Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-Finance | ₹11.0 L | L1 | Accepted-Finance ACCEPT |
| 2 | L2₹13.1 L+₹2.1 L (19.4%)Accepted-Finance | ₹13.1 L+₹2.1 L (19.4%) | L2 | Accepted-Finance ACCEPT |
| 3 | L3₹14.2 L+₹3.2 L (29.4%)Accepted-Finance | ₹14.2 L+₹3.2 L (29.4%) | L3 | Accepted-Finance ACCEPT |
| 4 | L4₹14.2 L+₹3.2 L (29.6%)Accepted-Finance | ₹14.2 L+₹3.2 L (29.6%) | L4 | Accepted-Finance ACCEPT |
| 5 | L4₹14.2 L+₹3.3 L (30.1%)Accepted-Finance | ₹14.2 L+₹3.3 L (30.1%) | L4 | Accepted-Finance ACCEPT |
Tender Value
₹20.3 L
EMD Value
₹40,580
Closing Date
17 Jul 2026, 4:00 pmClosed
Executive Engineer I and FC Divsion Nowshera
Executive Engineer I and FC Divsion Nowshera
Construction of Flood Protection Work along Shiv Khori Nallah, Saleri Nallah, Hathal- B Nallah and Thandapani Tawi (Part-II)
2026_IFC_315445_2
e-NIT NO. 07 OF 2026-27
Open Tender
Civil Works
Percentage
75 days
Sunderbani
As per e-NIT
4 documents required · 4 mandatory
₹1,500
Executive Engineer I and FC Divsion Nowshera
₹40,580
21 Jul 2026
11 Jul 2026
18 Jul 2026
11 Jul 2026
17 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge.All kinds of soil : | 339.3 | cum | 187.3 | ₹63,550.89 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 958.5 | cum | 371.15 | ₹3,55,747.27 |
| 3 | Supply of Stone 85% of qty 02&03 (15% deduction in qty due to air voids) but qty has been restricted | 791.39 | cum | 700 | ₹5,53,973 |
| 4 | Carriage of material avg.17KM by machanical Transport & 250m by Head load | 791.39 | cum | 829.39 | ₹6,56,370.95 |
| 5 | Add for supply of supply of wired crate of size (6mxl.5mxl.5m) and B/wire 4mm @2.0kg/No of creates including all carriages up to site of work. | 71 | No. | 5,620 | ₹3,99,020 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1023389.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .