ASSISTANT ENGINEER
The Assistant Engineer, LSGD Section, Cherukunnu Grama Panchayath
Cherukunnu GP, Project No. 31/2026-27-Pallichal Padiyil Road Retarring
2026_LSGD_880212_1
AE/CHKU/6/2026-27
Open Tender
Civil Works - Roads
Item Rate
180 days
Cherukunnu GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,777
Yes
16 Oct 2026
16 Oct 2026
28 Oct 2026
16 Oct 2026
26 Oct 2026
16 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1retarring | |||||
| 1.001 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means | 0.06 | Hectare | - | - |
| 1.002 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 4.6 | cum | - | - |
| 1.003 | 2.14.2.A:Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 (II) By Mechanical Means (A) Bituminous Courses | 2.74 | cum | - | - |
| 1.004 | 3.1:Preparation of Foundation for Embankment <br> Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means<br> Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. | 372.2 | sqm | - | - |
| 1.005 | OD241529/2026-2027:Granular sub-base/base/surface course with serviceable material available(departmental material) during scarifying of existing road. Construction of granular sub-base with departmental material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (Modified 4.11.2) | 5.58 | cum | - | - |
| 1.006 | 4.1.A.2:Granular Sub-base with Well Graded Material (Table 400.1)<br>(A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material | 59.92 | cum | - | - |
| 1.007 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 11.23 | cum | - | - |
| 1.008 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 19.5 | sqm | - | - |
| 1.009 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 22.4 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.79 MB
BOQ_1496745.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .