign & Stamp of the Bidder P a g e 1 |
Guarding under LT Line
Sign & Stamp of the Bidder P a g e 1 |
LT Line Horizontal Formation and Clearances (415 V)
Sign & Stamp of the Bidder P a g e 1 |
LT Line Vertical Formation and Clearances (415 V)
Sign & Stamp of the Bidder P a g e 1 |
LT Line Horizontal Formation and Clearances (230 V)
Sign & Stamp of the Bidder P a g e 1 |
LT Line Vertical Formation and Clearances (230 V)
Sign & Stamp of the Bidder P a g e 1 |
LABOUR RATES FOR CAPITAL WORKS (Excluding GST)
Sr. DETAILS OF WORKS UNIT Labour Total
No. Rate for Amount
HT TAPPING FROM THE EXISTING POLE INCLUDING FIXING OFCROSS ARMS,
CLAMPS ANTI-CLIMBING DEVICES, DANGER BOARD, INSULATORS ETC. COMPLETE
1 AND PAINTING OF FABRICATED MATERIALS AND NUMBERING COMPLETE NO.
WITHCOST OF PAINTS AS PER STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SET AND EARTHING.
ERECTION OF PSC POLES OF 8 Mt ./200 KG INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OFCROSS ARMS, TOP FITTING CLAMPS ANTI-
2 CLIMBING DEVICES, INSULATORS ETC. COMPLETE AND PAINTING OF FABRICATED NO.
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
ERECTION OF STEEL POLES OF 9 TO 11 METERS INCLUDING EXCAVATION OF PIT
AND REFILLING OF EARTH, FIXING OF CROSS ARMS, TOP FITTING CLAMPS ANTI-
CLIMBING DEVICES, DANGER BOARD, INSULATORS ETC. COMPLETE AND PAINTING
OF STEEL POLE, FABRICATED MATERIALS USED ON THE POLE AND NUMBERING
WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SET AND EARTHING.
ERECTION OF STEEL POLE OF 13 METERS FOR RAILWAY CROSSING ON BG/MG/NG
LINE FOR 0.400/11/22KV OVERHEAD LINES I.E INCLUDING EXCAVATION OF PIT &
REFILLING OFEARTH, FIXING CROSS ARMS, TOP FITTING CLAMPS, ANTI-CLIMBING
4 DEVICES DANGER BOARD, INSULATORS ETC. COMPLETE AND PAINTING OF STEEL NO.
POLES, FABRICATED MATERIALS USED ON THE POLES AND NUMBERING WITH
COSTOF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF
GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE OF 8 METERS 200 KG PSC POLES
INCLUDING EXCAVATION OF PITS & REFILLING OF EARTHING, FIXING OF CHANNELS,
SUPPORTING ANGLES,CLAMPS, ANTI-CLIMBING DEVICES DANGER
5 BOARDS,INSULATORS ETC.COMPLETE AND PAINTING OF FABRICATED MATERIALS NO.
USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.(WITHOUT
ERECTION OF DOUBLE POLE STRUCTURE OF 9 TO 11 METERS.STEEL POLE
INCLUDING EXCAVATION OF PITS & REFILLING OF EARTH, FIXING OF CHANNELS,
SUPPORTING ANGLES, CLAMPS,ANTI-CLIMBING DEVICES DANGER BOARDS,
6 INSULATORS ETC.COMPLETE & PAINTING OF POLES,FABRICATED MATERIAL SUSED NO.
ON THE POLES AND NUMBERING WITH COST OF PAINTS AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.(WITHOUT
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB SWITCH, DO
FUSES OF 8 MTRS 200 KG PSC POLES INCLUDING EXCAVATION OF PITS AND
REFILLING OF EARTH, FIXING OF CHANNELS SUPPORTING ANGLES, CLAMPS, ANTI-
7 CLIMBING DEVICES, DANGER BOARDS, INSULATORS, DO FUSES ETC. COMPLETE NO.
AND PAINTING OF FABRICATED MATERIALS USED ON THE POLES AND NUMBERING
WITH COSTOF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING OF
ERECTION OF GUY SET AND EARTHING. (WITH AB SWITCH)
Sign & Stamp of the Bidder P a g e 1 |
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB SWITCH, DO
FUSES, 9 TO 11 METERS STEEL POLES INCLUDING EXCAVATION OF PITS AND
REFILLING OF EARTH, FIXING OF CHANNEL, SUPPORTING ANGLES, CLAMPS, ANTI-
8 CLIMBING DEVICES, DANGER BOARDS, INSULATORS, ETC. COMPLETE AND NO.
PAINTING OF POLES FABRICATED MATERIALS USED ONTHE POLES AND
NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SET AND EARTHING. (WITH AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURES WITH MOUNTING OF AB SWITCH, DO
FUSES, TRANSFORMERS, LIGHTENING ARRESTORS, DISTRIBUTION BOX. OF
METERS 200 KG AND PSC POLES INCLUDING EXCAVATION OF PITS AND REFILLING
OF EARTH, CARTING OF TRANSFORMERS FROMSTORES TO SITE, FIXING OF
9 CHANNELS, SUPPORTING ANGLES, BRACINGS CROSS ARMS CLAMPS, NO.
ANTICLIMBING DEVICES, DANGER BOARDS, CONDUCTOR AND CABLE WIRING
ETC.COMPLETE AND PAINTING OF FABRICATED MATERIALS USEDON THE POLES
AND NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB SWITCH,HG
FUSES TRANSFORMERS, LIGHTENINGARRESTORS, DISTRIBUTION BOX 9 TO
METERS STEEL POLESINCLUDING EXCAVATION OF PITS & REFILLING OF
EARTHCARTING OF TRANSFORMERS FROM STORE TO SITE, FIXINGOF CHANNELS
10 SUPPORTING ANGLES, BRACING, CROSS ARMS,CLAMPS, ANTICLIMBING DEVICES, NO.
DANGER BOARDS,CONDUCTOR AND CABLE WIRING ETC. COMPLETE ANDPAINTING
OF POLES FABRICATED MATERIALS USED ON THEPOLES AND NUMBERING AS PER
STANDARD SPECIFICATIONBUT EXCLUDING ERECTIONS OF GUY SETS AND
ERECTION OF GUY SET INCLUDING EXCAVATION OF PITS &REFILLING OF EARTH AS
PER STANDARD SPECIFICATION WITH STAY CLAMPS, STAY WIRE, ANCHOR ROD,
TURN BUCKLE, EYEBOLT, GUY INSULATOR, CEMENT CONCRETE BLOCK ETC. BUT
EXCLUDING CONCRETING.
CONCRETING OF POLES, GUYS, ETC. INCLUDING COST OF CEMENT SAND METAL
12 (1:2:4) AND WATER ETC. AS PER STANDARD SPECIFICATION. CEMENT SHOULD BE CMT
OPC(53 GRADE) USED FOR CONCRETING
ERECTION OF COIL TYPE EARTHING INCLUDING COST OF COALSALT ETC. BUT
13 WITHOUT COST OF GI WIRE AS PER STANDARD SPECIFICATION (20 Kg Salt + 20 Kg NO.
ERECTION OF PLATE TYPE EARTHING INCLUDING COST OF COALSALT ETC. BUT
14 WITHOUT COST OF GI WIRE AS PER STANDARD SPECIFICATION (20 Kg Salt + 20 Kg NO.
ERECTION OF STREET LIGHT FIXTURE COMPLETE WITHCLAMPS, BRASS NIPPLE,
15 BRASS HOLDER TECK WOOD BUSH,REFLECTORS FUSE, WIRING ETC. AS PER NO.
STANDARD SPECIFICATION BUT EXCLUDING COST OF MATERIALS.
STRINGING OF 30MM2 ACSR/34MM2,55MM2 AAACCONDUCTOR FOR 11/22KV & COND
LT LINES INCLUDING FIXING OF INSULATORS, BINDING JUMPERING ETC. PER
17 STRINGING OF GI WIRE 8 SWG INCLUDING BINDING JUMPERINGETC. DO
PROVIDING SINGLE PHASE SERVICE CONNECTION WITH PVC2.5/4.0 MM2 TWIN
CORE CABLE FROM TERMINAL POLE TOMETERING POINT INCLUDING FIXING OF
METER & COMPLETE WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING
COST OF MATERIALS. BUT INCLUDING COST OF JUSTI KHILA.
PROVIDING THREE PHASE 4 WIRE SERVICE CONNECTION WITHPVC 4MM2/10MM2
FOUR CORE CABLE FROM TERMINAL POLETO METERING POINT INCLUDING FIXING
OF METER & COMPLETE WORK AS PER STANDARD SPECIFICATION BUT EXCLUDING
COST OF MATERIALS. BUT INCLUDING COST OF JUSTI KHILLAS, NUTS & BOLTS.
Sign & Stamp of the Bidder P a g e 1 |
ADDITIONAL COST FOR EXCAVATION OF PIT IN HARD ROCKAREA FOR ERECTION OF
POLE/ GUY ETC. AS PER STANDARD SPECIFICATION OVER & ABOVE NORMAL COST
20 COVERED AGAINST EXCAVATION OF PIT UNDER NORMAL SOIL FOR ERECTION OF NO.
POLE, GUY, DOUBLE POLE STRUCTURE EARTHING WITH THE APPROVAL OF
SUPDT.ENGINEER.
21 PROVIDING GUARDING TO HT LINE ON ROAD/ RAIL CROSSING. MTR
22 PROVIDING GUARDING OF LT LINES ON ROAD/RAIL CROSSING. MTR
23 LT LINE TAPPING- SINGLE PHASE NO.
24 LT LINE TAPPING- THREE PHASE NO.
LAYING OF OVERHEAD LT CABLE FOR ROAD CROSSING,HT LINE CROSSING AND Per
TELEPHONE LINE CROSSING ETC.(PER SPAN) Span
ERECTION OF SINGLE POLE STRUCTURES WITH, DO FUSES, TRANSFORMERS,
LIGHTENING ARRESTOR, DISTRIBUTION BOX. ON 8 METERS 200 KG PSC POLE
INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF
TRANSFORMERS FROM STORES TO SITE, FIXING OF CHANNELS, SUPPORTING
26 ANGLES, BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING DEVICES DANGER NO.
BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE AND NUMBERING WITH COST OF
PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS
ERECTIONS OF SINGLE POLE STRUCTURES WITH MOUNTING OF AB SWITCH DO
FUSES, TRANSFORMERS, LIGHTENING ARRESTOR, AND DISTRIBUTION BOX. ON 9 to
11 METERS RSJ POLE INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH,
CARTING OF TRANSFORMERS FROM STORES TO SITE, FIXING OF CHANNELS,
27 SUPPORTING ANGLES, BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING DEVICES NO.
DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING
OF FABRICATED MATERIALS USED ON THE POLE AND NUMBERING AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND
ERECTION OF SINGLE POLE STRUCTURES WITH, HG FUSES, TRANSFORMERS,
LIGHTENING ARRESTOR, DISTRIBUTION BOX ON EXISTING 8 METERS 200 KG PSC
POLE INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF
TRANSFORMERS FROM STORES TO SITE, FIXING OF CHANNELS, SUPPORTING
28 ANGLES,BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING DEVICES DANGER NO.
BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE AND NUMBERING WITH COST OF
PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS
ERECTION OF SINGLE POLE STRUCTURES WITH , HG FUSES, TRANSFORMERS,
LIGHTENING ARRESTOR, DISTRIBUTION BOX ON EXISTING 9 to 11 METERS RSJ
POLE INCLUDING EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF
TRANSFORMERS FROM STORES TO SITE, FIXING OF CHANNELS, SUPPORTING
29 ANGLES,BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING DEVICES DANGER NO.
BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE AND NUMBERING WITH COST OF
PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS
ERECTION OF PSC POLES OF 10 Mt./ 270 KG INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OFCROSS ARMS, TOP FITTING CLAMPS ANTI-
30 CLIMBING DEVICES, INSULATORS ETC. COMPLETE AND PAINTING OF FABRICATED NO.
MATERIALS USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET AND EARTHING.
Sign & Stamp of the Bidder P a g e 1 |
ERECTION OF DOUBLE POLE STRUCTURE OF 10 METERS 270 KG PSC POLES
INCLUDING EXCAVATION OF PITS & REFILLING OF EARTHING, FIXING OF CHANNELS,
SUPPORTING ANGLES,CLAMPS, ANTI-CLIMBING DEVICES DANGER
BOARDS,INSULATORS ETC.COMPLETE AND PAINTING OF FABRICATED MATERIALS
USED ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION OF GUY SETS AND EARTHING.
STRINGING OF 100MM2 ACSR/100MM2 AAAC CONDUCTOR FOR 11/22KV & LT COND
LINES INCLUDING FIXING OFINSULATORS, BINDING JUMPERING ETC. PER
STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL ACCESSORIES
I.E. SPECIAL DESIGN SUSPENSIION/TENSION CLAMP. FIXING OF CROSSARM, LT
33 SHACKLE INSULATOR, & DIRECTED BY ENGINEER-IN-CHARGE. MTR
STRINGING OF ABC OF FOLLOWING SIZES INCLUDING FITTING OF ALL ACCESSORIES
I.E. SPECIAL DESIGN SUSPENSIION/TENSION CLAMP. FIXING OF CROSS ARM, LT
34 SHACKLE INSULATOR, ETC. FOR FIXING OF MESSENGER WIRE COMPLETE, AS MTR
REQUIRED & DIRECTED BY ENGINEER-IN-CHARGE.
STRINGING OF 11KV ABC OF FOLLOWING SIZES IN RURAL/URBAN AREA INCLUDING
FIXING OF CROSS ARM, SSPECIAL DESIGN SUSPENSION/TENSION CLAMP, BINDING
TO PIN INSULATOR, PREPARING SHCKLE POINT JUMPERS ETC. AS REQUIRED AND
DIRECTED BY ENGINEER-IN-CHARGE.
STRINGING OF ABC OF FOLLOWING SIZE INCLUDING FITTING OF ALL
36 ACCESSORIES MTR
ERECTION OF DOUBLE POLE STRUCTURES WITH MOUNTING OF AB SWITCH, HG
FUSES, TRANSFORMERS, LIGHTENING ARRESTORS, DISTRIBUTION BOX OF
METERS 270 KG AND PSC POLES INCLUDING EXCAVATION OF PITS AND REFILLING
OF EARTH, CARTING OF TRANSFORMERS FROM STORES TO SITE, FIXING OF
37 CHANNELS, SUPPORTING ANGLES,BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING NO.
DEVICES DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE AND
PAINTING OF FABRICATED MATERIALS USEDON THE POLES AND NUMBERING WITH
COST OF PAINT AS PER STANDARD SPECIFICATION BUT EXCLUDING ERECTION
OFGUY SETS AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE FOR CTPT UNIT (PSC POLE)
(ERECTION OF DOUBLE POLE STRUCTURES WITH CTPT, LIGHTENING
ARRESTORS, OF 8 METERS 200 KG AND PSC POLES INCLUDING
EXCAVATION OF PITS AND REFILLING OF EARTH, CARTING OF CTPT
FROMSTORES TO SITE, FIXING OF CHANNELS, SUPPORTING
38 ANGLES,BRACINGS CROSS ARMS CLAMPS, ANTICLIMBING DEVICES NO.
,DANGER BOARDS, CONDUCTOR AND CABLE WIRING ETC.COMPLETE
AND PAINTING OF FABRICATED MATERIALS USE ON THE POLES AND
NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SETS AND
Sign & Stamp of the Bidder P a g e 1 |
ERECTION OF SINGLE POLE SHACKLE POINT ON PSC POLE 8 MT./200
KG.(ERECTION OF PSC POLES OF 8 MT./200 KG INCLUDING
EXCAVATION OF PIT AND REFILLING OF EARTH, FIXING OF CROSS
39 ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, INSULATORS No.
ETC. COMPLETE AND PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH COST OF PAINT AS PER
STANDARD SPECIFICATION BUT EXCLUDING ERECTION OF GUY SET
ERECTION OF SINGLE POLE SHACKLE POINT ON STEEL POLE ( 9 TO
11 MTR)(ERECTION OF STEEL POLES OF 9 TO 11 METERS INCLUDING
EXCAVATION OF PIT AND REFILLING OF EARTH, FIXING OF CROSS
ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, DANGER
BOARD, INSULATORS ETC. COMPLETE AND PAINTING OF STEEL
POLE, FABRICATED MATERIALS USED ON THE POLE AND
NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SET ANDEARTHING).
ERECTION OF SINGLE POLE SHACKLE POINT ON STEEL POLE(13 MTR)
(ERECTION OF STEEL POLES OF 13 METERS INCLUDING
EXCAVATION OF PIT AND REFILLING OF EARTH, FIXING OF CROSS
41 ARMS, TOP FITTING CLAMPS ANTI-CLIMBING DEVICES, DANGER No.
BOARD, INSULATORS ETC. COMPLETE AND PAINTING OF STEEL
POLE, FABRICATED MATERIALS USED ON THE POLE AND
NUMBERING WITH COST OF PAINT AS PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OF GUY SET ANDEARTHING)
ERECTION OF DOUBLE POLE STRUCTURE OF 13 MTR STEEL POLE
(ERECTION OF DOUBLE POLE STRUCTURE WITH MOUNTING OFAB
SWITCH, DO FUSES TRANSFORMERS, LIGHTENINGARRESTORS,
DISTRIBUTION BOX 13 METERS STEEL POLESINCLUDING
EXCAVATION OF PITS Et REFILLING OF EARTH CARTING OF
42 TRANSFORMERS FROM STORE TO SITE, FIXING OF CHANNELS No.
SUPPORTING ANGLES, BRACING, CROSS ARMS,CLAMPS,
ANTICLIMBING DEVICES, DANGER BOARDS,CONDUCTOR AND CABLE
WIRING ETC. COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THEPOLES AND NUMBERING AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTIONS OF GUY SETS AND EARTHING.)
ERECTION OF DOUBLE POLE STRUCTURE FOR CTPT UNIT(GIRDER POLE) (ERECTION
OF DOUBLE POLE STRUCTURE WITH MOUNTING OF CTPT, LIGHTEN INGARRESTORS,
9 TO 11 METERS STEEL
POLESINCLUDING EXCAVATION OF PITS Et REFILLING OF EARTH
CARTING OF CTPT FROM STORE TO SITE, FIXING OF CHANNELS
43 SUPPORTING ANGLES, BRACING, CROSS ARMS,CLAMPS, No.
ANTICLIMBING DEVICES, DANGER BOARDS,CONDUCTOR AND CABLE
WIRING ETC. COMPLETE AND PAINTING OF POLES FABRICATED
MATERIALS USED ON THEPOLES AND NUMBERING AS PER
STANDARDSPECIFICATION BUT EXCLUDING ERECTIONS OF GUY SETS AND
PROVIDING SINGLE PHASE SERVICE CONNECTION (FOR SOLAR
GENERATION METER, HIGH RISE BUILDING, COMPLEX ETC.)WITH
PVC 2.5/4.0 MM2 TWIN CORE CABLE FROM COMMON BUS BAR TO
METERING POINT INCLUDING FIXING OF METER Et COMPLETE WORK AS PER
STANDARD SPECIFICATION BUT EXCLUDING COST OF
PROVIDING THREE PHASE 4 WIRE SERVICE CONNECTIONS (FOR SOLAR
GENERATION METER, HIGH RISE BUILDING, COMPLEX ETC.)
WITH PVC 4MM2/10MM2 FOUR CORE CABLE FROM BUS BAR TO
METERING POINT INCLUDING FIXING OF METER Et COMPLETE WORK AS PER
STANDARD SPECIFICATION BUT EXCLUDING COST OF
Total Estimated Tender Cost Rs. _____________________
Sign & Stamp of the Bidder P a g e 1 |
Labour Rates for maintenance work of HT / LT Line and Transformer
Centre / Service Line / Reconnection and Disconnection etc. (Excluding of
(A) HT -LINE MAINTENANCE WORK (Excluding GST)
Item Unit Rate for
1 Replacement of V-X-Arm with transportation, etc. (+) Painting. Set
2 Straightening of tilted V-X -Arm, Top fitting / LT X-Arm/ Tapping Set
3 Dismantling of Old V-X-Arm with Top fitting / LT X-Arm/ Tapping
Angle from existing pole.
4 Fixing of V-X-Arm with Top / LT - X- Arm/ Tapping Angle on Set
existing necked pole with colour
5 Re-fixing & Changing height of V-X-Arm / LT-X-Arm / Tapping
Angle Projection Brackets.
6 Dismantling of Old deteriorated/Broken/re-usable PSC Pole with all
Fabrication - with crediting fabrication at field store and staking of No.
pole safely on road side.
7 Dismentaling of existing re-usable PSC Pole with all
Fabrication - with crediting fabrication at field store and No.
staking of pole safely on road side.
8 Dismantling Of Old Deteriorated/Broken/Re-Usable M.S. Girder
Pole/ Rail Pole / Tubular Pole With All Fabrication - With Crediting No.
Fabrication At Field Store And Staking Of Pole Safely On Road
9 Dismentaling Of existing M.S.Girder Pole with entire length
intact and Re-Usable With All Fabrication - With Crediting No.
Fabrication At Field Store And Staking Of Pole Safely On
10 Dismantling of Old deteriorated/Broken D.P. Structure set of PSC Set
11 Dismantling of Old re-usable D.P. Structure set of PSC Poles (if Set
intact and re-usable)
12 Dismantling Of Old Deteriorated/Broken/Re-Usable D.P. Structure Set
Set Of M.S. Girder Poles
13 Dismantling Of intact and Re-Usable D.P. Structure Set Of Set
M.S. Girder Poles
14 Replacement of 11 KV Pin Insulator with providing new double pin Set
bindings. (old pin rod should be credited to field store)
15 Replacement of old 11 KV Pin Insulator by new 22 KV Pin Insulator No.
with rod and providing double pin bindings and check nuts etc.
16 Re-Pin binding with cleaning of 11 KV / 22 KV Pin Insulator. No.
17 Replacement of old 11 KV Disc Insulator by New one with binding No.
18 Providing 11 KV double disc insulator with binding etc. No.
19 Replacement of Old jumpers and Providing new double jumpers PER
with 8" binding and PVC pipe etc.
20 Replacement of existing A.C.S.R./All Alu. Conductor up to 55 mm2 Per
by new one/ Coated conductor with pin binding including cond.
transportation and crediting to store etc. Per Km
Replacement of existing 11 KV conductor by 0.1 A.C.S.R./ AAAC
DOG conductor with new double pin binding. Per
Sign & Stamp of the Bidder P a g e 1 |
22 Re-stringing of 11 KV A.C.S.R./AAAC Conductor & L.T. Line 1 Wire
conductors/ Coated conductor (All size) with new double pin
binding between two locations.
23 Re-stringing of 11 KV Aerial Bunch Cable (All size) between two Per
Removal / Dismantling of ex. HT / LT Line conductor (All Size) cond.
25 Straightening of tilted PSC Poles /Girder Poles. No.
26 Dismantling of guy set comp. with rod (If possible) etc. Set
27 Re-tightening in all respect of loose guy set. Set
28 Providing new guy insulator and tightening of guy set / Repairing Set
29 Trimming / Cutting of tree branches of obstructing HT/LT Line on Per Tree
Cutting of bigger size of tree branches/ whole tree obstructing
31 Providing 11 KV projection brackets in place of old V-X- Arm Set
32 Providing H.T. / L.T. projection brackets (Combined) in place of ex. Set
Old V-X Arm / L.T. X-Arm etc.
33 Providing LT projection brackets in place of old L.T. X-Arm etc. Set
34 Dismantling of exist. HT / LT projection brackets Set
35 Providing bracing angle set in ex. D.P. ( 4-Angles) Set
36 Straightening of tilted D.P. Set ( PSC / Girder pole) etc. with
refilling of stones, moram etc.
37 Laying of 11 KV power cable from 70mm2 to 225mm2 with
exaction of 3 Feet depth cable trench and refilling the same with Mtr
providing bricks layers and refilling the same with sand / moram up
to ground level as per specification.
38 -do-, additional cable in same tranche with additional bricks for Mtr
separating both cables
39 Re-activation of earthings of poles No.
40 Repairing and providing HT / LT Guarding with straightening of G.I.
Wire & providing lacings at 1 Mtr. dist. As per specification with Per Mtr.
using I - Rod etc.
41 Providing name of 11 KV fdr in "Gujarati" only on PSC / Girder
Poles with providing back ground colour on poles with two coats of No.
colour and size of letters to be 2 to 3" in approved ISI colour (Asian
Apeolite, Three Mengo including all materials.
42 Providing Pole No with S/S code No, S/Dn Code No. / Feeder
Code No. / T.C. Code No. etc. with back ground colour and height No.
of letters to be 2 to 3" I.S.I. approved colour (A.A. 3 Mengo)
including all materials.
43 Providing New 11 KV A.B./ G.O. Switch with fabrications and Set
insulated colour code jumpers / bindings lug etc.
44 Providing new 11 KV D.O. Fuse with fabrication and insulated
colour code jumpers / binding / lugs etc
45 Replacement of old 11 KV A.B. / G.O. Switch with providing new Set
insulated colour code jumpers / bindings / lugs etc.
46 Replacement of old 11 KV D.O. Fuse unit comp. No.
47 Providing C.C. ex. HT / LT Line Poles, Guy Sets etc. as per sp.
with all materials by contractors including cement in 1:2:4 ratio as
per specifications it also includes excavation &relevant works and Cmt.
muffing. (Cement Should Be Opc (53 Grade ) Used For
Sign & Stamp of the Bidder P a g e 1 |
48 Providing Muffing in stone masonry in cement mortar 1:5 for
X'mers as per sp. with all materials by contractors including cement
without excavation work. (Cement Should Be Opc (53 Grade) Used
For Concreting)
49 Only colour work on ex. Items. ( 2 coats ) of red oxide colour and two coats of silver colours
l.S.l. Asian Apcolite 3 mengo colour to be used.
50 V-X-Arm / Tapping Channel or Angle with all fitting. No.
51 L.T. -X-Arm + '-do- No.
52 H.T./L.T. Proj. brackets complete Set
53 H.T. Proj brackets Set
54 L.T. Proj. brackets Set
56 M.S.Girders 100x116 / Rail & Angle & Tubular Poles(9 to 13 Mtrs
Long) Excluding Fabricated Materials
57 M.S. Girders poles (150x150x11 to 13 Mtrs.) No.
58 D.P. Structure + All fabrications.(PSC Poles)-without Bracing No.
59 D.P. Structure + All fabrications.(PSC Poles)-with bracing No.
60 '-do- Transformer Structure set - PSC/Girder Pole. Set
61 Providing of XLPE hard coating on 34 mm2 AAAC conductor with 3 Km
62 Providing of XLPE hard coating on 55 mm2 AAAC conductor with 3 Km
63 Cost of drum in which party will return the Hard Core XLPE coated No.
64 Straightening of Transformer Centre No.
65 HT ABC Dismantling
(1)3x95mm2+1x8Omm2 Mtr
(2)3x7Omm2+1x7Omm2
66 Erection of Naked PSC Poles of 8 Mt./200 KG No.
67 Erection of Naked Steel Poles of 9 to 11 Mtr No.
68 Erection of Naked Steel Poles of 13 Mtr No.
69 Fixing of Pin Insulator with Pin rod with binding No.
70 Fixing of Disc Insulator with H/W with Binding No.
71 Dismantling of Pin Insulator With Rod No.
72 Dismantling of Disc Insulator With H/W No.
72 Dismantling of DP Angle/Channel with all fabrication, insulating No.
Materials etc. and crediting in Field/Divisional Store.
74 Fixing of L Top No.
75 Re-Fixing of Top fitting in Proper position No.
76 Replacement of Top Fitting No.
77 Refitting of LA No.
78 Converting pin point to Shackle Point including Dismantling a Location
restringing etc.
79 Plumbing of PSC pole with straightening at tension point No.
80 Carting of PSC Pole at Destination more than 5 Kms with prior
approval of EE of Division
81 Patrolling of LT/HT Line Et Submission of Summary Report Per Pole
82 Untie the knitting of the old AB Cable Mtr
83 D Type Jumper Per Pole
84 Replacement of D.O.Fuse Set
85 Burning of Thread of LT/HT line including cost of oil bamboo etc. Span
Note: Dismantled items should be credited in divisional store/RSO.
Sign & Stamp of the Bidder P a g e 1 |
(B) LT-LINE AND SERVICE CONNECTION MAINTENANCE WORK (Excluding GST)
All Rates are with Transportation charges / All material including - M.S. Nut-Bolts of all size will
be supplied by PGVCL / Paints Et Colour to be purchased by the contractors.
Item Unit Rate for
1 Replacement of LT X-Arm comp. & crediting in Store. Set
Replacement of LT Pin or shackle insulator by new one with
double binding and claiming etc.
3 Replacement of old deteriorated C - clamp No.
4 Re-binding of L.T. Pin / shackle insulator. No.
5 Providing spacer between L.T. Line conductor with binding etc. No.
Providing cage type loop guard in vertical L.T. Line with using
PVC real insulator etc.
Replacement of old jumpers by new thick insulator colour code
7 jumpers for bare conductor with using PVC Pipe and providing
8" long binding on each jumper.
Providing junction box or M.S. Box with wooden plate inside on pole with clamp etc.
8 including fixing of K.K. Fuses up to 63 Amp & Neutral link with giving cable
connections on poles and in fuses.
8.c More Than 5 Fuse with respect to item No. 8.b Per fuse
Replacement & Laying of O/H L.T. - PVC Cable for road/H.T.
Line/P&T Line/Crossing with using G.I. Wire No. 8/10 & PVC Real One
& Egg insulators etc. with connection of Lugs, etc. up to 70 Span
Replacement & Laying of O/H L.T. - PVC Cable for road / H.T.
Line / P&T Line / Crossing with using G.I. Wire No. 8/10 & PVC One
Real & Egg insulators etc. with connection of Lugs, etc. for 95 Span
11 Replacement of service lines with MMB & meters with all accessories as under:
1 Phase Connection
Replacement of service lines with Meter Box & meters by using
G.I. Wire No. 8/10, Real insulator at the distance of 1.0 Mtr.,
two nos. of egg insulator, wall fast, service angle, PVC Service
pipe etc. at equal vertical distance with giving connections of
11.aa -do-without meter box and meter No.
3 Phase Connection
Replacement of service lines with Meter Box & meters by using
11.b G.I. Wire No. 8/10, Real insulator at the distance of 1.0 Mtr. two No.
nos. of egg insulator, wall fast, service angle, PVC Service pipe
etc. at equal vertical distance with giving connections of service.
11.bb --do-- without meter box and meter No.
Sign & Stamp of the Bidder P a g e 1 |
12 Labour charge for replacement of Meter Box without meter.
12.a 1 Phase Conn. No.
12.b 3 Phase Conn. No.
13 Labour charge for replacement / providing of meter and Meter Box
13.a 1 Phase Conn. No.
13.b 3 Phase Conn. No.
14 Replacement of meter / providing only
14.a 1 Phase Conn. No.
14.b 3 Phase Conn. No.
15 Labour charge for installation of 3 phase Meter Box & 3 phase Meter on T.C. complete
in all respect including carting of materials from respective store as per instruction of
engineer in-charge.
15.a In City Area Set
15.b In Rural Area Set
16 Providing leads of service wires on L.T. Line with 8 to 10 turns with insulation and 8 to
10 turns of bare wire with L.T. Line conductor and providing insulated PVC tape on it.
16.a Per 1 Phase S/C. No.
16.b Per 3 Phase S/C. No.
17 Stringing of Twin wire No.
18 Single Phase Meter, SMC Et Service Shifting Work No.
19 Providing Pole SMC BUS-BAR No.
(Providing leads of service wires on on BUS BAR per service)
20 Providing Dropper ( 4mm/6mm Cable) No.
21 LT ABC Dismantling Mtr
22 LT ABC Dismantling Mtr
(1) 1x35rnm2 + 1x25mm2
23 LT ABC Re-Stringing Per
Note: Dismantled items should be credited in divisional store/RSO.
Sign & Stamp of the Bidder P a g e 1 |
(C) TRANSFORMER MAINTANANCE WORK (Excluding GST)
All Rates are with transportation charges / All material including - M.S. Nut-Bolts of all size will
be supplied by PGVCL / Paints Et Colour to be purchased by the contractors.
Item Unit Rate for
Replacement of old jumpers by new insulated cover cable
1 jumper/biding/lugs etc. etc. from L.A. to D.O. fuse or D.O. fuse to No
Replacement of old 200 KVA & above distribution box complete
2 with making all connections with crimping of lugs, tapping, No
Replacement of old up to 100 KVA distribution box complete with
making all connections (i.e.25,63,100)
Dismantling of existing distribution transformer centre up to 100 KVA with all
fabrication and crediting the old material in sub-Division/Division store(With
Girder Pole Set
Dismantling of existing distribution transformer centre above 100 KVA with all
fabrication and crediting the old material including Distribution Transformer in sub-
5 Division/Division store.
Girder Pole Set
Dismantling of Transformer Centre (8 Mtr PSC Pole)(without
6 Transformer) with crediting of fabrication at store a stacking of No.
pole safely on road side or Crediting to Departmental Store
Note: Dismantled items should be credited in divisional store/RSO.
Sign & Stamp of the Bidder P a g e 1 |
(D) DISCONNECTION AND RECONNECTION WORK (Excluding GST)
All Rates Are With Transportation Charges / All Material Including - M.S. Nut-Bolts Of All Size
Will Be Supplied By PGVCL / Paints Et Colour To Be Purchased By The Contractors.
Sr. No. Item Unit
Disconnection & Reconnection from LT Pole Single Phase S/C
City Area(Disconnection & Reconnection)(Payment will be No
made after receipt of RC Charges)
City Area(Only Disconnection ) No.
Rural Area(Disconnection & Reconnection) (Payment will be No.
made after receipt of RC Charges)
Rural Area(Only Disconnection ) No.
Disconnection & Reconnection from LT Pole Three Phase S/C
1 City Area(Disconnection & Reconnection) (Payment will be No
made after receipt of RC Charges)
City Area(Only Disconnection ) No.
Rural Area - Other than Ag. (Disconnection & Reconnection) No.
(Payment will be made after receipt of RC Charges)
Rural Area - Other than Ag. (Only Disconnection) No.
Rural Area - Ag. Connection (Disconnection & Reconnection) No.
(Payment will be made after receipt of RC Charges)
Rural Area - Ag. Connection (Only Disconnection) No.
Dismantling and removal of service line from pole and crediting in store Single Phase
2 Dismantling and removal of service line from pole and crediting in store Three Phase
Rural Area - Other than Ag. No.
Rural Area - Ag. Connection No.
Note: Dismantled items should be credited in divisional Store/RSO.
Total Estimated Tender Cost Rs. _____________________
Sign & Stamp of the Bidder P a g e 1 |
(F) For Laying of 11 KV underground cable (Excluding GST)
Description Unit
Excavation of trench 0.5 metre wide and 1 metre deep for laying of HT/LT
underground cable of size up to 300mm2 PILC or XLPE. (The cable should
be laid on bed of sand and to cover cable with half round RCC pipe 6"
1 internal dia. And length of 1 metre along with each bottom and top.) The Metre
entire trench thereafter should be refilled with earth duly rammed up to
ground level as per drawing No. PGVCL/Tech/UG Cable/01/2014-15.
(Pro-rata charges may be given for extra digging.)
Excavation of trench 0.75 metre wide and 1 metre deep for laying of
double HT/LT underground cable of size up to 300mm2 PILC or XLPE. (The
cable should be laid on bed of sand and to cover cable with half round RCC
2 pipe 6" internal dia. And length of 1 metre along with each bottom and Metre
top.) The entire trench thereafter should be refilled with earth duly
rammed up to ground level as per drawing No. PGVCL/Tech/UG
Cable/02/2014-15. (Pro-rata charges may be given for extra digging.)
Laying / re-laying of cable in cable trench and from ground level to Pole
structure for providing outdoor cable joints.
Laying / re-laying XLPE/PILC cable by digging of pits, removal of old cable
and laying of new cable on sand bed as per item No.1 above.
Widening & refilling with earth duly rammed the trench for laying
additional No. of cable. For Item No.1 above.
Add: Charges for digging of Tar road for laying of cables over and above
digging of pit in normal soil as per Sr.No.1.
Laying of underground 11 KV XLPE Cable by push and pool method
(Manual) through with HDPE Pipe 140mm diameter, 6mm thickness or 6"
or 4" diameter GI Pipe without damaging surface of the rod by Horizontal
boring / drilling method (excluding cost of HDPE Pipe or 6" or 4" GI Pipe) as
per drawing and specification. (Videography of work should be submitted
Laying of underground 11 KV XLPE Cable by push and pool method (by
Horizontal directional machine) through with HDPE Pipe 140mm diameter,
8 6mm thickness or 6" or 4" diameter GI Pipe without damaging surface of Metre
the rod by Horizontal boring / drilling method (excluding cost of HDPE Pipe
or 6" or 4" GI Pipe) as per drawing and specification.
Moulding of cable joints (straight joints, indoor and outdoor) for PILC Cable
- labour charges.
Moulding of cable joints (straight joints, indoor and outdoor) for XLPE
Cable - labour charges, for Urban area.
Moulding of cable joints (straight joints, indoor and outdoor) for XLPE
Cable - labour charges, for Rural area.
Moulding of cable joints (straight joints, indoor and outdoor) for LT PVC
Supply of HDPE pipe for laying 11 KV XLPE Cable 140mm diameter and
6mm thickness as per IS:
Supply of HDPE pipe for laying 11 KV XLPE Cable 100mm diameter and
14 6mm thickness as per IS: 4984. R-Metre
Sign & Stamp of the Bidder P a g e 1 |
Supply of half round RCC Hume pipe 6" internal diameter and length of
Supply of medium grade GI Pipe of size 6" diameter (including clamping the
cable with Pole)
Supply of medium grade GI Pipe of size 4" diameter (including clamping the
cable with Pole)
Supply of RCC Hume Pipe of 6" internal diameter for laying cable for
double circuit and road crossing.
Supply of sand 0.300 X 0.500 X 1.00 metre (layer at bottom of cable trench
approx. 0.15 CMT) as per Drg.No.PGVCL/Tech/UG Cable/01/2014-15
Supply of sand 0.300 X 0.750 X 1.00 metre (layer at bottom of cable trench
approx. 0.225 CMT) as per Drg.No.PGVCL/Tech/UG Cable/02/2014-15
Rate of Route Marker:
Providing, supplying & fixing route marker of C.C. 1:2:4, 150mm X 150mm
X 750mm concrete stone (PGVCL marked with approved yellow colour)
21 embedded in earth at least 300mm below the ground level and 450mm No.
above ground level at distance approximately 100 metre or as directed by
Engineer-In-Charge (this includes material and labour charges for
excavation and refilling.)
Dismantling of Under Ground Cable (Excavation and Refilling Earth
And credited to store without cutting/Damage the cable.)
Total Estimated Tender Cost Rs. _____________________
Sign & Stamp of the Bidder P a g e 1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.