Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.8 L+₹49,311.61 (11.5%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.8 L+₹54,330.42 (12.7%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SARLA DEVI CONTRACTOR L1 | SUNIL SWARUP CONTRACTOR L3 | PARVEJ URF MEENU L2 |
|---|---|---|---|---|---|---|
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit and dressing of Excavated Silt/Earth etc. (by Poklain Machine) | 7,651.56 | Cum | 44.5 ₹3,40,494.42 Lowest | 50.05 ₹3,82,960.58 | 49.53 ₹3,78,981.77 |
| 1.02 | Scrapping internal section of existing channel i.e. bed and slope with silt upto 5.00 cm. | 10,838 | Sqm | 4.55 ₹49,312.9 Lowest | 5.12 ₹55,490.56 | 5.07 ₹54,948.66 |
| 1.03 | Cleaning thick bushes and thorny Jungle without uprooting. | 4,150.8 | Sqm | 4.45 ₹18,471.06 Lowest | 5.01 ₹20,795.51 | 4.95 ₹20,546.46 |
| 1.04 | Ordinary jungle clearance | 6,226.2 | Sqm | 3.35 ₹20,857.77 Lowest | 3.89 ₹24,219.92 | 3.85 ₹23,970.87 |
Tender Value
Refer Docs
EMD Value
₹10,500
Closing Date
12 Oct 2026, 10:30 amClosed
Executive Engineer
Executive Engineer, Office Sharda Sagar Division Pilibhit
Silt Clearance and scraping work of Puranpur Dy from km. 0.000 to km. 8.260 for year 2026-27(Lot-04)
2026_UPIDC_1190802_4
04/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
30 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹10,500
14 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Silt clearance/trench digging including lift upto 1.5m and lead upto 30m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit and dressing of Excavated Silt/Earth etc. (by Poklain Machine) | 7,651.56 | Cum | - | - |
| 1.02 | Scrapping internal section of existing channel i.e. bed and slope with silt upto 5.00 cm. | 10,838 | Sqm | - | - |
| 1.03 | Cleaning thick bushes and thorny Jungle without uprooting. | 4,150.8 | Sqm | - | - |
| 1.04 | Ordinary jungle clearance | 6,226.2 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 24.59 MB
BOQ_2244698.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .