Construction of RCC Drain Channel from Rahiyad Village to River Bank , Rahiyad, Bharuch
286726
NARDES/CIVIL/TN/2026-27/03
Open
Civil Works
Works
Bharuch
₹4.3 L
20 Mar 2026
20 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
The quantity indicated against each item in the Schedule of Rates is only
tentative and is likely to increase/decrease to any extent during the contract
and the Company shall not be obliged to entertain any complaint or claim what
so ever in this regard from the Contractor.
The quantum of work/job would vary/fluctuate depending upon the market
requirements/ demands from time to time. The Company reserves its right not
to operate at all or partially operate any of the items of work listed in the
schedule of Rates during the Contract and the company shall not be obliged
to entertain any complaint or claim what-so-ever in this regard from the
6. PAYMENT TERMS:
6.1 On satisfactory completion of the work, the contractor shall prepare and
submit bill in duplicate along with all relevant and supporting papers for
the respective month to the Engineer-in-charge / Officer-in-charge of the
work. The payment of the bills shall be made on monthly basis by
NEFT/RTGS/Cheque after usual deduction of applicable taxes and other
dues as per the rules.
6.2 The bill will be paid within 30 days provided the same is complete in all
respects. Such payment shall be made after completion of the calendar
month and after submission of a certificate from the Engineer-in-charge
/ Officer-in-charge duly recommended by him to the effect that the work
carried out by the contractor during the month is as per the contractual
obligations and to the entire satisfaction.
6.3 The payment of running bills/final bill by the Company shall not have any
linkage with the payment of wages and other dues to be made by the
contractor to his deployed manpower. In other words, the contractor shall
discharge from time to time his liabilities for payment of wages and other
dues to his deployed manpower irrespective of receipt of payment of
running bills/final bill from the Company.
6.4 The final bill should be submitted along “No claim Certificate “from you.
6.5 The payment towards the Final Bill will be released after 90 days of
submission of the Final Bill / Completion of the defect liability period.
6.6 In case the Contractor abandons the site during the currency of the
contract, the Contractor might have done no payment what so ever shall
be released even for the partial work that. The company shall have also
right to forfeit the amount of Retention Money & Security Deposit.
7. TAXES AND DUTIES:
Bidder to clearly mention all applicable taxes and duties in Schedule of Rates,
on supply of goods and / or services to be made
8. SECURITY DEPOSIT:
In the event of award of Contract, the successful Bidder will submit Security
Deposit at time of acceptance of contract/agreement in the form of BG
/DD/RTGS .Which shall be valid till faithful execution of contract plus 3 months
claim period for an amount equivalent to 7 % of total contract value including
taxes and duties. Contractor shall furnish Bank Guarantee (BG) in GNFC’s
standard ready-made format only, within 10 days from the date of issue of
Work Order/ detailed Contract as per GCC terms and condition Security
Deposit/ Bank Guarantee shall be released after upon satisfactory
performance of the contract and completion of the defect liability period. In
case extension is granted the Contractor shall accordingly furnish SDBG for
further period of Contract.
9. SUB CONTRACTING:
The Contractor shall not assign or transfer whole or part of the contract
awarded, or whole or part of works, services, obligations, responsibilities,
liabilities and rights or give a sub-contract for carrying out all or any of the
work, service, obligation, responsibility, liability and right, to any other person
or party without Company’s prior written consent.
10. ALTERATION IN SCOPE OF WORK:
The Company may at any time(s) before or after the commencement of the
work by notice in writing issued to the Contractor, alter the scope of work by
increasing or reducing the jobs required to be done by the Contractor or by
adding thereto or omitting there from any specific jobs or operations or by
substituting any existing jobs or operations with other jobs and/or operations,
or by requiring the Contractor to perform any extra works in or about the job
site. And upon receipt of such notice the Contractor shall execute the job(s)
as required within the altered scope of work.
11. PERFORMANCE OF THE CONTRACT:
11.1 The Contractor shall arrange to deploy adequate manpower with
required skill & experience to execute the job smoothly, safely & as per
the schedule &/or frequency.
11.2 The Contractor shall deploy supervisor/s for (I) to coordinate with
Engineer-in-Charge / Officer-in-Charge for job execution (ii) assignment
of the job & to pass on instructions to the manpower deployed by the
contractor for execution of job (iii) effective supervision of the job (iv) to
ensure that manpower deployed by the contractor are carrying out the
job safely, using proper safety appliances / wearing proper Personal
Protection Equipment, maintaining peace & discipline & observing safety
& security regulations & instructions. (v) To ensure that manpower
deployed by the contractor are not tampering with or operating any
machinery / equipment of the plant.
11.3 The manpower deployed should be engaged for the specific work under
the contract & should not be deployed in other jobs.
11.4 The Company shall have a right to terminate the contract / to split the job
/ to get done the work from another agency at the risk & cost of the
contractor, if not deploying adequate manpower / not carrying out the job
as per time schedule / any job is not properly done.
11.5 The contractor shall keep & maintain area neat & clean all the time.
12. CANCELLATION OF CONTRACT:
12.1 The Company shall be entitled at any time at its discretion to cancel the
Contract if, in the opinion of the Company, the cessation of the work has
become necessary owing to any cause, what so ever.
12.2 The Contractor shall not be entitled for any compensation, whatsoever,
in addition to the payment for the work actually performed by the
Contractor, calculated on the basis of the Schedule of Rates.
13.1 The Contractor shall at all times indemnify and keep indemnified the
Company and its officers, servants and agents from and against all third
party claims whatsoever (including but not limited to property loss and
damage personal accident, injury or death of/to property or person of any
Sub-Contractor and/or the servants or agents of the Contractor, and
Sub-Contractor(s) and/or the Company) and the Contractor shall at his
own cost and initiative at all times hereof take out and maintain insurance
policies in respect of all insurable liabilities under Employee’s
Compensations Act 1923 and all other applicable Labour laws, including
but not limited to third party insurance and Act. Personal injuries
insurance Act, etc.
13.2 The Contractor shall also at all times indemnify and keep indemnified the
Company and its officers / employee of the company including Engineer-
in-Charge/ Officer-in-charge against all actions, proceedings, claims,
demands, cost & expenses whatsoever arising due to failure of the
contractor in the performance of his obligations under the contract.
13.3 The Company shall not be liable for or in respect of any demands or
compensation payable under any law in respect of or in consequence of
any accident or injury to any workman or other person in the employment
of the contractor or his sub-contractor and the Contractor shall indemnify
& keep indemnified the Company against all such damage and
compensation and against claims, demands, proceedings, costs,
charges & expenses whatsoever in respect thereof or in relation thereto.
14. PENALTY FOR DELAY/ DEFAULT:
A. FOR DELAY IN STARTING THE JOB:
The penalty shall be imposed to the contractor, for delay in initiation of
the assigned work. If the contractor fails to initiate the job within permitted
mobilizing time limit, the penalty of Rs. 500/- per day shall be imposed to
him. However, in case of emergency or breakdown jobs, the contractor
shall mobilize his team immediately and no mobilizing time shall be given
in such condition.
B. FOR NON COMPLIANCE OF SAFETY RULES:
The penalty shall be imposed for non-compliance as under:
• Non wearing of safety shoes: Rs.250/-per incident per person
• Non wearing of safety helmet / not using required PPE: Rs.250/- per
incident per person
C. FOR POOR WORKMANSHIP:
As decided by Engineer-in Charge / Office-in-charge including no
payment of claim shall be paid to the contractor.
15. SUSPENSION OF CONTRACT:
In appropriate case, the Company may at its discretion, instead of terminating
contract for breach of any terms or conditions by Contractor, suspend the
contract for specified period. In case the contract is so suspended, Contractor
will be under obligation to reimburse the Company for damages or loss
suffered by the Company on account of Company making alternative
arrangement during period of suspension of contract and if the Contractor fails
to reimburse such loss or damages, the same will be recovered from the
Security Deposit or any other payment to be made to the Contractor under the
contract with the Company.
16. TERMINATION:
16.1 Company may, without prejudice to any other remedy for breach of
contract, by written notice of 30 days of default sent to the Contractor,
terminate the Contract in whole or in part if the Contractor fails to perform
any other obligation(s) under the Contract;
16.2 If the Contractor goes bankrupt or goes into liquidation.
16.3 In the event of termination of contract by the Company on account of
breach of any terms and conditions of the contract by the Contractor the
entire Security Deposit Bank Guarantee given by the Contractor will
liable to be forfeited.
16.4 The Company may at its discretion, terminate the contract by giving a
notice of 30 days, for convince, at any time, without assigning any
reasons, whatsoever.
17. PAYMENT UPON TERMINATION:
If the Contract is terminated because of a breach of Contract by the
Contractor, the Company shall process payments due to Contractor less all
required deductions. If the total amount due to Company exceeds any
required deductions. If the total amount due to Company exceeds any
payment due to the Contractor, the difference shall be a debt payable by
Contractor to the Company and the same may be recovered from Security
Deposit and/ or any other dues payable by the Company to the Contractor.
18. DEFECT LIABILITY PERIOD AND LATENT DEFECTS:
Defect liability period for works unless otherwise specified shall be 12 month
and/or rectify any and all defect(s) and/or months from the date of issue of
Completion Certificate and the Contractor shall at his own cost and initiative,
correct, repair imperfections in the work as shall be discovered during the said
defect liability period and in the event of the Contractor failing to do so the
Company shall be entitled for compensation from the Contractor.
19. GOVERNMENT REGULATIONS:
The Contractor shall comply with and ensure strict compliance by his / its sub-
contractors, servants and agents of all applicable Central, State, Municipal
and Local Laws and regulation / notifications of any Central, State or Local
bodies and authorities and undertakes to indemnify the Company from and
against and levies, damages, penalties and payments whatsoever as may be
imposed by reason of any breach or violation of any law, rule or regulation
whatsoever and all actions, claims and demands arising there from and / or
relative thereto.
GNFC strongly opposes sexual harassment and any such behaviour against
women is prohibited by the law as set down in “The Sexual Harassment of
Women at Workplace (prevention, prohibition and Redressed) Act, 2013”
and Rules framed there under being The Sexual Harassment of Women at
Work place Rules.
You shall ensure compliance of Gujarat Professional Tax Act, 1976 and
required to deduct Professional Tax as applicable from the wages to be paid
to your workers & required to deposit the same to the appropriate authority.
20. COMPLIANCE WITH LABOR & SAFETY REGULATIONS:
During the continuance of the Contract, the Contractor shall abide at all times
by all existing Labour enactments and rules made there under, such as
Minimum wages Act, E.P.F Act etc., regulations, notifications and bye laws of
the State or Central Government or local authority and any other Labour law
(including rules), regulations, bye laws that are in force or may be passed or
notification that may be issued under any Labour laws in future either by the
State or the Central Government or the local authority. The Contractor shall
keep the Company indemnified against and/or on account of contravention of
any of the provisions of any Act or rules made there under, regulations or
notifications including amendments.
If the Company is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for non-observance of the provisions
stipulated in the notifications/bye laws/Acts/ Rules/ regulations including
amendments, if any, on the part of the Contractor, Company shall have the
right to deduct all such sums from any money due to the Contractor including
his amount of security. The Company shall also have right to recover from the
Contractor any sum required or estimated to be required for making the loss
or damage suffered by the Company. The employees of the Contractor in no
case shall be treated as the employees of the Company at any point of time.
21. FORCE MAJEURE:
In the event that performance under the Contract, in the reasonable opinion
of either party (Company & Contractor) is made impossible by force majeure
like war, hostilities, revolution, civil commotion, strike, epidemic, accident,
wind, fire, flood, or because of any law, order, proclamation, regulation or
ordinance of any Government, or of any subdivision thereof or because of any
act of God, quarantine restrictions, epidemics, etc. then either party shall so
notify the other in writing. If such force majeure circumstances continue for
more than three months then either party may terminate the Contract, or
complete performance of the Contract with such adjustments as are required
by the existence of the force majeure and are agreed upon by the parties.
22. DISPUTE RESOLUTION:
22.1 All disputes or difference(s) whatsoever which shall at any time arise
between the parties hereto touching or concerning the works or the
execution or maintenance thereof of this Agreement/ Contract/ Work
Order/ Purchase Order/ Service Order or the rights touching or
concerning the works or the execution or maintenance thereof of this
Agreement/ Contract/ Work Order/ Purchase Order/ Service Order, of
the construction meaning operation or effect thereof or to the rights,
liabilities of the parties or arising out of or in relation thereto whether
during or after completion of the Agreement/ Contract/ Work Order/
Purchase Order/ Service Order or whether before or after determination,
foreclosure or breach of the Agreement/ Contract/ Work Order/ Purchase
Order/ Service Order, shall be referred by the disputing Party, in writing
to the other Party, within 30 days of occurrence of such event, to resolve
any such dispute or difference.
22.2 If such dispute mentioned above is not resolved amicably by direct
informal negotiation, within a period of 30 days, then such dispute/
difference shall be referred to the Engineer-In-Charge/ Additional
General Manager of the concerned department of GNFC. Engineer-In-
Charge/ Additional General Manager shall give its decision within 30days
of the reference of the dispute to him.
22.3 If any Party serves an Arbitration Notice in respect of any dispute to the
Appointing Authority, the dispute shall be finally settled by arbitration
under the Indian Arbitration and Conciliation Act, 1996 (“Act”) and all
statutory amendments, modifications thereof and the rules made there
under, or any other corresponding law for the time being in force, by the
Sole Arbitrator to be appointed as hereinafter provided.
22.4 Within 30 days of receipt of Arbitration Notice, the Appointing Authority
shall appoint the Sole Arbitrator, who shall be a retired employee of
GNFC, not below the rank of General Manager and who shall be qualified
to be appointed as an Arbitrator under the law in force at the relevant
22.5 The provisions of the Indian Arbitration Act, 1996 and all statutory
enactments and modifications thereof and rules made there under shall
22.6 The Arbitration proceedings shall be conducted in English and the venue
and seat of the Arbitration proceedings shall be at Bharuch and the
Courts at Bharuch shall have exclusive jurisdiction.
22.7 The governing substantive law shall be Indian laws.
23. LABOR LAWS AND REGULATION:
23.1 The Contractor shall be responsible for strict compliance of and shall
ensure strict compliance by it sub-Contractors, servants or agents of all
labour and other laws, rules or regulation having the force of law affecting
the relationship of employer and employee between the Contractor/Sub-
Contractor and their respective employees.
23.2 The Contractor and Sub-Contractor(s) of the Contractor shall obtain
authority(ies) designated in this behalf under any applicable law, rule or
regulation including but not limited to the Factories Act, ESIC Act,
Employees Compensation Act and Contract labour (Abolition &
Regulation) Act, 1970 (insofar as applicable) any and all such license(s)
consent(s), registration(s) and / or other authorisation (s) as shall from
time to time be or become necessary for relative to the execution of the
work or any part or portion thereof or otherwise in connection with
performance of the Contract, and shall at all times observe and ensure
due observance by the Sub-Contractor, servants and agents of all terms
and conditions of the said licence(s), regulation(s) and other
authorisation(s) and laws, rules and regulations applicable thereto.
23.3 Nothing in the Contract document stated shall anywise constitute any
workman/ employee of the Contractor or any Sub-Contractor as or to be
workman/ employee of the Company, or place obligation or liability in
respect of any such workman/ employee upon the Company.
23.4 Without prejudice to any other liabilities or obligation of the Contractor
relative to Sub-Contractors in terms hereof or otherwise, the Contractor
shall indemnify and keep indemnified the Company from and against all
actions, claims, demands and liabilities whatsoever under and in respect
of the breach of any other provisions and / or against any claim, action
or demand by any workman / employee of the Contractor or any Sub-
Contractor and / or from any liability anywise to any workman / employee
of the Contractor or any Sub-Contractor under any law, rule or regulation
having the force of law, including but not limited to claims against the
Company under the Employee’s Compensations Act, 1923, The
Employees Provident Funds Act, 1952, and/ or The Contract labour
(abolition & Regulation) Act,
24. SAFETY REGULATION, ACCIDENT AND DAMAGE:
24.1 The Contractor shall be responsible at his own cost in and relative to
performance of the work and Contractor to observe and to ensure
observance by his Sub-Contractors, agents and servants of the
provisions of Safety Code as hereinafter appearing and all fire, Safety
and Security regulations as may be prescribed by the Company from
time to time and such other Precautions, measures as shall be
24.2 All necessary personal safety / protection equipment as considered
adequate by the Engineer- in-Charge / Officer- in-Charge should be
made available for the use to deployed manpower on the site and
maintained in a condition suitable for immediate use and the Contractor
should take adequate steps / monitor continuously for proper use of such
equipment’s by those concerned.
24.3 The contractor shall submit immediately in writing about accidents
occurred during the work execution to Company’s Fire & Safety and HR
Depts. Under intimation to Engineer- in-Charge / Officer- in-Charge.
25. SECURITY REGULATIONS:
25.1 The contractor shall ensure for strict compliance with the security
regulations / directives of the Company & shall also ensure that the
manpower deployed follows the rules during Entry / Exit as well as while
they are in the Company premises. All the deployed manpower shall
prominently display the Entry Cards while they are in the premises of the
25.2 If the Company finds any person / persons deployed by the contractor to
be undesirable the contractor shall immediately withdraw such person /
persons and substitute him / them. The decision of the Company for
undesirability of the persons deployed by the contractor shall be final and
binding on the contractor.
26. QMS, EMS, OHSMS &EnMS COMPLIANCE:
The Company is certified for Quality Management Systems, Environment
Management System, and Occupational Health & Safety Management
System and Energy Management System. All the persons (including
Contractors, Supervisors & their workers) working at GNFC or on behalf of
GNFC are required to comply with the QEHSEN guidelines in addition to
other applicable labour laws, safety laws as well as legal compliances.
27. OTHER TERMS:
NARDES reserves its right to enter into parallel Contract/s with other Bidders.
NARDES will allot the work to the lowest tenderer individually or collectively
In case, if contract is awarded and bidder fails to execute the same in line
with Conditions of Contract given in the contract, NARDES reserves its right
to source such services from any other source and extra financial implication,
if any, shall be to the defaulting Contractor’s risk and cost.
28. Coordination with allied Agencies:
These Special condition details the requirements for coordination and
interface management between Civil contractor and allied agencies
performing work concurrently or sequentially on this project, including but not
limited to electrical, lift/elevator and solar system contractors/agencies
29. GENERAL CONDITIONS OF CONTRACT:
All other terms conditions, not covered to the extent as provided above and in
Annexure attached hereto shall be as per General Conditions of Contract
(GCC) attached and marked as Annexure –V, which is an integral part of this
tender document.
30. GENERAL OBLIGATIONS OF THE CONTRACTOR:
30.1 The Contractor shall deploy suitably qualified and experienced
manpower in adequate numbers to carry out the job as per the scope of
work efficiently, safely & systematically depending upon the requirement
of the Company from time to time.
30.2 The Contractor shall deploy only such persons:
a) Who are above the age of 18 (eighteen) years and below the age
of 60 (sixty) years.
b) Who is physically sound, well behaved, trustworthy and
c) Who are medically fit, with proper eye sight (with or without
d) Who can read and write Gujarati / Hindi.
e) Who have clean habits and are teetotallers.
f) Who have no criminal record & have authentic ID & birth date
30.3 The Contractor shall deploy Supervisors in adequate numbers to
organize job related activities, supervise closely the job to be carried out
by his deployed workers as well as to ensure their safety &security. The
contractor / supervisor shall obtain details of jobs to be carried out from
Engineer-in-Charge / Officer-in-Charge & shall update progress of jobs
30.4 The Contractor shall solely and exclusively responsible for engaging and
employing the persons for execution of this contract. The company shall
have no liability whatsoever concerning workers. The Contractor shall
indemnify the company against all losses or damages or liabilities arising
out of or in course employing person or out of their relationship.
30.5 The Contractor shall be responsible and liable for payment of salaries,
wages & other lawful dues of his personnel as EMPLOYER. The
Contractor shall maintain proper books, accounts, records & documents
and comply with all statutory rules & regulations applicable to the
Employer as CONTRACTOR.
30.6 The Contractor shall make payment of wages and other dues to his
personnel on scheduled date but not later than 10th of each calendar
month. The Contractor shall also certify that all personnel employed have
been paid the minimum wages as prescribed by the Government and all
other laws are complied with and that there is no violation of any
applicable laws and no case of litigation is instituted or pending before
any authorities.
30.7 The Contractor shall disburse the monthly wages to his personnel
deployed at our site through bank only, disbursement of wages in cash
shall be not be allowed in any case. The Contractor shall submit soft
copy of file containing full name of worker, his bank account no. and
name of bank & branch as well as PF account / UAN no., before first
wage disbursement to operating department & HR department.
30.8 The Company shall be entitled to deduct directly from the bills to be paid
to the contractor any sum payable by him and which sum/sums the
Company is required to pay as Principal Employer on account of
contractor’s default in respect of all liabilities referred to in above clauses
and loss, damage etc. suffered by the Company due to contractor’s
30.9 The successful contractor shall arrange
1. To Submit separate ESIC registrations of workers deployed
exclusively for (NARDES SITE) GNFC Bharuch site / Dahej site (as
the case may be) for total duration of contract and Labour License
before commencement of work
2. To get verified the wage sheet from HR Dept. before disbursement
of wages and ensure wage disbursement through Bank on the
schedule date notified by HR dept.
3. To submit copy of wage sheet along with bank letter showing transfer
of wages as well as PF challan along with ECR before 20th of every
4. To execute agreement on stamp paper for wage disbursement
30.10 The contractor shall provide in writing the list of persons to be
deployed by him to Security department of the Company in prescribed
format for allowing them to enter in to Co.’s premises to carry out subject
job. The contractor shall also collect the ID Proof, Date of Birth proof,
Present & Permanent address proof, emergency contact NO... and shall
maintain the proper record.
30.11 On expiry of the validity of the Contract or in the event of the company
terminating the contract prematurely, the contractor shall ensure that all
the entry passes issued to his workers are collected back and deposited
with the Security Department. The Contractor shall be solely responsible
for misuse of any of the entry pass issued to his workers and the final
payment if any, applicable shall be made after confirmation of the
Security department to that effect.
30.12 The contractor shall obtain License for deployment of workers from
the appropriate authorities & also get insured them under ESIC policy as
per the provisions of laws and shall submit copies thereof to the
30.13 All tools & tackles, safety items etc. which are required to carry out
the work safely shall be arranged by you as & when required, except
where some special tools & tackles are being provided by the Company.
30.14 The Contractor shall provide free of charge all required safety
equipment / Personal Protection Equipment to the deployed manpower
& ensure that they use the same while carrying out the job. If required
for specific job, the contractor shall approach Engineer in-charge / Officer
in-charge for special tools/ tackles and safety appliances if required. Any
loss or damage to the specialized tools and tackles provided by the
Company to the contractor due to deliberate or negligence of the
deployed manpower shall be recovered from the payment due to
contractor at the rate as decided by the Company.
30.15 All safety precautions while executing the contract shall be strictly
observed by the contractor. Corrective measures as penalty for non -
compliance and eventual termination of contract followed by de-
registration, as approved contractors / vendors are the consequences of
repeated non - compliance and negligence.
30.16 Company is committed to safety of all the persons working inside the
factory, including contractors/agencies/their supervisors /workers / sub-
contractors / agents, etc. Health& Safety Policy of GNFC is enclosed
herewith at Annexure–‘VII’ which demonstrates GNFC's strong
commitment to safety. In this regard, the Company shall imparting
necessary job related training. The Contractor shall be required to spare
the deployed manpower to participate in such programme.
30.17 The Company is certified for Environment, Occupational Health &
Safety, & Quality Management System, under which there are good
number of legal and other requirements to be fulfilled. In this regard, the
Company shall imparting necessary job related training. The Contractor
shall be required to spare the deployed manpower to participate in such
programme. We enclose herewith a copy of Integrated Management
System Policy of the Company as well as QEHSEN Guidelines to
Contractors at Annexure–‘VIII’ & Annexure–‘IX’.
30.18 The Contractor shall be fully liable for any delay, loss or injury caused
directly or indirectly by any act or omission on the part of his Labourers,
agents or persons. In case, if any damage, loss or injury is caused, the
Contractor shall be liable to compensate for the same as per the decision
of GNFC, which shall be final and binding.
30.19 Company, however, reserves its right to terminate the contract
prematurely without giving any notice or any compensation whatsoever,
in case of failure by the contractor to discharge the jobs under the scope
of the subject contract to the satisfaction of the Company or in case of
misbehaviour/indiscipline on the part of the Contractor himself or his
Labourers or agents or persons. The decision of the Engineer-in-charge
/ Officer-in-charge of the Company in this regard shall be final and
binding upon the contractor.
30.20 In case the contractor fails to discharge his obligations in time, then
the Company shall get the services of other contractor/agency at
contractor’s risk and cost. The expense towards this shall be
recovered from the contractor. The decision of the Company shall be
final in this regard.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Annexure-II [SPECIAL CONDITIONS OF THE TENDER].pdf
Annexure-V [Other terms and condition].pdf
Annexure-VI [GCC].pdf
Annexure-VII [Coditionof Labour Law].pdf
Annexure-VIII [Health and Safety Policy].pdf
Annexure-IX[QEHSEN Guidelines to Contractors].pdf
Annexure-XI [Covering Letter].pdf
Annexure-XII [GST].pdf
Annexure-XIII [MSME].pdf
Annexure-XIV [undertaking].pdf
Annexure-XV [Prequalification].pdf
Annexure-I [GENERAL INSTRUCTIONSTO THE BIDDERS].pdf
RFP.pdf
Annexure-III [SCOPE OF WORK].pdf
Annexure-IV [Technical Specification of Material].pdf
Annexure-X [SOQ].pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .