Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.2 Laccepted-aoc | ₹6.2 L | accepted-aoc |
Tender Value
₹8.0 L
EMD Value
₹7,983
Closing Date
16 Jul 2026, 5:00 pmClosed
Executive Engineer RWS&S Division, Kakinada
Kakinada
Providing Drinking Water Facility to KAUDA Beach Park in Kakinada Rural Mandal of Kakinada Distirct, Est.Cost.10.00 Lakhs
960041
1st Call No.5/26-27, Dt.04.07.2026
OPEN - NCB
Water Supply
KAKINADA
9 documents required · 9 mandatory
₹283
₹7,983
14 Aug 2026
10 Jul 2026
10 Jul 2026
Cost,Supply and fixing of 75mm dia HDPE-6kg/cm2 Pipes and specials including cost and conveyence of all labour charges etc complete for finished item of work.
Earth work excavation for 75mm dia HDPE-6kg/cm2 Pipes pipe line trences ( 2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and Jointing of pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test 2 pressure etc. complete for finished item of work.
Laying and jointing of 75mm dia HDPE-6kg/cm2 Pipes pipe line pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test 2 pressure etc. complete for finished item of work.on Bridge
Cost Supply & Delivery of Tamper Proof DI Flanged Single Chamber Air Release Valves with body & cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG- 500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005. All internal parts such as Float, shell, Cove Bolts etc. made of Austenitic alloy steel of SS AISI 304/316 and DN 50 float of and other components with ABS/PTFE/EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination Flange drilling as per IS - 1538 and exclusive of all taxes and transportation. 40mm Air valves PN 1.6 on HDPE Mains
Supply and Transportation of 1.5HP Single phase open well submersible motor pump set confirms to IS 14220 : 1994. Makes: As per list of recommended brands as category I etc complete.
S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
Fabrication , transportation and supply of suitable size panel board for single phase submersible motor up to 1.5 HP consisting of relay, Contactor, starting and running capacitors, Voltmeter, Ammeter, indicator lamps, MCB , on/off switch including supply and fixing of DOL starter of complete., Makes: As per list of recommended brands.
Cost and supply and fixing of 3 Core 2.50 sqmm flat Copper Cable wire including cost of all charges
Provision for Sump Cleaning charges including cost of all charges etc.,complete Manmazdoors
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Filling the Foundation with gravel including cost,conveyance ,watering and ramming etc complete. For c-footings
CC(1:4:8)using 40 mm HBG metal icluding Cost and conveyance of the all materials etc complete.
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Columns footing.
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Columns
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Beams
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Roof Slab with75 mm Thick
Brick Masonary with CM(1:6) using Second Class Bricks including cost and conveyance of all the materials etc complete
Cement plastering with CM(1:5),12mm thick including cost and conveyance of all the materials ect complete.
Accoproof plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ect complete.
Flooring with CC(1:4:8) using 40mm HBG metal for 100mm thick and Top plastering with CM(1:3) ,20mm thick including cost and conveyance of all the materials ect complete.
Painting With White Cement two coats including cost and conveyance of all the materials ect complete. Inside and Ceiling
Snowcem painting including cost and conveyance of all the materials ect complete. Out Side
Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in all Soils ( SS 20-B) including all operational incidental labour charges, complete for finished item of work including seignerage charges excluding dewatering charges etc., for footings to Tank Pedestals
PCC(1:4:8) using 40 mm size HBG granite metal in cluding cost and conveyence of all materiels and labour charges etc. for footings leveling course
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for footings
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for Columns up toslab
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for roof beam
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for for roof slab(200mm thick)
Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, complete for finished item of work. tank protection walls
Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.out side plastrings-a/r
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.
Painting with Snowcem paint two coats including cost and conveyence paint of single coat of approved make and quality over a sigle coat of white cement coat including cost and conveyence of all materiels and labour charges.
Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank of Double layer Roto moulded confirming to IS:12701 approved brand & manufacture with suitable cover/cap and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
Cost,Supply and fixing of 75mm dia HDPE-6kg/cm2 Pipes and specials including cost and conveyence of all labour charges etc complete for finished item of work.
Earth work excavation for 75mm dia HDPE-6kg/cm2 Pipes pipe line trences ( 2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and Jointing of pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test 2 pressure etc. complete for finished item of work.
Laying and jointing of 75mm dia HDPE-6kg/cm2 Pipes pipe line pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test 2 pressure etc. complete for finished item of work.on Bridge
Cost Supply & Delivery of Tamper Proof DI Flanged Single Chamber Air Release Valves with body & cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG- 500/7 or Equivalent as per IS1865, IS:3896-2 with Food Grade Epoxy Powder Coating(EP-P) (Min:250 Micron) inside and Outside of Color Blue RAL 5005. All internal parts such as Float, shell, Cove Bolts etc. made of Austenitic alloy steel of SS AISI 304/316 and DN 50 float of and other components with ABS/PTFE/EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination Flange drilling as per IS - 1538 and exclusive of all taxes and transportation. 40mm Air valves PN 1.6 on HDPE Mains
Supply and Transportation of 1.5HP Single phase open well submersible motor pump set confirms to IS 14220 : 1994. Makes: As per list of recommended brands as category I etc complete.
S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete
Fabrication , transportation and supply of suitable size panel board for single phase submersible motor up to 1.5 HP consisting of relay, Contactor, starting and running capacitors, Voltmeter, Ammeter, indicator lamps, MCB , on/off switch including supply and fixing of DOL starter of complete., Makes: As per list of recommended brands.
Cost and supply and fixing of 3 Core 2.50 sqmm flat Copper Cable wire including cost of all charges
Provision for Sump Cleaning charges including cost of all charges etc.,complete Manmazdoors
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
Filling the Foundation with gravel including cost,conveyance ,watering and ramming etc complete. For c-footings
CC(1:4:8)using 40 mm HBG metal icluding Cost and conveyance of the all materials etc complete.
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Columns footing.
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Columns
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Beams
VRCC(1:1.5:3) using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Roof Slab with75 mm Thick
Brick Masonary with CM(1:6) using Second Class Bricks including cost and conveyance of all the materials etc complete
Cement plastering with CM(1:5),12mm thick including cost and conveyance of all the materials ect complete.
Accoproof plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ect complete.
Flooring with CC(1:4:8) using 40mm HBG metal for 100mm thick and Top plastering with CM(1:3) ,20mm thick including cost and conveyance of all the materials ect complete.
Painting With White Cement two coats including cost and conveyance of all the materials ect complete. Inside and Ceiling
Snowcem painting including cost and conveyance of all the materials ect complete. Out Side
Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in all Soils ( SS 20-B) including all operational incidental labour charges, complete for finished item of work including seignerage charges excluding dewatering charges etc., for footings to Tank Pedestals
PCC(1:4:8) using 40 mm size HBG granite metal in cluding cost and conveyence of all materiels and labour charges etc. for footings leveling course
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for footings
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for Columns up toslab
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for roof beam
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size hard blasted granite machine crushed graded metal from approved quarry,including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for for roof slab(200mm thick)
Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, complete for finished item of work. tank protection walls
Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.out side plastrings-a/r
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.
Painting with Snowcem paint two coats including cost and conveyence paint of single coat of approved make and quality over a sigle coat of white cement coat including cost and conveyence of all materiels and labour charges.
Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank of Double layer Roto moulded confirming to IS:12701 approved brand & manufacture with suitable cover/cap and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
Number of Items Thirty Four Only
Construction of 20 KL OHSRs of 9.4 mtrs staging with M30 grade design mix in the habitations and locations selected by the department , as per drawings and as specified in Technical Specifications including earth work excavation in all types of soils in wet or dry conditions for foundations including cost and conveyance of all materials, cost and fabriation of steel, fixtures, labour charges and testing the reservoir for water tightness etc., complete for finished item of work as per the Standard Specifications and as per the provisions made in the current SOR 2020-21. The rate is inclusive of cost of all materials and labour charges and all taxes, duties and levies, etc., complete for finished item of work, but excluding GST and Seigniorage charges, including Overheads and Contractors Profit @13.615%. 1). All concrete members shall be designed with M30 grade design mix. 2) Rate is for OHSRs with RAFT FOUNDATION 3) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir including roof. 4) Rate inclusive of 2 coats of weather proof emulsion painting for external surfaces, lettering as per Department direction, all required fixtures,CI D/F pipes, bends, DI D/F Gate Valves PN1.6 for outlet and scour etc., for pipe connections including cost of pipes, bends and valves as per departmental designs and drawings. 5) The above rates are applicable for basic wind speed of 150 KMPH . Fixtures include : a) RCC or Aluminium ladder inside reservoir of 0.60 m wide. b) Spiral staircase on the outside shall be provided c) Lightening arrestor of approved pattern, including conductor and earthling etc., d) RCC ventilators with copper or stainless steel fly proof mesh. e) D.I Manhole cover with frame of 0.60x0.60m as per IS specifications (light duty) - 2 Nos. f)Water level indicator of good quality with ebonite/copper float of approved pattern-1 No. g) Railing with Stainless Steel of grade 304 in two rows around OHSR fixed in RCC (1:2:4) of post of size 100x75x75mm with 1.5m intervals around the pheriphary on top of OHSR for a height of 1.20 Mtrs. i) D.I swan neck ventilators shall be provided in top dome and slab. j). Bed Blocks of 0.45m x 0.45m x 0.30m in CC M15 Mix below all the duck foot bends k) The rates are inclusive of CI verticals for all inlet, out let, overflow and scour connections( as per estimate diameters) and D.I valves. All valves near out let and for scour shall be D.I valves of heavy duty conforming to the specification of SoR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ DWF to Beach Park.xlsx
TENDER_DOCUMENT • 0.68 MB
General conditions.doc
TENDER_DOCUMENT • 0.04 MB
modified DWF to Beach Park.xlsx
TENDER_DOCUMENT • 0.08 MB
Part - A Vol-I (General) Conditions.doc
TENDER_DOCUMENT • 0.27 MB
Part B Vol I.doc
TENDER_DOCUMENT • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .