Loading…
Loading…
Tender Value
₹16.6 Cr
EMD Value
₹10 L
Closing Date
10 Sept 2026, 3:00 pm
Superintending Engineer, Central Circle, PWD
O/O the Superintending Engineer, Central Circle, PWD, Berhampore, Murshidabad
PORAGHATI MORE TO DOCTORKHANA MORE ROAD FROM 0.00 KMP TO 11.035 KMP STRENGTHENING WORK CARRIAGEWAY 3.75 MTR. INCLUDING 03 NOS. CULVERT REPLACEMENT, 310 MTR. PROTECTIVE WORK UNDER NADIA DIVISION, PWD IN THE DISTRICT OF NADIA RIDF-XXXII
2026_WBPWD_5018644_1
WB/PWD/SE/CC/e_NIT_02 OF 2026-27
Open Tender
CIVIL WORKS
Percentage
200 days
Nadia_West Bengal
Please refer Tender documents.
5 documents required · 5 mandatory
₹10 L
Yes
Office of the SE/CC/PWD
13 Aug 2026
13 Aug 2026
12 Sept 2026
20 Aug 2026
10 Sept 2026
20 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Pavement:
Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). Compensation for earth will vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth i.e. rs 43.00/m3 to be deducted from the Rate in Col. 4. The position is required to be clearly stated in the cost estimate.
(From Govt. land) | 19,821.47 | cum | 168.17 | ₹33,33,376.61 |
| 2 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (land own/arranged by the Agency) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been includedin the rate.
[Note : Royalty will be deducted from the Agency's bill as per Govt. rules]
Land arranged by agency. | 8,491.06 | cum | 220.72 | ₹18,74,146.76 |
| 3 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
By Mechanical Means
Bituminous course | 3,165.66 | cum | 312.86 | ₹9,90,408.39 |
| 4 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with
Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301) | 5,058.64 | cum | 85.55 | ₹4,32,766.65 |
| 5 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate conforming to the grading of table 400- 13 revised vide table 2 of IRC : 109 (2015) to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density .The thickness of a single compacted layer shall not be less than 75 mm.(Reference to MoRT&H's specification 406.
Using Pakur Variety Stone Aggregates.
(Payment will be made on the basis of finished compacted volume) | 0.4 | cum | 4,392.2 | ₹1,756.88 |
| 6 | Prime Coat
Providing and applying primer coat with cationic bitumen emulsion SS1 grade conforming to IS:8887 on prepared porous granular surface including clearing of road surface and spraying primer using mechanical means (Reference to MORT&H's specification clause 502).
On WMM/WBM surface @ 0.85kg /sqm. Using Cationic CSS-1(H)
(Payment will be made on the basis of finished surface area) | 1 | sqm | 80.64 | ₹80.56 |
| 7 | Tack Coat
Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503).
On bituminous surface @ 0.25kg /sqm Using Cationic RS
(Payment will be made on the basis of finished surface area) | - | sqm | 24.04 | - |
| 8 | Tack Coat
Providing and applying tack coat with Cationic bitumen emulsion (RS1) complying with IS:8887 using emulsion pressure distributor on the prepared bituminous/granular /cement concrete pavement surface cleaned with mechanical broom and high pressure air jet (Reference to MORT&H's specification clause 503).
On Granular surface treated with primer @ 0.275 /sqm. Using Cationic RS
(Payment will be made on the basis of finished surface area) | 1 | sqm | 26.39 | ₹26.36 |
| 9 | Dense Graded Bituminous Macadam
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP using crushed aggregates (Pakur variety) of specified grading, premixed with bituminous binder of approved grade @ 4.0% (min) for Grading -1 and 4.5% (min) for Grading -2 by weight of total mix and filler(Cement /hydrated lime / Rock dust ) as per table 500-10 and mix design done as per table 500- 11and job mix formula as per clause 505.3.3 transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory tandem roller and with pneumatic tyre roller of 12 to 15 tonne weight with a pressure at least 0.56 MPa as directed by E-I-C, and to achieve the desired compaction as per MORT&H specification clause No. 505.3.5 complete in all respects (Reference to MORT&H's specification clause 505).
For Grading 2 (26.5 mm nominal maximum aggregate size ) Layer Thickness 50-75mm
using Bulk Bitumen VG-40
(Payment will be made on the basis of finished compacted volume) | 0.6 | Cum | 17,240.26 | ₹10,326.92 |
| 10 | Bituminous Concrete
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant using crushed aggregates (Pakur variety) of specified grading, premixed with bituminous binder of approved grade@ 5.2% (min) for Gr.-1 & @ 5.4% (min) for Gr.-2 , as per table 500-17, and mix design done as per table 500-10 and job mix formula as per cl. 505.3.3 and filler(Cement /hydrated lime / Rock dust ), transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory tandem roller and with pneumatic tyre roller of 12 to 15 tonne weight with a pressure at least 0.56 MPa as directed by E-I-C to achieve the desired compaction as per clause no 507.3.5 complete in all respects ref. to MORTH specification clause No.507.
For Grading-2 ( 13.2 mm nominal maximum aggregate size), Layer thickness:30-40mm
using Bulk Bitumen VG-40
(Payment will be made on the basis of finished compacted volume) | 0.6 | Cum | 19,547.75 | ₹11,728.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
2911_ii.pdf
Tender Documents • 1.86 MB
BOQ_5089869.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].