Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical V P O KOTLA KALAN TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical VILLAGE KHADED P O CHOWAI TEHSIL ANNI DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | Accepted-Technical Accepted |
| 4 | Accepted-Technical ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | Accepted-Technical Accepted |
| 5 | Accepted-Technical BANSAL NIWAS RAM NAGAR SHIMLA 171004 HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171004 | Accepted-Technical Accepted |
Tender Value
₹30.6 L
EMD Value
₹53,400
Closing Date
9 Feb 2026, 10:30 amClosed
Executive Engineer
HP City Transport and Bus Stand Management And Development Authority Tutikandi Shimla -4
SH Painting, distempering and minor repair work etc.
2026_BSMDA_126199_7
No.HPBSMDA/EE/(2)2025-2026 Tender Vol-V
Open Tender
Civil Works
60 days
MANDI
Please refer tender document
9 documents required · 9 mandatory
₹2,360
HPBSMDA
₹53,400
10 Mar 2026
19 Jan 2026
9 Feb 2026
20 Jan 2026
9 Feb 2026
20 Jan 2026
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Repairs to plaster of thickness 12 mm to 20 mm (Twelve milimeter to Twenty milimeter) in patches of area 2.5 (Ttwo point five) sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in- Charge. With cement mortar 1:4 (One cement isto Four coarse sand) , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and applying white cement based putty of average thickness 1 mm (One milimeter), of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Distempering with 1st quality acrylic distember (Ready mix) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade : Old work (one or more coats) , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to all leads, stacking serviceable and unserviceable material separately including cutting einforcement bars , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (One cement isto One and half coarse sand isto three graded stone aggregate) 20 mm (Twenty milimeter) nominal size , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
SBD7.pdf
Tender Documents • 10.51 MB
BOQ_186042.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid