Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47,838.98Qualified Make: D-Link
Model: NCB-FS09D-LCSC-3 102 SKILL AVENUE 5 10 191 HILL FORT ROAD SAIFABAD HYDERABAD | HYDERABAD | TELANGANA | 500004 | Make: D-Link
Model: NCB-FS09D-LCSC-3 | L1 | Qualified | |
| 2 | Disqualified Make: NA
Model: (NCB-FS09D-LCSC-3) 2 RANA SAMAY SINGH DURG MAHARANA PRATAPGARH KAKROLA VILLAGE SOUTH WEST DELHI DELHI 110078 | SOUTH WEST DELHI | DELHI | 110078 | Make: NA
Model: (NCB-FS09D-LCSC-3) | - | Disqualified | |
| 3 | Disqualified Make: IHT
Model: IHT-OPC-LCLCD3 IHT NARAYAN COLONY OLD POLICE LINE ARRAH BHOJPUR BIHAR 802301 | BHOJPUR | BIHAR | 802301 | Make: IHT
Model: IHT-OPC-LCLCD3 | - | Disqualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
10 Sept 2025, 4:00 pmClosed
Fiber Optic Patch Cord (Q3)
Small Form - Factor Pluggable Transceiver (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6580265 Dated : 25-08-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Fiber Optic Patch Cord Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
8233611
GEM/2025/B/6580265
Two Packet Bid
Fiber Optic Patch Cord
45 days
Medak
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
25 Aug 2025
25 Aug 2025
10 Sept 2025
Fiber Optic Patch Cord (Q3)
Small Form - Factor Pluggable Transceiver (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6580265 Dated : 25-08-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Fiber Optic Patch Cord Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8233611.pdf
GEM_BID
SCSFP_5518d050-5ad4-4de7-be441756116625569_BUIMMGPCS.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .