Loading…
Loading…
Tender ID
Tender Value
₹8.0 L
EMD Value
₹8,100
Closing Date
27 Mar 2026, 6:00 pmClosed
Deputy Executive Engineer, Electrical (R&B) Sub-Division, Surat
All in Comprehensive Maintenance of AC Machine, Water cooler, and Water Heater of New circuit House, Surat (for 2025-2026)
287252
18 OF 2025-26
Open
Electrical Works
Works
Surat
7 documents required · 7 mandatory
₹900
Yes
Executive Engineer, Electrical (R&B) Division, Surat
₹8,100
Yes
17 Mar 2026
17 Mar 2026
17 Mar 2026
27 Mar 2026
17 Mar 2026
Name of work :- All in Comprehensive Maintenance of AC Machine, Water cooler, and Water Heater of New
circuit House, Surat (for 2025-2026)
Memorandum showing items of work to be carried out
Item Quantities Item of work Estimated Rates Unit Total
No. estimated but Amount
may be more according to
or less In words estimated
1A 5 Ea. All inclusive comprehensive maintenance cost for 1206.95 Rupees One Ea.
the period of one year for the Split type Air- Thousand Two
conditioning Unit of following Capacity Hundred Six
(A) 1.0 ton capacity And Paise
(1) Charges for breakdown Maintenance as per Ninety Five
requirement throughout the year Only
1B 5 Ea. (2) Charges for 1st Routine Maintenance of Dry 141.40 Rupees One Ea.
Services between date of commencement to 3rd Hundred Forty
Months from date of issue of work order. One And Paise
1C 5 Ea. (3) Charges for 2nd Routine Maintenance of wet 261.59 Rupees Two Ea.
Services with water or Chemical as per site Hundred Sixty
requirement Services between 3rd months to 6th One And Paise
Months from date of issue of work order. Fifty Nine
1D 5 Ea. (4) Charges for 3rd Routine Maintenance of Dry 141.40 Rupees One Ea.
Services between 6th months to 9th Months from Hundred Forty
date of issue of work order. One And Paise
1E 5 Ea. (5) Charges for 4th Routine Maintenance of wet 261.59 Rupees Two Ea.
Services with water or Chemical as per site Hundred Sixty
requirement Services between 9th months to 12th One And Paise
Months from date of issue of work order. Fifty Nine
2A 46 Ea. All inclusive comprehensive maintenance cost for 2282.60 Rupees Two Ea.
the period of one year for the Inverter Based Split Thousand Two
type Air-conditioning Unit of following Capacity Hundred
(B) 1.5 ton capacity. Eighty Two
(A) Charges for breakdown Maintenance as per And Paise
requirement throughout the year Sixty Only
2B 46 Ea. (B) Charges for 1st Routine Maintenance of Dry 267.65 Rupees Two Ea.
Services between date of commencement to 3rd Hundred Sixty
Months from date of issue of work order. Seven And
2C 46 Ea. (C) Charges for 2nd Routine Maintenance of wet 494.90 Rupees Four Ea.
Services with water or Chemical as per site Hundred
requirement Services between 3rd months to 6th Ninety Four
Months from date of issue of work order. And Paise
2D 46 Ea. (D) Charges for 3rd Routine Maintenance of Dry 267.65 Rupees Two Ea.
Services between 6th months to 9th Months from Hundred Sixty
date of issue of work order. Seven And
2E 46 Ea. (E) Charges for 4th Routine Maintenance of wet 494.90 Rupees Four Ea.
Services with water or Chemical as per site Hundred
requirement Services between 9th months to 12th Ninety Four
Months from date of issue of work order. And Paise
3A 51 Ea. All inclusive comprehensive maintenance cost for 2829.01 Rupees Two Ea.
the period of one year for the Inverter Based Split Thousand
type Air-conditioning Unit of following Capacity Eight Hundred
(C) 1.7 to 2.0 ton capacity. Twenty Nine
(A) Charges for breakdown Maintenance as per And Paise One
requirement throughout the year Only
3B 51 Ea. (B) Charges for 1st Routine Maintenance of Dry 330.27 Rupees Three Ea.
Services between date of commencement to 3rd Hundred
Months from date of issue of work order. Thirty And
3C 51 Ea. (C) Charges for 2nd Routine Maintenance of wet 612.06 Rupees Six Ea.
Services with water or Chemical as per site Hundred
requirement Services between 3rd months to 6th Twelve And
Months from date of issue of work order. Paise Six Only
3D 51 Ea. (D) Charges for 3rd Routine Maintenance of Dry 330.27 Rupees Three Ea.
Services between 6th months to 9th Months from Hundred
date of issue of work order. Thirty And
3E 51 Ea. (E) Charges for 4th Routine Maintenance of wet 612.06 Rupees Six Ea.
Services with water or Chemical as per site Hundred
requirement Services between 9th months to 12th Twelve And
Months from date of issue of work order. Paise Six Only
4 3 Ea. All inclusive comprehensive maintenance cost for 3339.06 Rupees Three Ea.
the period of one year for the water Cooler of Thousand
following Capacity Three Hundred
(B) 120 / 150 Ltr capacity Thirty Nine
5 2 Ea. All inclusive comprehensive maintenance cost for 693.87 Rupees Six Ea.
the period of one year for the water Heater( Hundred
Geysers) inclusive inlet & outlet water connections Ninety Three
flexible piping of following Type & Capacity And Paise
(B) 15 to 25 Ltr Storage Type Eighty Seven
6A 38 Ea. All inclusive comprehensive maintenance cost for 4434.91 Rupees Four Ea.
the period of one year for the Inverter Based Thousand Four
Cassette type split Air-conditioning Unit of Hundred
following Capacity (B) 2.0 ton capacity Thirty Four
(A) Charges for breakdown Maintenance as per And Paise
requirement throughout the year Ninety One
6B 38 Ea. (B) Charges for 1st Routine Maintenance of Dry 518.13 Rupees Five Ea.
Services between date of commencement to 3rd Hundred
Months from date of issue of work order. Eighteen And
6C 38 Ea. (C) Charges for 2nd Routine Maintenance of wet 960.51 Rupees Nine Ea.
Services with water or Chemical as per site Hundred Sixty
requirement Services between 3rd months to 6th And Paise
Months from date of issue of work order. Fifty One Only
6D 38 Ea. (D) Charges for 3rd Routine Maintenance of Dry 518.13 Rupees Five Ea.
Services between 6th months to 9th Months from Hundred
date of issue of work order. Eighteen And
6E 38 Ea. (E) Charges for 4th Routine Maintenance of wet 960.51 Rupees Nine Ea.
Services with water or Chemical as per site Hundred Sixty
requirement Services between 9th months to 12th And Paise
Months from date of issue of work order. Fifty One Only
7A 7 Ea. All inclusive comprehensive maintenance cost for 7236.65 Rupees Seven Ea.
the period of one year for the Inverter Based Thousand Two
Cassette type split Air-conditioning Unit of Hundred
following Capacity (C) for 3.0 ton capacity 3 Phase Thirty Six And
(A) Charges for breakdown Maintenance as per Paise Sixty
requirement throughout the year Five Only
7B 7 Ea. (B) Charges for 1st Routine Maintenance of Dry 844.36 Rupees Eight Ea.
Services between date of commencement to 3rd Hundred Forty
Months from date of issue of work order. Four And Paise
7C 7 Ea. (C) Charges for 2nd Routine Maintenance of wet 1568.53 Rupees One Ea.
Services with water or Chemical as per site Thousand Five
requirement Services between 3rd months to 6th Hundred Sixty
Months from date of issue of work order. Eight And
7D 7 Ea. (D) Charges for 3rd Routine Maintenance of Dry 844.36 Rupees Eight Ea.
Services between 6th months to 9th Months from Hundred Forty
date of issue of work order. Four And Paise
7E 7 Ea. (E) Charges for 4th Routine Maintenance of wet 1568.53 Rupees One Ea.
Services with water or Chemical as per site Thousand Five
requirement Services between 9th months to 12th Hundred Sixty
Months from date of issue of work order. Eight And
Rupees Eight Lakh(s) Two Thousand Three Hundred Sixty One And Paise Seventeen Only
I/We am /are willing to carry out the work at…………% above/below percent (should be written in figures and words) at
the estimated rates mentioned above amount of my/your tender works out as under.
*Estimated Amount *Estimated Amount
put to Tender Rs. 802361.17 put to Tender Rs.
Deduction …………….. % below………………… Add ………… % above Rs. …………….
Note 1:- All work shall be carried out as per public work department hand book and other specifications of Division
Note 2:- Rates quoted include clearance of site (Prior commencement of work and its close) in all respects and hold
good for work under all condition, site, moisture/ weather etc
Note 3:- The Contractor shall exhibit a board as per Government Circular No. BDG/ 3277/ 1657/ N Dated 26/1/1997
S (M.GUJ) with detailed specification and details of work and amount involved at site without any payment
as directed by the Engineer-in-charge.
Signature of Bidder Deputy Executive Engineer
Electrical (R&B) Sub-Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
AMC CONDITION.pdf
FINAL _ SBD (Electrical Work) bOOK LATE.pdf
NIVIDA -18 OF 2025-26.pdf
schedule-B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .