| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.6 L+₹90,752.18 (7.14%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ABDUL RAHIMAN B A L1 | MOHAMMED HANIS M A L2 |
|---|---|---|---|---|---|
| 1.00Public Well Maintanance | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 69 | hour | 325 ₹22,425 Lowest | 330 ₹22,770 |
| 1.00 | OD470143/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator) /manual
means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm
on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m,
including getting out the excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m.12.00 m 13.50 m | 96.64 | cum | 1,324.4 ₹1,27,991.34 Lowest | 1,400 ₹1,35,297.4 |
| 1.00 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1,370.96 | kg | 182.7 ₹2,50,475.12 Lowest | 190 ₹2,60,483.16 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 14.7 | cum | 9,263.6 ₹1,36,128.6 Lowest | 9,500 ₹1,39,602.5 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 141.05 | sqm | 363.2 ₹51,230.81 Lowest | 400 ₹56,421.6 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,303.88 | kilogram | 105.7 ₹1,37,820.33 Lowest | 150 ₹1,95,582.3 |
| 1.01 | OD470144/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest
size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 50.2 | cum | 5,718.32 ₹2,87,076.82 Lowest | 5,800 ₹2,91,177.4 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.95 | cum | 7,462.7 ₹74,283.72 Lowest | 7,500 ₹74,655 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.95 | cum | 8,650 ₹86,102.1 Lowest | 8,800 ₹87,595.2 |
Tender Value
₹12.7 L
EMD Value
₹31,775
Closing Date
5 Mar 2026, 10:00 amClosed
AE LSGD MANGALPADY
AE LSGD MANGALPADY GP
WELL REPAIR
2026_LSGD_840541_7
AE/LSGD/MGP/ETD/09/2025-2026
Open Tender
Repair and Maintenance Works
Item Wise
180 days
MANGALPADY GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,775
Yes
28 Apr 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Public Well Maintanance | |||||
| 1.001 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 69 | hour | - | - |
| 1.002 | OD470143/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator) /manual
means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm
on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m,
including getting out the excavated soil and disposal of surplus excavated soil as
directed, within a lead of 50 m.12.00 m 13.50 m | 96.64 | cum | - | - |
| 1.003 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1,370.96 | kg | - | - |
| 1.004 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 14.7 | cum | - | - |
| 1.005 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 141.05 | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,303.88 | kilogram | - | - |
| 1.007 | OD470144/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest
size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 50.2 | cum | - | - |
| 1.008 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.95 | cum | - | - |
| 1.009 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.95 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1417383.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
PriliminaryAgg.pdf
Tender Documents • 0.06 MB
BOQ_1417383.xls
BOQ • 0.31 MB
450BD.pdf
Tender Documents • 1.97 MB
450NIT.pdf
Tender Documents • 0.03 MB
DECLARATION.pdf
Tender Documents • 0.05 MB
EPayment.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .