Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.3 L
EMD Value
₹9,500
Closing Date
2 Dec 2026, 5:45 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
O/O THE EXECUTIVE ENGINEER PWD BUILDINGS C AND M DIVISION PUDUKKOTTAI
Special Repairs to Leaky Roof, Flooring, Damaged Doors and Windows, Approach Road and Painting in OP Building and Blood Bank Building in PHC at Ammapattinam in Pudukkottai District
2026_PWD_727226_1
09-2/2026-2027
Open Tender
Civil Works - Buildings
Lump-sum
60 days
Ammapattinam Pudukkottai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹9,500
18 Nov 2026
18 Nov 2026
3 Dec 2026
18 Nov 2026
2 Dec 2026
18 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking materials useful for reuse of Clean removal of Cement plaster from walls | 66.5 | M2 | 9.06 | ₹602.49 |
| 2 | Dismantling, clearing away and carefully stacking materials useful for reuse of Clean removal of AC sheet roofing without roof timbers | 36 | M2 | 18.9 | ₹680.4 |
| 3 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 8.5 | M3 | 256.8 | ₹2,182.8 |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 12.8 | M3 | 2,312 | ₹29,593.6 |
| 5 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 12.8 | M3 | 1,086.35 | ₹13,905.28 |
| 6 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 3.4 | M3 | 6,104.45 | ₹20,755.13 |
| 7 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 8.5 | M2 | 686.8 | ₹5,837.8 |
| 8 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard
specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 0.09 | Qtl | 9,297.2 | ₹836.75 |
| 9Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 9.01 | 50mm Thick | 3.6 | M2 | 634.8 | ₹2,285.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TenderConditionsAmmapattinamPHC.pdf
Tender Documents • 1.28 MB
BOQ_872969.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .