Executive Engineer, R&B Division, Junagadh
Construction of New Major Bridge and Approach road at Junagadh- Bhesan road ch.34/00 to 36/00 (Uben river)
283354
31 of 2025-26
Open
Civil Works - Others
Works
Junagadh
10 documents required · 9 mandatory · 1 optional
₹12,000
Yes
Executive Engineer, R & B Division, Junagadh.
₹7.1 L
Yes
6 Mar 2026
6 Mar 2026
6 Mar 2026
25 Mar 2026
6 Mar 2026
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
1 Clearing and grubbing road land including uprooting rank 1.00 Hectare 34889.37
vegetation grass bushes,shrubs,sapling and trees girth up to 300 mm
removal of stumps of trees cut earlier and disposal of unserviceable
materials(A) By mechanical means in area of light jungle
2 Diversion of water course, providing cofferdam and bund or island 8.00 EACH 30300.00
as may be necessary for foundation and maintaining the same for
the period as may be necessary. (V)
3 Marking out the center line of the Bridge and various other 1.00 L.S 50500.00
component structures and complete lining out and leveling with
theodolite, levels,including constructing necessary masonory pillars
for lines and levels and establishing nesessary bench marks etc.
complete as directed.
4 Cutting of Trees, including Cutting of Trunks, Branches and Removal 10.00 Nos. 1054.44
(Removal of stumps, roots, stacking of serviceable material with all
lifts and up to a lead of 1000 metres and earth filling in the
depression/pit.)
5 Carry out Geo-technical investigation work including exploratory 50.00 Rmt 5050.00
drilling of 150mm dia bore holes in all sorts of soil, ordinary rock and
hard rock, upto maximum depth as mentioned, collecting
undisturbed samples and conducting standard penetration tests
alternate at an interval of 1.5m.depth, conducting necessary
laboratory tests for all type of classification and determination of soil
parameters like density, shear and consolidation parameters if
required, including submission of report in three copies covering
investigation data and recommendation for SBC and the pile
capacity considering the design criteria, all as per specification.
Including of submitting soil investigation report in three sets in hard
copy as well soft copies and all materials with contractor's labour,
tools & plants, machineries, as required, The Geotech bore locations
shall be provided by consultant,The rate is including of all taxes.
• For Water Portion
5a Carry out Geo-technical investigation work including exploratory 75.00 Rmt 2020.00
drilling of 150mm dia bore holes in all sorts of soil, ordinary rock and
hard rock, upto maximum depth as mentioned, collecting
undisturbed samples and conducting standard penetration tests
alternate at an interval of 1.5m.depth, conducting necessary
laboratory tests for all type of classification and determination of soil
parameters like density, shear and consolidation parameters if
required, including submission of report in three copies covering
investigation data and recommendation for SBC and the pile
capacity considering the design criteria, all as per specification.
Including of submitting soil investigation report in three sets in hard
copy as well soft copies and all materials with contractor's labour,
tools & plants, machineries, as required, The Geotech bore locations
shall be provided by consultant,The rate is including of all taxes.
• For Land Portion
6 Excavation for foundation in hard murrum and boulders and very 2084.92 Cu.m. 611.32
stiff or sticky, clays and other similar strata including shoring and
strutting and dewatering as necessary and disposing of the
excavated stuff as directed.
7 Excavation in large boulders and soft rock by welding including 1585.30 Cu.m. 716.55
shoring, strutting and dewatering as necessary and disposing of the
excavated stuff as directed.
8 Excavation in hard rock by dry-wet blasting and chiselling including 729.24 Cu.m. 1675.31
dewatering preparing foundation base by proper benching and
stepping and disposing of the excavated stuff as directed.(B)
prohibited Blasting work.
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
9 Providing and filling PCC in foundation with ordinary cement 161.62 Cu.m. 3715.63
concrete M15 grade including formwork, vibrating, ramming,
compaction, leveling, curing, etc. complete.
10 Providing and casting in-situ Reinforced Cement Concrete M30 893.24 Cu.m. 4551.99
grade controlled cement concrete in pier, abutment & retaining
walls foundations (piers, abutments and retaining wall shall be cast
in single lift or as per direction of Engineer in charge) etc. using 6mm
to 20mm machine crushed well graded stone aggregate, sand of
approved quality, OPC53 grade cement (with contractor's own
concrete mix design as approved) etc. complete.
11 Providing and filling trenches of Labour charges - Excavator in rocky 1959.17 Cu.m. 3715.63
strata with ordinary cement concrete M-15
12 Providing and casting in-situ Reinforced Cement Concrete M30 458.05 Cu.m. 5491.67
grade controlled cement concrete in pier, abutment, returns &
retaining walls (piers, abutments, returns and retaining wall shall be
cast in single lift or as per direction of Engineer in charge) etc. using
6mm to 20mm machine crushed well graded stone aggregate,
sand of approved quality, OPC53 grade cement (with contractor's
own concrete mix design as approved by R&B Junagadh,) etc.
complete. The rate is inclusive of all materials, including necessary
mixing in fully automatic batch mix plant, transport, curing, vibrating,
placing in position, scaffolding, staging, shuttering, formworks,
deshuttering carefully, making good the damages,fixing
embedment, inserts, pockets, wherever necessary, with all lead and
lift with contractor's labour,tools & plants, machineries, as required,
with F3 type exposed concrete finish and form mark. Any
honeycombing / Undulation found shall be rectify to match F3 class
Note:- Rates in items shall include cost of providing grooves,
chamfers, moulding, cut-out etc. in formwork. The work will include
placing in position of necessary fixtures, sleeves for various purposes,
etc. complete as per drawings, specifications and as directed by
the Engineer in charge. The rate shall also include preparation of
construction joints as per specifications and provide approved wire
mesh/weld mesh at such location as approved by the Engineer-in-
charge or as shown in drawings.
Height from 0 to 5m
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
12a Providing and casting in-situ Reinforced Cement Concrete M30 76.89 Cu.m. 5818.08
grade controlled cement concrete in pier, abutment, returns &
retaining walls (piers, abutments, returns and retaining wall shall be
cast in single lift or as per direction of Engineer in charge) etc. using
6mm to 20mm machine crushed well graded stone aggregate,
sand of approved quality, OPC53 grade cement (with contractor's
own concrete mix design as approved by R&B Junagadh,) etc.
complete. The rate is inclusive of all materials, including necessary
mixing in fully automatic batch mix plant, transport, curing, vibrating,
placing in position, scaffolding, staging, shuttering, formworks,
deshuttering carefully, making good the damages,fixing
embedment, inserts, pockets, wherever necessary, with all lead and
lift with contractor's labour,tools & plants, machineries, as required,
with F3 type exposed concrete finish and form mark. Any
honeycombing / Undulation found shall be rectify to match F3 class
Note:- Rates in items shall include cost of providing grooves,
chamfers, moulding, cut-out etc. in formwork. The work will include
placing in position of necessary fixtures, sleeves for various purposes,
etc. complete as per drawings, specifications and as directed by
the Engineer in charge. The rate shall also include preparation of
construction joints as per specifications and provide approved wire
mesh/weld mesh at such location as approved by the Engineer-in-
charge or as shown in drawings.
Height from 5m to 10m
13 Providing and casting in-situ Reinforced Cement Concrete M30 225.27 Cu.m. 5572.17
grade controlled cement concrete in pier cap, abutment cap & dirt
wall using 6mm to 20mm machine crushed well graded stone
aggregate, sand of approved quality, OPC53 grade cement (with
contractor's own concrete mix design as approved by R&B
Junagadh,) etc. complete. The rate is inclusive of all materials,
including necessary mixing in fully automatic batch mix plant,
transport, curing, vibrating, placing in position, scaffolding, staging,
shuttering, formworks, deshuttering carefully, making good the
damages,fixing embedment, inserts, pockets, wherever necessary,
with all lead and lift with contractor's labour,tools & plants,
machineries, as required, with F3 type exposed concrete finish and
form mark. Any honeycombing / Undulation found shall be rectify to
match F3 class finish.
Note:- Rates in items shall include cost of providing grooves,
chamfers, moulding, cut-out etc. in formwork. The work will include
placing in position of necessary fixtures, sleeves for various purposes,
etc. complete as per drawings, specifications and as directed by
the Engineer in charge. The rate shall also include preparation of
construction joints as per specifications and provide approved wire
mesh/weld mesh at such location as approved by the Engineer-in-
charge or as shown in drawings.
14 Providing & laying weep hole in Aburtments, and returns by using 339.84 Each 61.47
A.C. pipe of 100mm including laying in proper grede and jointing
the completed as per detailed specification.
15 Providing and fixing metal expansion joints as per drawings. Details 104.00 Rmt. 2013.95
of expansion joint 50 x 50 x 6mm size two IS and 100 x 6mm MS plate
with 6 x 20 x 25mm long hold fast @ 50 cm / cc on both sides of
expansion joints.
16 Providing and laying Tar Paper below solid slab of approved and as 163.20 Sqm. 42.93
directed by engineer in charge.
17 Providing flood gauge marks on substructure as per design including 11.51 RMT 156.34
painting complete.
18 Providing masonry steps with cement pointing on approaches on 60.00 STEPS 230.50
both ends as directed.
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
19 Providing and laying filter media 600mm thick as directed at the 339.84 Sq.m. 1239.35
back of abutments, returns and wing walls as per detailed
specifications.
20 Providing and casting in-situ Reinforced Cement Concrete M30 809.93 Cu.m. 6040.16
grade controlled cement concrete in Solid Slab using 6 mm to
mm machine crushed well graded stone aggregate, sand of
approved quality,OPC 53 grade cement with contractor's own
concrete mix design as approved by client ,etc.complete as per
The rate is inclusive of all materials, including necessary mixingin fully
automatic batch mix plant, transport, curing, vibrating, placing in
position, scaffolding, staging, shuttering, formworks, deshuttering
carefully, making good the damages,fixing embedment, inserts,
pockets, wherever necessary,with all lead and lift with contractor's
labour, tools & plants, machineries, as required, with F3 type
exposed concrete finish and form mark. Any honeycombing /
Undulation found shall be rectify to match F3 class finish.
21 Providing and casting in situ controlled cement concrete M-40 for 109.20 Cu.m. 7490.16
average 100 mm thick wearing coat laid as directed dincluding
tamping, vibrating, finishing, curing and fillingin joints with bitumen
22 Providing and casting in-situ Reinforced Cement Concrete M 30 46.80 Cu.m. 5423.03
grade with 20mm down coarse aggregate at any level including
shuttering, mixing with batching plant, placing in position,
consolidating with mechanical vibrators, curing, deshuttering
carefully, making good the damages, fixing embedment, inserts,
pockets, wherever necessary as directed for Approach Slab
including all leads and lifts etc. complete as per specification and
23 Providing and placing in position FE 550D bar reinforcement for 89.32 Tonne 73858.69
following items including cutting bending hooking and tying
complete as per detailed drawing.For well :- curb, staining, cap and
23a Providing and laying in position FE 550D TMT bar reinforcement 72.50 Tonne 73858.69
including cutting, bending, hooking and tying complete as per
detailed drawings for the following.(A) Piers (B) Abutments (C) R.C.C.
Returns (D) Retaining wall
23b Providing and laying in position FE 550D TMT bar reinforcement 34.59 Tonne 73858.69
including cutting, bending, hooking and tying complete as per
detailed for the following. (A) Abutment cap & Dirt wall. (B) Pier Cap.
23c Providing and placing in position FE 550D TMT bar reinforcement 129.56 Tonne 74728.50
including cutting, bending, hooking, and tying complete as per
detailed drawing.(A) Solid Slab. (B) Crash Barrier (C) Wearing Coat
23d Providing and fixing in position FE 550D TMT bar reinforement 12.13 Tonne 73243.02
including cutting, bending and tying complete as per detailed
drawings. (A) R.C.C. Kerb. (B) R.C.C. Approch slab.
24 Providing and casting in-situ Reinforced Cement Concrete M40 167.32 Cu.m. 5291.93
grade controlled cement concrete in crash barrier using 6mm to
20mm machine crushed well graded stone aggregate, sand of
approved quality, OPC53 grade cement (with contractor's own
concrete mix design as approved by R&B Junagadh,) at any height
including centring, shuttering, mixing with batching plant,placing in
position, consolidating with mechanical vibrators, curing,
deshuttering carefully, making good the damages, fixing
embedment, inserts, pockets, wherever necessary as directed with
F3 / U3 type exposed concrete finish and form mark as directed by
Engineer-in-charge, including all leads and lifts etc. complete as per
specification and drawing.
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
25 Providing G.I. 100mm diameter water spouts including necessary 16.80 Each 536.03
iron gratings as per drawings.
26 Providing Pylon consist of cast-in-situ concrete of M30 grade 2.00 Each 5141.91
exposed finish as per drawing and as directed by engineer
incharge. Rate includes providing required shuttering and form work
but excluding stone slab & carving. (Reinforcement shall be paid in
respective item.)
27 Providing and fixing marble slab including transporting ,engraving 2.00 Each 865.21
and painting all complete. (ii) Size 60cm x 60cm x 40mm
28 Material and Labour for applying two or more coats of 100 % 4000.73 Sqm. 401.98
Premium Acrylic emulsion paint having VOC less than 50 gm/litre
and UV resistance as per IS:15489:2004, Alkali & Fungal resistance,
Dirt Resistance Exterior Paint oof required shade (Company Depot
Tinted) with Silicon Additives @ 1.43 litre / Sqm over and including
priming coat of exterior primer applied @ 0.90 litre/10 sqm over new
29 Providing and casting in situ controlled cement concrete M-30 114.61 Cu.m. 5133.34
for Kerb beside footpath including formwork curing and finishing,
30 Providing and fixing mild steel dowel bars of minimum 32mm dia. for 230.40 Rmt. 450.07
anchoring by drilling holes in foundation strata including necessary
bending, hooking of dowel bars and grouting the holes complete as
per detailed drawing and as directed.
31 Providing and fixing in position Mild steel dowel bars in pier caps or 64.00 Nos. 341.29
abutment caps for anchorage in fixed end as per detailed drawings
including cutting, bending and welding complete.
32 Providing and fixing in position Mild steel dowel bars in pier caps or 64.00 Nos. 399.70
abutments caps for anchorage in free end as per detailed drawing
including cutting, bending and welding complete.
33 Providing, Designing , Supplying and Installation of Extruded Bi-Axial 574.20 Sqm 107.26
Polypropylene 30kN Geogrid including all Labours & Etc. Complete
as directed by Engineer-In-Charge
34 Providing and filling sand behind abutments and between returns in 6895.05 Cum 562.08
layers as directed
35 Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a 458.42 Rmt. 4145.04
"Thrie" metal beam crash barrier comprising of 3 mm thick
corrugated sheet metal beam rail, 85 cm above road/ground level,
fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced
m centre to centre, 2 m high with 1.15 m below ground level, all
steel parts and fitments to be galvanised by hot dip process, all
fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed
on the vertical post with a space of channel section 150 x 75 x 5 mm,
546 mm long complete as per clause 811)
36 Providing fusion bonded Epoxy coating not less than 175 micron 101.43 MT 10162.62
thickness and up to 300 micron to reinforcement bars as per IS-13620-
1993/ASTM-775 M including testing of coating at plant and all taxes
(A) 10mm to 16 mm dia bar.
37 Providing fusion bonded Epoxy coating not less than 175 micron 236.67 MT 7296.24
thickness and up to 300 micron to reinforcement bars as per IS-13620-
1993/ASTM-775 M including testing of coating at plant and all taxes
(A) 20mm to 32 mm dia bar
38 Providing and Casting in situ controlled Cement Concrete M-200 for 24.68 Cum. 4620.41
toe walls including necessary shuttering laying, vibrating, ramming
and curing complete.
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
39 Earthwork for embankment including breaking clods, dressing with 325.78 Cum. 177.91
all lead and lift and including watering rolling and consolidation of
subgrade in layers at O.M.C. to required dry density including filling
the depression which occur during the process using power roller 8T
to 10T.(E) From Borrow area within 3 KM. lead
40 Providing and laying Pitching on slopes laid over prepared filter 109.82 Cum. 1127.16
media including boulder apron laid dry in front of toe of
embankment complete as per drawing and Technical
41 Providing and laying Filter material underneath pitching in slopes 53.39 Cum. 923.78
complete as per drawing and Technical specification
42 Carrying out load test of super structure as directed including all 200.00 MT 169.92
necessary materials plant equipement, instruments, labour and
arrangements for test directed.
43 Earthwork for embankment including breaking clods, dressing with 1153.00 Cum. 169.28
all lead and lift and including watering rolling and consolidation of
subgrade in layers at O.M.C. to required dry density including filling
the depression which occur during the process using power roller 8T
to 10T.(E) From Borrow area within 3.0KM. lead 100mm extra taken
for stage construction
44 Construction of granular sub-base by providing close graded 462.00 Cum. 1972.53
Material, mixing in a mechanical mix plant at OMC, carriage of
mixed Material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power
roller to achieve the desired density, complete as per clause
45 Prime coat (Providing and applying primer coat with bitumen 2829.00 Sqm 69.69
emulsion on prepared surface of granular Base including clearing of
road surface and spraying primer at the rate of 0.70 kg/sqm using
mechanical means.)
0 Tack Coat on Cement concrete pavement (Providing and applying 0.00 Sqm 19.19
tack coat with bitumen emulsion using emulsion pressure distributor
at the rate of 0.30 to 0.35 kg per sqm on the prepared bituminous
surface cleaned with mechanical broom.)
46 Wet Mix Macadam laying Using Mechanical Paver (Providing, 540.00 Cum. 2124.03
laying, spreading and compacting graded stone aggregate to wet
mix macadam specification including premixing the Material with
water at OMC in mechanical mix plant carriage of mixed Material
by tipper to site, laying in uniform layers with paver in sub- base /
base course on well prepared surface and compacting with
vibratory roller to achieve the desired density.)
47 providing and lying 110 mm D.B.M with B.T. Aggregate as per 728.00 MT 3365.32
MORT&H specification with VG-40\ For Tack coat @ 2.5 Kg. /10 Sqm.
With mechanical sprayer & bitumen VG-40 grade for mixing @
Kg./MT. i.e. 4.5% by total weight of mix heating and mixing the
aggregate & asphalt in Drum mix plant and transporting to site and
spreding the same by sensor paver finisher & consolidation with
vibratory roller including providing all materials equipments, tools &
plant, fire wood, oil, kerosene, labour charges etc. Complete using
contractor's own machinery batch mix plant & sensor paver finisher
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
48 Providing And lying 40mm thick bituminous concrete on exisitng 289.00 MT 3755.18
bituminous surface and using specification graded machine
crushed with 5.50 % bitumen VG-40 grade by Wt. of total mix as per
specification MORT&H including mixing of asphalt with B.T. chips in
Drum mix plant transporting same as by paver finisher and
consolidation the same with pair of 8 tonnes to 10 tonnes vibratory
roller to achive desire density and including VG-40 grade bitumen,
cost of emulsion, cost of required tools, plants, all machineries,
equipment fire wood, oil, kerosene, charges etc complete,
49 Road marking with hot applied thermoplastic paints with 114.00 Sqm. 367.72
reflectorising glass beads on bitumin surface providing and laying a
hot applied thermoplastic compound 2.5 mm thick including
reflectorising glass beads @ 250gms per sqm area, thickness of
2.5mm is excluding of surface applied glass beds as per IRC:35-
2015. The finished surface to be level, uniform and free from streaks
and holes. zebra patta /bump patta lane/center line/ edge line/cut
patta. The white color marking should provide liminance coefficinet
on cemend road shalll be min 130 mcd/m2/lux and Asphalt road
shall be min 100 mcd/m2/lux during the service life during the day
time. The marking should meet the performance criteria for night
time reflectivity, wet reflectivity and skid resistance as mentioned in
the section-15 of IRC 35-2015. Warranty for the Retro reflectivity
should be two years.
50 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking 549.00 Sqm. 706.93
concrete block 60mm thick with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling
and filling the joint with sand in proper line and level as per guidlines
of IRC : SP 63-2018 etc. Complete.
51 Regulatory / Mandatory Sign :-Providing and fixing sign boards 12.00 Nos. 4618.73
made out of 2mm aluminium sheet / 4mm ACP (Aluminum
composite Panel); size 60 cms Dia Circle as per design of IRC-67-
2012. Pre treated with phospheting process & acid etching; coated
with one coat of epoxy primer and two coats of best quality epoxy
paint ;reflectorised with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per ASTM D- 4956 and latest
M.O.S.T.Specifications; 3.6mtr long stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm; painted with bestquality
epoxy coatings in black and white bends. The details of symbol
foreach board shall be as per theinstruction of engineer in charge.
The fixing at site shall be in 1:2:4 CC blockof size 45 x 45 x 60 Cms. for
each leg.including excavation, curing etc.complete under the
supervision of engineer in charge. A warranty for 10 years for the
Retro reflective sheeting from original manufacturer & a certified
copy of 3 year outdoor exposure test report from third party test lab
for the product offered shall be submitted by contractor. (A) Class-C
Type-11 Retro Reflective sheeting
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
52 Cautionary Warning Sign :-Providing and fixing sign boards made out 8.00 Nos. 5077.27
of 2mm aluminium sheet / 4mm ACP (Aluminum composite Panel);
size 90 x 90 x 90 cms. equilateral triangle as per design of IRC-67-
2012. Pre treated with phospheting process & acid etching; coated
with one coat of epoxy primer and two coats of best quality epoxy
paint ;reflectorised with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm; painted with bestquality
epoxy coatings in black and white bends. The details of symbol
foreach board shall be as per theinstruction of engineer in charge.
The fixing at site shall be in 1:2:4 CC blockof size 45 x 45 x 60 Cms. for
each leg.including excavation, curing etc.complete under the
supervision of engineer in charge. A warranty for 10 years for the
Retro reflective sheeting from original manufacturer & a certified
copy of 3 year outdoor exposure test report from third party test lab
for the product offered shall be submitted by contractor. (A) Class-C
Type-11 Retro Reflective sheeting
53 Direction (Junction) Sign :-Providing and fixing sign boards made out 4.00 Nos. 26572.09
of 2mm aluminium sheet / 4mm ACP (Aluminum composite Panel);
size 244x122 cms. rectangular as per design of IRC-67- 2012. Pre
treated with phospheting process & acid etching; coated with one
coat of epoxy primer and two coats of best quality epoxy paint
;reflectorised with Micro Prismatic Grade retro refiectivesheeting of
Type-11 as per ASTM D-4956 and latest M.O.S.T.Specifications; 4.0mtr
long (2 Nos.) stand post of 75 x 75 x 6mm / 65NB Circular MS Pipe as
required and frame fabricated from suitable size iron angle of 50 x
50 x 5mm; painted with bestquality epoxy coatings in black and
white bends. The details of symbol foreach board shall be as per
theinstruction of engineer in charge. The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms. for each leg.including excavation,
curing etc.complete under the supervision of engineer in charge. A
warranty for 10 years for the Retro reflective sheeting from original
manufacturer & a certified copy of 3 year outdoor exposure test
report from third party test lab for the product offered shall be
submitted by contractor. (A) Class-C Type-11 Retro Reflective
54 Chevron sign :-Providing and fixing sign boards made out of 8.00 Nos. 4681.35
1.5mmaluminium sheet / 3mm ACP (Aluminum composite Panel);
size60x50 cm as per design of IRC-67-2012. Pre treated
withphospheting process & acid etching; coated with one coat of
epoxyprimer and two coats of best quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro refiectivesheeting of Type-11 as per
ASTM D-4956 and latest M.O.S.T.Specifications; 3.3 mtr long stand
post of 75 x 75 x 6mm / 65NB Circular MS Pipe as required and frame
fabricated from suitable size iron angle of 50 x 50 x 5mm; painted
with bestquality epoxy coatings in black and white bends. the
details of symbol or inscription / numerals for each board shall be as
per the instruction of engineer in charge.The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x 60 Cms. for each leg.including
excavation, curing etc.complete under the supervision of engineer
in charge. A warranty for 10 years for the Retro reflective sheeting
from originaa manufacturer & a certified copy of 3 year outdoor
exposure test report from third party test lab for the product offered
shall be submitted by contractor. (A) Class-C Type- 11 Retro
Reflective sheeting
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
55 Cat Eye / Road Stud / RPM: Supplying Raised Pavement Markers 142.00 Nos. 217.40
made of polycarbonate and ABS moulded body and reflective
panels with Micro prismatic lens (No Glass bead lens) capable of
providing total internal reflection of the light entering the lens face
and shall support a load of 13635 kgs. tested in accordance to ASTM
D 4280 Type H and complying to Specifications of Category A of
MORTH Circular No RW/NH/33023/10-97 Ð DO III Dt 11.06. 1997. The
height, width and length shall not exceed 20 mm, 130 mm and
mm and with minimum reflective area of 13 Sqcm on each side and
the slope to the base shall be 35 +/- 5 degree. The body of the
marker should having finger grip for easy and accurate placement
and application with epoxy / bituminous Adhesive as
recommended by the manufacturer of the marker. The color of the
marker should be as per the IRC 35-2015 and as directed by
Engineer-in-charge.
Seven Crores Eleven Lakh Sixty Eight Thousand One Hundred Five Rupees and Five Paise Only.
Name of Work - CONSTRUCTION OF NEW MAJOR BRIDGE AND APPROACH ROAD AT
JUNAGADH-BHESAN ROAD CH-34/0 TO 36/0 (UBEN RIVER)
Construction Division :-ROAD & BUILDING DIVISION, JUNAGADH
Sr Item of work Quantity Unit Estimated Total Amount in
Sr Item of work Quantity Unit Estimated Total Amount in
No. Rate in Rs. Rs
I/We am/are willing to carry out the work at ………………………………………………..% above/below (percent should be written in
figures and words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
Estimated Amount Estimated Amount
Put Rs. Put to tender Rs.
Dedu Rs. Deduct…….. Rs.
Net Rs. % Above
In words…. In words….
*( please strike out whichever is not applicable)
Signature of Contractor:-
Deputy Executive Engineer Executive Engineer
City R&B sub division R&B Division
Junagadh Junagadh
1 contractor shall exhibit a board with detailed specifications and details of work as directed by the
Engineer-in-Charge for which No Extra Payment shall be made
2 Labour Cess will be deducted as per prevailing rules i.e. 1% of the work done
3 and Income tax TDS will be deducted at source while making payments of bills
4 all RCC items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. P.C.C.-10-2017- Cement
consumption/16/C Dt. 11.05.2017 as stated in S.O.R. therefore in RCC items there is a change as per Actual Mix Design the cost of difference
of Cement Consumption have been deducted from the rate of Original Item at the rate of input rate mentioned in all the tenders
Signature of Contractor:-
Deputy Executive Engineer Executive Engineer
City R&B sub division R&B Division
Junagadh Junagadh
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 GR.pdf
2 GR.pdf
3 GR.pdf
4 GR.pdf
5 G R.pdf
6 G R.pdf
7 G R.pdf
Road_Book_New_Part_1.pdf
Road_Book_New_Part_2.pdf
Road_Book_New_Part_3.pdf
Road_Book_New_Part_6.pdf
Road_Book_New_Part_4.pdf
Road_Book_New_Part_5.pdf
Bridge Work Booklet_New.pdf
E Tender Notice.pdf
SBD.pdf
Material Testing Schedule.pdf
Specification Index.pdf
Additional Specification.pdf
Asphalt Consumption Statement.pdf
Pre Qualification.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .