Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD DHANBAD 828121 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | L1 | Accepted-AOC L-1 | |
| 2 | L2₹2.5 L+₹7,198.82 (3.00%)Rejected-Finance 0 2 12 SIJUA TETULMURI DHANBAD DHANBAD JHARKHAND 828121 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.5 L+₹11,998.03 (5.00%)Rejected-Finance ESTIMURI 22 12 SIJUA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828121 | L3 | Rejected-Finance L3 |
Tender Value
₹2.8 L
EMD Value
₹3,600
Closing Date
9 Mar 2026, 6:00 pmClosed
AREA MANAGER (ENM) KATRAS AREA
OFFICE OF THE GENERAL MANAGER BCCL KATRAS AREA IV ENM DEPT. Post-SIJUA PIN-828121 JHARKHAND
REPLACEMENT OF FOOT VALVE OF 3000 GPM PUMP SENSE AND 4000 GPM 10UPH8 PUMP(F9) AT AKWMC,OCP KATRAS AREA.(2) LOWERING 3 TIMES OF 2000 GPM KIRLOSKAR PUMP SET ON PONTOON AND FABRICATION
2026_BCCL_354823_1
BCCL/KA/IV/ENM/E-TEN/25-26/166 DT.27.2.2026
Open Tender
Electrical and Maintenance Works
Percentage
10 days
AKWMC KATRAS AREA IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,600
18 Mar 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
27 Feb 2026 - 2 Mar 2026
ITEM DESCRIPTION / HEADLING
(1) REPLACEMENT OF FOOT VALVE OF 3000 GPM PUMP SENSE AND 4000 GPM 10UPH8 PUMP(F9) AT AKWMC,OCP KATRAS AREA.:- DISMANTLING OF PUMP MOTOR SET AND DELIVERY AND STARTER.(8 HEAD X 01 SHIFT)(H/SK-3X502.44+SK-5X434.96 = 3682.12
MANUAL MARCHING OF PONTOON OF PUMP FROM WEST CORNER TO WORKING DOCK AND REMARCHING BACK TO PUMPING STATION.(10 HEAD X 01 SHIFT)(02X502.44+SK-8X434.96)= 4484.56
DISMANTLING OF SUCTION AND FOOT VALVE,TRANSPORTATION TO GROUND FOR REPAIR.(8 HEAD X 01 SHIFT) (3X502.44+SK-5X434.96 ) = 3682.12
REPAIRING OF FOOT VALVE,INSTALLATION OF SUCTION AND FOOT VALVE. (12 HEAD X 01 SHIFT) (H/SK-5X502.44+SK-7X434.96)= 5556.92
INSTALLATION OF PUMP,CONNECTION OF PUMP DELIVERY WITH EXITING PIPELINE THROUGH DA HOSE PIPE. (12 HEAD X 01 SHIFT) (H/SK-5X502.44+SK-7X434.96)= 5556.92
SAME JOB REPEATED FOR 3000 GPM PUMP SENSE AND 4000 GPM 10UPH8 PUMP.
(2) LOWERING 3 TIMES OF 2000 GPM KIRLOSKAR PUMP SET ON PONTOON AND FABRICATION REQUIRED BEND AND SHORT PIECES AS REQUIRED AT EAST CORNER OF AMPL SUMP OF AKWMC,OCP KATRAS AREA.:- DISMANTLING OF PUMP MOTOR SET AND DELIVERY AND STARTER.(8 HEAD X 01 SHIFT) (H/SK-3X502.44+SK-5X434.96 = 3682.12
MANUAL REMOVING THE DA HOSE TO FREE THE AREA FOR LOWERING.(10 HEAD X 01 SHIFT)(02X502.44+SK-8X434.96) 4484.56
LAYING AND ERECTION OF PIPE 10" MS PIPE INCLUDING TRANSPORTATION IN VERTICAL.(H/SK-03X502.44+SK- 10X434.96) = 5856.92
FABRICATION OF SHORT PIECES.(4 HEAD X 01 SHIFT) (H/SK- 502.44+SK- 3X434.96 ) = 1807.32
FABRICATION OF MS.(4 HEAD X 01 SHIFT) (H/SK- 502.44+SK- 3X434.96 ) = 1807.32
TRANSPORTATION AND INSTALLATION/ERECTION OF SHORT PIECES/FREE FLANGE/BEND IN VERTICAL.(6 HEAD X 01 SHIFT) (02X502.44+SK-4X434.96) = 2744.72
INSTALLATION OF PUMP DA HOSE PIPE,PUMP MOTOR AND STARTER. (12 HEAD X 01 SHIFT) (H/SK-5X502.44+SK-7X434.96)= 5556.92
SAME LOWERING TO BE REPEATED 2 TIMES
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_367660.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .