Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD TETULMURI DHANBAD 00 00 TETULMURI SIJUA DHANBAD DHANBAD JHARKHAND INDIA | DHANBAD | JHARKHAND | 828121 | ₹2.4 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹2.5 LRejected-Finance 0 2 12 SIJUA TETULMURI DHANBAD DHANBAD JHARKHAND 828121 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹2.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.5 LRejected-Finance ESTIMURI 22 12 SIJUA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹2.5 L | L3 | Rejected-Finance L3 |
Tender Value
₹2.8 L
EMD Value
₹3,600
Closing Date
9 Mar 2026, 6:00 pmClosed
AREA MANAGER (ENM) KATRAS AREA
OFFICE OF THE GENERAL MANAGER BCCL KATRAS AREA IV ENM DEPT. Post-SIJUA PIN-828121 JHARKHAND
REPLACEMENT OF FOOT VALVE OF 3000 GPM PUMP SENSE AND 4000 GPM 10UPH8 PUMP(F9) AT AKWMC,OCP KATRAS AREA.(2) LOWERING 3 TIMES OF 2000 GPM KIRLOSKAR PUMP SET ON PONTOON AND FABRICATION
2026_BCCL_354823_1
BCCL/KA/IV/ENM/E-TEN/25-26/166 DT.27.2.2026
Open Tender
Electrical and Maintenance Works
10 days
AKWMC KATRAS AREA IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,600
18 Mar 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
27 Feb 2026 - 2 Mar 2026
ITEM DESCRIPTION / HEADLING
(1) REPLACEMENT OF FOOT VALVE OF 3000 GPM PUMP SENSE AND 4000 GPM 10UPH8 PUMP(F9) AT AKWMC,OCP KATRAS AREA.:- DISMANTLING OF PUMP MOTOR SET AND DELIVERY AND STARTER.(8 HEAD X 01 SHIFT)(H/SK-3X502.44+SK-5X434.96 = 3682.12
MANUAL MARCHING OF PONTOON OF PUMP FROM WEST CORNER TO WORKING DOCK AND REMARCHING BACK TO PUMPING STATION.(10 HEAD X 01 SHIFT)(02X502.44+SK-8X434.96)= 4484.56
DISMANTLING OF SUCTION AND FOOT VALVE,TRANSPORTATION TO GROUND FOR REPAIR.(8 HEAD X 01 SHIFT) (3X502.44+SK-5X434.96 ) = 3682.12
REPAIRING OF FOOT VALVE,INSTALLATION OF SUCTION AND FOOT VALVE. (12 HEAD X 01 SHIFT) (H/SK-5X502.44+SK-7X434.96)= 5556.92
INSTALLATION OF PUMP,CONNECTION OF PUMP DELIVERY WITH EXITING PIPELINE THROUGH DA HOSE PIPE. (12 HEAD X 01 SHIFT) (H/SK-5X502.44+SK-7X434.96)= 5556.92
SAME JOB REPEATED FOR 3000 GPM PUMP SENSE AND 4000 GPM 10UPH8 PUMP.
(2) LOWERING 3 TIMES OF 2000 GPM KIRLOSKAR PUMP SET ON PONTOON AND FABRICATION REQUIRED BEND AND SHORT PIECES AS REQUIRED AT EAST CORNER OF AMPL SUMP OF AKWMC,OCP KATRAS AREA.:- DISMANTLING OF PUMP MOTOR SET AND DELIVERY AND STARTER.(8 HEAD X 01 SHIFT) (H/SK-3X502.44+SK-5X434.96 = 3682.12
MANUAL REMOVING THE DA HOSE TO FREE THE AREA FOR LOWERING.(10 HEAD X 01 SHIFT)(02X502.44+SK-8X434.96) 4484.56
LAYING AND ERECTION OF PIPE 10" MS PIPE INCLUDING TRANSPORTATION IN VERTICAL.(H/SK-03X502.44+SK- 10X434.96) = 5856.92
FABRICATION OF SHORT PIECES.(4 HEAD X 01 SHIFT) (H/SK- 502.44+SK- 3X434.96 ) = 1807.32
FABRICATION OF MS.(4 HEAD X 01 SHIFT) (H/SK- 502.44+SK- 3X434.96 ) = 1807.32
TRANSPORTATION AND INSTALLATION/ERECTION OF SHORT PIECES/FREE FLANGE/BEND IN VERTICAL.(6 HEAD X 01 SHIFT) (02X502.44+SK-4X434.96) = 2744.72
INSTALLATION OF PUMP DA HOSE PIPE,PUMP MOTOR AND STARTER. (12 HEAD X 01 SHIFT) (H/SK-5X502.44+SK-7X434.96)= 5556.92
SAME LOWERING TO BE REPEATED 2 TIMES
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_367660.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid