S.K.Panja
Office of the Project Officer,WJ Area
Transportation of one pony belt drivehead from E-9 BG,4th DR JN. and installation of Pony belt drivehead(P5) at 525m chainage from 10th DR jn. In D-19 BG, of XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area
2026_BCCL_353049_1
BCCL/WJA/MND/SUR/2025-26/78
Open Tender
Miscellaneous Works
50 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹16,488
26 Mar 2026
13 Feb 2026
28 Feb 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
Transportation of one pony belt drivehead from E-9 B/G,4th D/R JN. and installation of Pony belt drivehead(P5) at 525m chainage from 10th D/R jn. In D-19 B/G, of XVI(T) seam at 500MH in Moonidih Colliery, W.J. Area
Transportation of Drive frames, gear box,Jib drum,Motor,Starter of pony drivehead from E-9 B/G,4th D/R jn. To D-18 T/G,9th D/R jn. Via track &Haulages on 5 arm trolleys(including loading &unloading). Analysis: No. of Arm trolleys required = 5 Manshift required/Arm trolley = 8 unskilled (including loading & unloading) for 2 shifts. Cost/Arm trolley = (8*1367.6)*2 =Rs.21881.6/Trolley
Manual Transportation of jib drum,gear box,motor of pony drivehead from D-18 T/G,9th D/R jn. to 525m inside D-19 B/G face i.e.Total distance=675m Analysis: Manshift required for manual transportation of one item/60m =10 unskilled manshift/shift Cost/mt/item= 10*1367.60/60 =Rs.227.9/mt/item Total items=3 no.;Therefore cost/mt=(Rs 227.9 *3)=Rs 683.7/mt
Manual Transportation of Drive frames of pony drivehead from D-18 T/G,9th D/R jn. to 525m inside D-19 B/G face i.e.Total distance=675m Analysis: Manshift required for manual transportation of pony frames =8 unskilled manshift/shift Cost/shift= 8*1367.6 =Rs.10940.8/shift
Manual Transportation of starter and starting cable of pony drivehead from D-18 T/G,9th D/R jn. to 525m inside D-19 B/G face Analysis: Manshift required for transportation of starter =8 unskilled manshift/shift Cost/shift= 8*1367.6 =Rs.10940.8/shift
Manual Transportation of one tail end drum & frame from D-18 T/G,9th D/R jn. to 525m inside D-19 B/G face i.e.Total distance=675m Analysis: Manshift required for manual transportation of one item/100m =10 unskilled manshift/shift Cost/mt= 10*1367.60/100 =Rs.136.76/mt
Installation of Pony Drivehead at D-18 T/G 9th D/R jn. Analysis: Unskilled manshift required/shift=8 cost/shift=(8*1367.6)=Rs10940.8
Transportation of 2 no. of 110 kw motors from 7th D/R jn. Of 400mh main line to 10th D/R jn. Of D-18 B/G via track & Haulages. Analysis:No. of arm trolleys required=2 Manshift required/arm trolley=6 unskilled Cost/arm trolley=6*1367.6=Rs 8205.6/arm trolley
Manual Transportation of 2 no. of 110 kw motors from 10th D/R jn. Of D-18 B/G to 10th dip belt drive head. (i.e.50m) Analysis:manshift required/20m of manual transport=8 unskilled Cost involved/mt=[(1367.6.6x8)/20]x2=Rs.1094.08/m
Manual Transportation of 2 no. of burnt 110 kw motors from 10th dip belt drive head to 10th D/R jn. Of D-18 B/G (i.e.50m) Analysis:manshift required/20m of manual transport=8 unskilled Cost involved/mt=[(1367.6.6x8)/20]x2=Rs.1094.08/m
Transportation of 2 no. of burnt 110 kw motors from 10th D/R jn. Of D-18 B/G to 7th D/R jn. Of 400mh main line via track & Haulages. Analysis:No. of arm trolleys required=2 Manshift required/arm trolley=6 unskilled Cost/arm trolley=6*1367.6=Rs 8205.6/arm trolley
Cleaning of muck and debris for installation of loop take up arrangement in 10th dip belt conveyor.i.e. 15x2x1.5=45m3. Analysis : For 4m3 cleaning=3 unskilled i.e( 3 x 1367.60)/4=Rs.1025.7/m3
Transportation of Loop Take up structure, Drums and winch from 7th D/R jn. Of 400mh main line to 10th D/R jn. Of D-18 B/G via track & Haulages. Analysis:No. of arm trolleys required=6 Manshift required/arm trolley=6 unskilled Cost/arm trolley=6*1367.6=Rs 8205.6/arm trolley
Manual Transportation of Loop Take up structure, Drums and winch from 10th D/R jn. Of D-18 B/G to 10th dip belt drive head. (i.e.50m) Analysis:manshift required/shift for manual transport=8 unskilled/shift Cost involved=(1367.6.6x8)=Rs.10940.8/shift
Installation of Loop take up arrangement in 10th D/R belt drive head. Analysis:manshift required/shift for manual transport=8 unskilled/shift Cost involved=(1367.6.6x8)=Rs.10940.8/shift
Laying & fitting of a 200m,1200mm belting on 10th D/R conveyor belt Analysis:manshift required/shift =14 unskilled/shift Cost involved=(1367.6.6x14)=Rs.19146.4/shift
Laying & fitting of a 230m,1000mm belting on P3 conveyor belt in D-19 B/G. Analysis:manshift required/shift =14 unskilled/shift Cost involved=(1367.6.6x14)=Rs.19146.4/shift
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_365843.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid