Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹89.1 LAccepted-AOC | ₹89.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹90.4 LRejected-AOC | ₹90.4 L | 2 | Rejected-AOC L2 |
| 3 | 3₹1.2 CrRejected-AOC | ₹1.2 Cr | 3 | Rejected-AOC L3 |
| 4 | 4₹1.2 CrRejected-AOC | ₹1.2 Cr | 4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | E.BABU L3 | Sri Rajeswari Construction L2 | SRI VINAYAGA CONSTRUCTION L4 | CHINNAMMAL ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00Providing 200 mm Dia CI dedicated sewage pumping main from AVM ASTA to KK Nagar A Sewage Pumping Station in Depot-136, Area-X. | |||||||
| 2.00 | Supply Laying ,Jointing 200 mm dia CI S/S pipes (LA class) with EDPM rubber gaskets including earth work excavation in hard stiff clay, black cotton, hard red earth, shales, murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m, carting the pipes to the site of work lowering in to the trenches, aligning includng refilling the trenches, disposal of surplus earth etc; complete at an average depth of 1.5m | 1,128 | mtr | 7,195 ₹81.2 L | 5,220 ₹58.9 L | 7,200 ₹81.2 L | 6,100 ₹68.8 L |
| 3.00Supply, conveying and fixing CI specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc. at any depth. | |||||||
| 4.00Bus Route | |||||||
| 5.00 | 200 mm D/Soc 90 degree Bend | 4 | Nos | 7,500 ₹30,000 | 7,500 ₹30,000 | 8,000 ₹32,000 | 7,000 ₹28,000 |
| 6.00Non Bus Route | |||||||
| 7.00 | 200 mm D/Soc CI 90o Bend | 1 | Nos | 7,500 ₹7,500 | 7,500 ₹7,500 | 8,000 ₹8,000 | 7,000 ₹7,000 |
| 8.00 | 200 mm D/Soc CI 45o Bend | 2 | Nos | 6,000 ₹12,000 | 7,000 ₹14,000 | 6,500 ₹13,000 | 6,000 ₹12,000 |
| 9.00 | 200 mm D/Soc CI 22.5o Bend | 2 | Nos | 6,000 ₹12,000 | 6,300 ₹12,600 | 6,000 ₹12,000 | 4,000 ₹8,000 |
| 10.00Supplying, conveying and fixing the slucie valves as per IS 14846/2000 PN 1 and CI double air valve as per IS14845/2000 with ISI marking including lowering, Aligning etc,complete | |||||||
Tender Value
Refer Docs
EMD Value
₹59,200
Closing Date
16 Dec 2025, 3:00 pmClosed
Superintending Engineer (C and M)
Office of Superintending Engineer, Contracts and Monitoring, 4th Floor, CMWSS Board, No.1, Pumping Station Road, Chintadripet, Chennai 600 002
Providing 200 mm Dia CI dedicated sewage pumping main from AVM ASTA to KK Nagar A Sewage Pumping Station in Depot 136 Area X
2025_CMWSS_626833_1
CNT/SEW/DEP/3699/2025-26
Open Tender
Civil Works
180 days
Chennai
Class 1A
5 documents required · 5 mandatory
₹0
₹59,200
28 Jan 2026
27 Nov 2025
17 Dec 2025
27 Nov 2025
16 Dec 2025
9 Dec 2025
Amount
Providing 200 mm Dia CI dedicated sewage pumping main from AVM ASTA to KK Nagar A Sewage Pumping Station in Depot-136, Area-X.
Supply Laying ,Jointing 200 mm dia CI S/S pipes (LA class) with EDPM rubber gaskets including earth work excavation in hard stiff clay, black cotton, hard red earth, shales, murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m, carting the pipes to the site of work lowering in to the trenches, aligning includng refilling the trenches, disposal of surplus earth etc; complete at an average depth of 1.5m
Supply, conveying and fixing CI specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc. at any depth.
Bus Route
200 mm D/Soc 90 degree Bend
Non Bus Route
200 mm D/Soc CI 90o Bend
200 mm D/Soc CI 45o Bend
200 mm D/Soc CI 22.5o Bend
200mm DN Sluice valve
80mm Sluice valve
80mm Double Air valve
Specials for 200mm Sluice valve & Flow meter
200 mm CI collars
200 mm F/Spi Tail Piece
200 mm F/Soc Tail Piece
200mm dia EMF
Specials for 80 mm Air valve
200 mm x 80 mm D/Soc/Fl Tee
Construction of Sluice valve chamber & Flow meter chamber including providing and fixing L.S. cover and frame of size 60 x 60cm
200 mm Dia Sluice valve & Flow meter
Construction of Air valve chamber of size 2.0m x 1.2m x 2.5m including providing and fixing L.S. cover and frame of size 60 x 60cm
Cutting 200mm dia C.I Pipes
Hiring charges for breaker for cutting Asphaltic/concrete road surface
Jointing the double flanged specials with rubber insertion to the required specifications with M.S bolts and nuts, complete.
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites
Testing of M.S./C.I./P.V.C./D.I pipes with hydraulic testing equipment by filling with water(including cost of water@ Rs.77/KL) and testing to recommended pressure in convenient stetches and attending the bursts if any occured during the test, excluding the cost of pipes, including other incidental and operational charges, etc., complete for 200mm dia pipe
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly for PCC works excluding centering, shuttering, compacting, curing, finishing etc complete.
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm HBG for the CI pumping main including the cost of shuttering, compaction, curing etc. complete.
Bus Route
200 mm D/Soc 90 degree Bend
Non Bus Route
200 mm D/Soc CI 90o Bend
200 mm D/Soc CI 45o Bend
200 mm D/Soc CI 22.5o Bend
Wet Mix
RTK Survey TBM Available : The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities
Total excluding GST
Sri Rajeswari Construction (BID ID -1534198)
E.BABU (BID ID -1533419)
SRI VINAYAGA CONSTRUCTION (BID ID -1533413)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
CHECK_LIST_3699.pdf
Tender Documents • 0.10 MB
BOQ_749488.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid