Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-Finance | ₹15.8 L | L1 | Accepted-Finance Done |
| 2 | L2₹17.7 L+₹1.9 L (12.2%)Accepted-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹17.7 L+₹1.9 L (12.2%) | L2 | Accepted-Finance Done |
| 3 | L3₹18.1 L+₹2.3 L (14.5%)Accepted-Finance VILLAGE CHAMYANA P O KAMLA NAGER BHATTA KUFER DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹18.1 L+₹2.3 L (14.5%) | L3 | Accepted-Finance Done |
| 4 | L4₹18.9 L+₹3.1 L (19.7%)Accepted-Finance HIMACHAL PRADESH HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹18.9 L+₹3.1 L (19.7%) | L4 | Accepted-Finance Done |
| 5 | L5₹20.6 L+₹4.8 L (30.5%)Accepted-Finance VILL MANOH P O BASSI TEH JOGINDER NAGAR DISTT MANDI H P | JOGINDER NAGAR | MANDI | HIMACHAL PRADESH | ₹20.6 L+₹4.8 L (30.5%) | L5 | Accepted-Finance Done |
| Sl No | Description | Qty | Unit | Jaswant Singh Govt Contractor L6 | Vijay Kumar L4 | SUNIL KUMAR L2 | Surinder Singh L3 | chamel singh L5 | Arun Chaudhary L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 22.18 | Cum | 245 ₹5,434.1 | 290 ₹6,432.2 | 200 ₹4,436 Lowest | 200 ₹4,436 Lowest | 330 ₹7,319.4 | 200 ₹4,436 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand): 10 shuttering complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. - (a) All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) | 13.3 | Cum | 4,900 ₹65,170 | 5,200 ₹69,160 | 4,000 ₹53,200 | 4,300 ₹57,190 | 5,200 ₹69,160 | 3,000 ₹39,900 Lowest |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge.- All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) | 20.89 | Cum | 7,500 ₹1,56,675 | 6,400 ₹1,33,696 | 6,000 ₹1,25,340 | 5,500 ₹1,14,895 | 6,900 ₹1,44,141 | 5,000 ₹1,04,450 Lowest |
| 4.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 30.77 | Cum | 7,500 ₹2,30,775 | 6,400 ₹1,96,928 | 6,000 ₹1,84,620 | 5,800 ₹1,78,466 Lowest | 8,000 ₹2,46,160 | 5,800 ₹1,78,466 Lowest |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 3.85 | Cum | 7,500 ₹28,890 | 6,000 ₹23,112 | 6,000 ₹23,112 | 5,800 ₹22,341.6 | 8,300 ₹31,971.6 | 5,000 ₹19,260 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 107.86 | Sqm | 250 ₹26,965 | 220 ₹23,729.2 | 300 ₹32,358 | 250 ₹26,965 | 310 ₹33,436.6 | 150 ₹16,179 Lowest |
| 7.00 | Suspended floors, roofs, landings, balconies and access platform complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 223.38 | Sqm | 450 ₹1,00,521 | 390 ₹87,118.2 | 300 ₹67,014 | 315 ₹70,364.7 | 540 ₹1,20,625.2 | 175 ₹39,091.5 Lowest |
| 8.00 | Edges of slabs and breaks in floors and walls Under 20 cm wide metre complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 68.8 | Rmt | 65 ₹4,472 Lowest | 100 ₹6,880 | 300 ₹20,640 | 130 ₹8,944 | 210 ₹14,448 | 100 ₹6,880 |
| 9.00 | Columns, Pillars, Piers, Abutments, Posts and Struts complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 51.36 | Sqm | 450 ₹23,112 | 350 ₹17,976 | 300 ₹15,408 | 315 ₹16,178.4 | 630 ₹32,356.8 | 200 ₹10,272 Lowest |
| 10.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 23.05 | Cum | 8,500 ₹1,95,925 | 8,300 ₹1,91,315 | 7,000 ₹1,61,350 | 6,000 ₹1,38,300 Lowest | 7,000 ₹1,61,350 | 6,200 ₹1,42,910 |
Tender Value
₹17.2 L
EMD Value
₹34,500
Closing Date
20 Jul 2026, 5:00 pmClosed
Chairman, Temple Trust Shri Naina Devi Ji
Office of the Chairman, Temple Trust
Construction of Ladies Bathroom / Changing rooms at Kaulawala toba ( Near Talab) for Temple Trust Shri Naina Devi Ji Distt. Bilaspur (H.P.)
2026_NDTT_138922_1
No.TTSND.Cons (T)-15-(21)-40/2026-3564 to 3576 Dated 01.07.2026
Open Tender
Civil Works
Item Rate
Shri Naina Devi Ji
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
Chairman, Temple Trust Shri Naina Devi Ji
₹34,500
Yes
26 Aug 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 1 | Cum | 1.25 | ₹1.25 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand): 10 shuttering complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. - (a) All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) | 13.3 | Cum | 2.25 | ₹29.93 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge.- All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) | 20.89 | Cum | 3.25 | ₹67.89 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 30.77 | Cum | 4.25 | ₹130.77 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 1 | Cum | 5.25 | ₹5.24 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 107.86 | Sqm | 6.25 | ₹674.13 |
| 7 | Suspended floors, roofs, landings, balconies and access platform complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 1 | Sqm | 7.25 | ₹7.24 |
| 8 | Edges of slabs and breaks in floors and walls Under 20 cm wide metre complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 1 | Rmt | 8.25 | ₹8.24 |
| 9 | Columns, Pillars, Piers, Abutments, Posts and Struts complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 51.36 | Sqm | 9.25 | ₹475.08 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) complete in all respect within all metres lead and lifts as per direction and best satisfaction of Engineer-in-charge. | 23.05 | Cum | 10.25 | ₹236.26 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
SBD.pdf
Tender Documents • 2.05 MB
GST.pdf
Additional Documents • 0.84 MB
BOQ_205758.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .