Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹47.2 L
EMD Value
₹47,500
Closing Date
1 Dec 2026, 6:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Deputy Municipal Commissioner
Annual maintenance work for Set/Reset, Repairing of footpath with C.C. Kerb, Paver block/Water Table & Guard Stone in T.P 11, 12 & 17 (Puna), T.P. 64 (Magob-Dumbhal) &gamtal area of East (Varachha) Zone-A. (Work no.5)(3rd attempt)
365773
DMC / EZ-A / 07/2026-2027 WORK NO.05
Open
Civil Works - Roads
Works
Surat
3 documents required · 3 mandatory
₹1,770
Commissioner, Surat Municipal Corporation
₹47,500
16 Nov 2026
16 Nov 2026
16 Nov 2026
1 Dec 2026
16 Nov 2026
120 days
Name of Work:- Annual maintenance work for Set/Reset, Repairing of
footpath with C.C. Kerb, Paver block/Water Table &
Guard Stone in T.P 11, 12 & 17 (Puna), T.P. 64 (Magob-
Dumbhal) & gamtal area of East (Varachha) Zone-A.
(Work no.5) (3rd attempt)
Downloading of Tender Document : From Dt.16/11/2026 to 01/12/2026 upto
On line E-mail Query : -
Submission of Technical Bid : EMD,Tender fee to be submitted online
https/smc.nprocure.com BY SCANNING through.
https/smctender.nprocure.com by Date
On line submission (Last Date) : Dt. 01/12/2026 upto 18.00hrs.
Submission of Tender fee, EMD (Only Banker : Upto Dt. 10/12/2026 upto 18.00 hrs. in sealed
cheque/D.D.), in hard copy. envelop strictly by R.P.A.D./ Speed Post to
Chief Accountant, SMC, Tapibhavan,
Tapipura, Surat. 395 003 Gujarat.
On line Submission of Bid : On or Before Upto Date 01/12/2026 18.00hrs.
Opening of Technical Bid along with other : On Dt.02/12/2026, 10.00 hrs. onwards
documents submitted online through (Probable)
Tentitive Price Bid Opening : Dtd.14/12/2026, 10.00hrs.Onwards(Probable)
Estimated Amount : Rs.
Document Fees : Rs.1770=00(including CGST 9%+ SGST 9%)
Class : "E-1" with Experience
SURAT MUNICIPAL CORPORATION
EAST (VARAVHHA) ZONE-A
NAME OF WORK :- Annual maintenance work for Set/Reset, Repairing of
footpath with C.C. Kerb, Paver block/Water Table &
Guard Stone in T.P 11, 12 & 17 (Puna), T.P. 64 (Magob-
Dumbhal) & gamtal area of East (Varachha) Zone-A.
(Work no.5) (3rd attempt)
I/We the undersigned do hereby tender for carrying out the work described in the schedule below
subject to the condition annexed.
Should this tender be accepted I/We hereby agree to abide by and to fulfill all the terms and
provisions of specifications and conditions of contract annexed hereto so far as they are applicable
and default thereof to forfeit and pay to the Municipal Corporation the sum of money mentioned in
the said conditions.
The earnest money deposited by me/us with tender may be forfeited to the said Municipal
Corporation if I/We do not deposit the full amount of security deposit, in accordance with the
clause (1) of the said conditions of contract.
EXECUTIVE ENGINEER
EAST (VARACHHA) -A
SURAT MUNICIPAL CORPORATION.
SIGNATURE OF THE TENDERER.
Sr. Contents Page No.
2 Abstract, Bill of Quantities and Estimate
Schedule B for Annual maintenance work for
Set/Reset, Repairing of footpath with C.C. Kerb, Paver
block/Water Table & Guard Stone in T.P 11, 12 &
(Puna), T.P. 64 (Magob-Dumbhal) & gamtal area of
East (Varachha) Zone-A. (Work no.5) (3rd attempt)
3 Percent below / above the estimated rates
SURAT MUNICIPAL CORPORATION
EAST (VARACHHA) ZONE -A
NAME OF WORK :- Annual maintenance work for Set/Reset, Repairing of
footpath with C.C. Kerb, Paver block/Water Table &
Guard Stone in T.P 11, 12 & 17 (Puna), T.P. 64 (Magob-
Dumbhal) & gamtal area of East (Varachha) Zone-A.
(Work no.5) (3rd attempt)
BILL OF QUANTITIES
1) The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General
and Special Conditions of Contract, Technical Specifications and Drawings.
2) The quantities given in the Bill of Quantities are estimated and provisional and are given to
provide a common basis for bidding. The basis of payment will be the actual quantities of
work ordered and carried out, as measured by the contractor and verified by the Engineer.
3) The bidder must quote his rate above / below the estimated rate specified in the Bill of
Quantities part for each item of work both in words and figures.
4) The rates and prices quoted in Bid in the priced Bill of Quantities, except in so far as it is
otherwise provided under the Contract, include all constructional plant, labour, supervision,
materials, erection, maintenance, insurance, profit, taxes and duties, together with all general
risks, liabilities, and obligations set out or implied in the Contract and including remedy of
any defects during the Defects Liability Period.
5) All rates and sums of money quoted in the Bill of Quantities shall be in Indian Rupees (Rs)
rounded to the nearest whole number.
6) The whole cost for complying with the provisions of the Contract shall be included in the
items provided in the Bill of Quantities.
7) Where no items are provided, the cost shall be deemed to be distributed among the rates and
prices entered for the related items of work.
8) After adjusting the bid prices as stated above, final bid evaluation will be done as follows:
(a) Bidder needs to quote in percentage of rates (above /below as indicated in BOQ) for each
part of BOQ. It is mandatory for further evaluation of bids & payment. Payment of items
of each part of BOQ shall be made as per quoted percentage for each part of BOQ.
(b) Successful bidder will be decided based on overall percentage quoted above/below of
Total estimated amount as indicated in Vol-II for the complete project.
9) General directions and descriptions of work and materials are not necessarily repeated nor
summarized in the Bill of Quantities. Reference to the relevant sections of the contract
documentation shall be made before entering prices against each item in the priced Bill of
10) The method of measurement of completed work for payment shall be in accordance with the
requirements as stated in the individual sections of the Technical Specifications.
11) Errors will be corrected by the Employer for any arithmetical errors pursuant to Clause 25 of
the Instructions to Bidder.
12) The specification numbers stated in the detailed description of items of works against
each item are indicated for guidance of the Bidders. However, any of the specification
alluded to the specifications referred to in the Bill of Quantities and / or any other
specifications from Vol.3 “Technical Specifications” which in the opinion of the Engineer
are applicable for a particular item is deemed to have been included in the scope of item and
fully covered by the rates quoted for the items. In case of any discrepancies between
provisions stated in the description of individual items and those covered by the technical
specifications, the provisions in the description of item shall have preference.
13) Rock is defined as all materials which in the opinion of the Engineer, require blasting or the
use of metal wedges and sledge hammers or the use of compressed air drilling for its removal.
14) All concrete items above and including M-15 shall be controlled concrete only.
15) Grouping of items under subheads of different sections is done in Part B BOQ for the
convenience. Any item from any section can be considered for operation in any other section
as indicated as directed by the Engineer.
16) The units of measurement described in the Bill of Quantities are metric units.
17) Abbreviations used in the Bill of Quantities are as follows:
ABBREVATIONS : FOR
Rs or RS : Indian Rupees
LS or L.S. or SUM : Lump Sum
nr. or No. or nos or Nos. : Number (s)
RM : Running metre
KM or km : Kilometre
hct./ha : Hectare
M2 or Sq.m or Sq.m or : Square metre
M3 or Cum or cu.m or : Cubic metre
CC. or c3 or cu.cm : Cubic centimeter
KG or kg or Kg : Kilogram
Mt or tonne or T or MT : Metric Tonne
HP : Horse Power
PS : Provisional Sum
IRC : Indian Roads Congress
MoRT&H : Specifications for Road and Bridge Works
Specification(s) (last revision) issued by the Ministry of
Surface Transport (Roads Wing),
Government of India.
ASP : Additional Technical Specification
BIS : Bureau of Indian Standards
Prov. : Provisional
P.O.L. or POL : Petrol, Oil and Lubricants
Veh. Month or Veh : Vehicle month
month : Calendar month
FRL : Finished Road Level
Veh. Km : Vehicular Kilometre
TS : Technical Specification
EXECUTIVE ENGINEER
EAST (VARACHHA) -A
SURAT MUNICIPAL CORPORATION.
SIGNATURE OF THE TENDERER.
SURAT MUNICIPAL CORPORATION
EAST (VARACHHA) ZONE-A
TENDER NOTICE NO. DMC / EZ-A / 07 /2026-2027
Name of Work:- Annual maintenance work for Set/Reset, Repairing of
footpath with C.C. Kerb, Paver block/Water Table &
Guard Stone in T.P 11, 12 & 17 (Puna), T.P. 64 (Magob-
Dumbhal) & gamtal area of East (Varachha) Zone-A.
(Work no.5) (3rd attempt)
BOQ TO BE FILLED BY BIDDER (ONLINE)
Schedule-B S.O.R. 2023-24
SOR- 23-24 (Rates Without GST)
ITEM Quantity without Per Amount
Excavating the road surface upto required
depth including removing the excavated
1 materials and depositing on the road side 1000.00 104.20 C.M.
upto 50 mt lead etc. complete and as
directed by Engineer-in charge.
Dismantling of Structures on Roadway,
including Disposal of Unserviceable Matrial
2 and Utilising the Serviceable materiel free of
Cost in Permanent Works as Directed by the
Engineer with all Leads and etc. Complete
(A) Brick/Stone Masonry 150.00 550.40 C.M.
(B) Plain Concrete 100.00 609.26 C.M.
(C) Reinforced Concrete 50.00 1057.85 C.M.
(D) Bituminous Pavement 250.00 288.65 C.M.
(E) Non-Bituminous Pavement 250.00 155.25 C.M.
Dismantling tiled or stone or paver block
pavement laid in mortar including stacking of
serviceable material and disposal of
unserviceable material with all lead and lift.
Preparation of subgrade with compacting,
levelling and consolidation of subgrade with
mini roller / plate vibrator machine including
watering and filling in depressions which
occur during the process as directed by
engineer in charge.
Providing and laying Granular Sub Base
conforming to Grading V of Table 400.2 of
compacted thickness of 100 mm with
specified graded stone metal and sand mixed
in pugmill and laid with mechanical means
spreading with motor grader and compacting
with vibratory roller having minimum 80-
100KN static weight to achieve desired
density of 98% of MDD including all material,
labour, machinery with all leads and lifts etc.
Providing and laying cement concrete 1:5:10
( 1 Part of cement:5 Part of coarse sand:
Part of graded stone aggregate of 40 mm
nominal size) in 75 mm thick and curing
complete excluding cost of formwork etc.
(A) Foundation and plinth 250.00 2517.44 C.M.
Providing and laying cement concrete 1:2:4
(1 Cement: 2 coarse sand, 4 graded stone
7 aggregate of 20 mm nominal size) including
providing and fixing reinforcement as
specified in drawing with necessary bending,
binding and placing in position and also inc
(A) R.C.C. Kerb/Pardi 300 mm depth and
(B) R.C.C. Kerb/Pardi 450 mm depth and
Removing / Resetting of 100 mm thick
readymade C.C. kerb M-20(size 300 mm x
380 mm) and setting in line level and in truly
vertical position including filling joints in C.M.
1:1 (1: part of cement:1 part of stone dust)
smooth pointing in C.M. 1:1
Removing and Resetting of paver block of
walk way with necessary sand/pana filling
9 and make in line and level with necessary 2000.00 102.00 S.M.
vibrating using compactor machine and as
deirected by Engineer-in-charge.
Providing 100 mm thick readymade C.C.
kerb of strength M-20 (size 300 mm x
mm) purchased from S.M.C.'s approved
paver block manufacturer and setting in line
level and in truly vertical position including
joins in C.M.1:1 (1:Part of cement:
For regular edge of footpath 400.00 228.00 R.M.
For rounding at the edge of footpath (For
fanning portion)
Providing and fixing interlocking type
Rubber Moulded cement concrete paver
block of approved shape, design and colour
11 having 60 mm thickness (M 35) purchased
from SMC's approved paverblock
manufacture only and fixing on fine sand
bedding item includes
with colour 700.00 524.00 S.M.
Without colour 2800.00 524.00 S.M.
Supplying and filling fine sand (Pana/Stone
Dust/ Crush Sand) in 25/75 mm (Avg.)
compacted thickness over the base including
necessary compaction, watering etc.
complete. Item includes levelling by using
vibratory plates compacted machine and as
directed by Engineer - in-charge
Providing and setting 50 to 60 mm thick rough
kotah stone water table in line, level and in
required gradient including 25 mm thick
beddcing in C.M. 1:6 (1 part of cement : 6 part
of coarse sand) with sufficient ramming
(1) 1'x1' Size (40 to 50 mm thick) 50.00 120.59 R.M.
(1) 2'x1' Size (40 to 50 mm thick) 10.00 118.87 R.M.
Providing and setting 35 to 50 mm thick
rough kotah stone paving for footpath in
line, level and if required gradient including
25 mm thick beddcing in C.M. 1:6 ( 1 pzrt of
cement: 6 part of coarse sand) with sufficient
ramming consolidation. Providing
Removing existing kotah stone flooring in
mortar & vertical stone kerbing including
15 stacking of serviceable material carting at 100.00 47.72 R.M.
S.M.C. store disposal of unserviceable
material with all lead & lift.
Removing & resetting rough kotah stone
paving for footpath in line, level and in
proper gradient including 25 mm thick
bedding in C.M. 1:6 ( 1 part of cement :
part of coarse sand) with sufficient ramming
16 consolidation. Providing joints in C.M. 1:3 ( 1 200.00 155.51 S.M.
part of cement : 3 part of coarse sand) and
smooth pointing in C.M. 1:1 (1 part of
cement : 1 part of coarse sand) including
watering etc. complete and as directed by
Engineer in charge
Removing and resetting rough kotah stone
water table for footpath in line, level and
proper gradient including 25 mm thick
17 bedding in CM 1:6 (1 part of cement, 6 part 200.00 61.94 R.M.
of coarse sand) with sufficient ramming
consolidation providing joints in C.M. 1: (1
Dismentalling carefully existing sewer trap
chamber upto required depth and raising
the same upto new footpath level with B.B.
masonary in C.M. 1:6 (1 part of cement,
part of coarse sand) including 12 mm thick
cement plaster in C.M. 1:3 (1 part of cemen
Supplying and fixing RCC collors (300 mm
19 dia( for tree plantation including all taxes 100.00 60.00 No.
carting, loading, unloading etc. complete.
Providing and fixing in position readymade
cement concrete Water Drain Slab (
x 300 x 80 mm ) M-30 Grade with all
20 labour, material, testing charge etc. 2500.00 183.00 R.M.
complete as per details in tender
specification & as directed by engineer in
Readymade Water Drain Slab ( 600 x 300 x
Providing cutting of existing bituminous
surface up to suitable depth in line and
alignment using mechanically operator
21 cutter machine before excavating existing 1700.00 51.00 R.M.
surface for utility laying including cost of all
type of machinery, fuel , labour , etc and as
per direction of engineer in charge.
Providing and laying cement concrete cast-
in-situ Guard Stone (1:2:4) (1 cement Coarse
sand :4 graded stone aggregate of
22 20mm nominalsize) including cost of form 150.00 551.00 No.
work including, curing labour,machinery,
equipments required to execute this item
etc. complete. Size :- (750 X 350 X 400)
Providing and laying cement concrete cast-
in-situ/Precast kerb in M-20 grade as per
23 drawing and as per details in tender
specification & as directed by engineer in
charge with all leads, lifts, loding & unloding
( i ) 775mm height cement concrete M-20
grade cast-insitu/ Precast Kerbs & Fixing for
Median as per drawing and as per details in 200.00 1160.00 R.M.
tender specification & as directed by engineer
( ii ) 0.15 (th.) *0.30(l)* 0.48(Ht.) mt. in size
cement concrete M-20 grade pre cast Kerbs
& Fixing as per drawing Purchsed from
SMC's approved manufactures and as per
details in tender specification & as directed by
engineer in charge.
Providing & fixing interlocking type cement
concrete paver block of approved shape &
design having 60 mm thickness (M-40)
purchased from SMC's approved paverblock
manufacturer only on fine sand bedding.
Item includes leveling by using vibratory
plates compacted machine. Item also
includes all materials, Labour, euipments,
tools, plants, watering, cleaning etc.
A For Road Junction 80 mm thick ( M-50) 0.00 714.00 S.M.
B For Road Junction 100 mm thick ( M-50) 0.00 965.00 S.M.
Net Estimated Amount RS. ₹
SIGNATURE OF THE CONTRACTOR
Executive Engineer
East (Varachha) Zone-A
Surat Municipal Corporation
SURAT MUNICIPAL CORPORATION
EAST (VARACHHA) ZONE-A
NAME OF WORK :- Annual maintenance work for Set/Reset, Repairing of
footpath with C.C. Kerb, Paver block/Water Table &
Guard Stone in T.P 11, 12 & 17 (Puna), T.P. 64 (Magob-
Dumbhal) & gamtal area of East (Varachha) Zone-A.
(Work no.5) (3rd attempt)
I/we hereby tender to execute the above mentioned work in accordance with
the accompanying specification and conditions in consideration of payment being made for
the quantity of work to be executed at PAR/at___________ % (percent) in
BELOW/ABOVE the amount worked out at the rate entered in column 4 and as per the total
Final total cost tendered as per the rate quoted above will be
in accordance in all respects with the specification, design and instructions in writing as
per the terms and conditions specified in the bid document including Schedule A & B.
SIGNATURE OF THE BIDDER.
EXECUTIVE ENGINEER
EAST (VARACHHA) ZONE-A
SURAT MUNICIPAL CORPORATION.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
VOLUME-1-TECH. BID.pdf
volume-2_price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .