Loading…
Loading…
Tender Value
₹13.0 L
EMD Value
₹13,050
Closing Date
8 Jun 2026, 6:00 pm3d left
CHIEF OFFICER, NAGARPALIKA CHHOTAUDEPUR.
CONSTRUCTION WORK OF TROMMEL SHED AT PIPLEJ DUMPING SITE OF CHHOTA UDEPUR NAGARPALIKA UNDER: 15TH FINANCE (UNTIED) GRANT YEAR-2025-26.
308851
1367/2026 DATE-21/05/2026
Open
Civil Works
Chhota Udaipur
3 documents required · 3 mandatory
₹1,062
The Chief Officer, Chhotaudepur nagar palika, Chhotaudepur.
₹13,050
27 May 2026
27 May 2026
27 May 2026
8 Jun 2026
27 May 2026
Item Qty. Description Total Unit Amount
1 32.00 Excavation for base footings upto depth 1.5 m. including
Cmt. sorting out and disposing of the excavated material upto 50 m
lead (loose or soft soil)
2 7.00 Excavation for base footings upto depth 1.5 m. to 3.0 m.
Cmt. including sorting out and disposing of the excavated material
upto 50 m lead (loose or soft soil)
3 29.00 Filling available excavated earth (excluding rock) in trenches.
Cmt. plinth, sides of foundations etc. in layers not exceeding 20 cm.
in depth consolidating each disposited layer by ramming and
4 8.00 Providing and laying cement concrete 1:3:6 (1 Cement,
Cmt. coarse sand, 6 crushed stone aggregates 40mm. Nominal
size) and curing ecomplete excluding cost of formwork in (A)
Foundation and Plinth.
5 Providing and laying controlled cement concrete M-250 and
curing complete including the cost of formwork and excluding
the cost of reinforcement of reinforced concrete work in
a. 8.00 -- do -- for R.C.C. Column Footing 4674.79 Cmt.
b. 1.00 -- do -- for R.C.C. Column Up to G.L 6704.38 Cmt.
c. 6.00 -- do -- for Ground Beam 4841.44 Cmt.
d. 12.00 -- do -- for Grade Slab 4674.79 Cmt.
f. 1.00 -- do -- for R.C.C. Column Above G.L 6703.88 Cmt.
SBD SECTION-7 BILL OF QUANTITIES-149
5360.00 Providing T.M.T. Bar Fe 500 / 500-D reinforcement for
Kgs. R.C.C.work including bending, Binding and placing in position
complete upto floor two level.(upto 10 ton)
7 60.00 Carring out plinth treatment to post construction / existing
Smt structure by spraying chemical solution for termite control
treatment including labour and material consistment with I.S.I
specification. Using Chlordene and Chiorpurfiles 20 EC. As
Per 6131_paret-II Consentration Weight one percent is
recommended i.e one litre 20 EC chemical emulsion with
liter give 1 % concrentration inclusive of one litre chemical
emulsion appication at the rate of 5 Litre chemical / Sqm of
surface is recommended as per I.S
8 3.00 Brick work using common burnt clay building bricks having
Cmt. crushing strength not less than 35 kg./Sq.Cm. in foundation
and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand) (B)
` Conventional 4153.07 Cmt.
9 18.00 Filling in foundation and plinth with murrum or selected soil in
Cmt. layers of 20cm. thickness including watering, ramming and
consolidating etc. complete.
10 20.00 Providing 15 mm. thick cement plaster in single coat on Rough
Smt (similar) side of single or half brick walls for interior plastering
upto floor two level and finished even and smooth in. (II)
cement mortar 1 : 4 (1 cement : 4 sand) Extra over item 58 to
64 for finishing with a floating coat of neat cement slurry. (upto
11 20.00 Distempeing (Three coats) with oil bound washable distemper
Smt of approved brand and manufacture and of required shade on
wall surfaces to give an even shade, over and including a
priming coat with alkali resistance primer of approved brand
after thoroughly brushing the surface and other foreign matter
and also including preparing the surface even and sand
parpered smooth
SBD SECTION-7 BILL OF QUANTITIES-150
12 6.00 Providing and laying polished Kota stone slab flooring over
Smt 20mm (Average) thick base of cement mortar 1:6 (1- cement :
6-coarse sand) or L.M. 1.1.5 laid over and jointed with grey
cement slurry including rubbing and polishing etc. complete.
(B) 30 mm thick
13 42.00 Steel work, welded in built up sections framed work including
QT cutting, hoisting, fixing in position and applying a priming coat
of red lead paint. (A)In beams and joists, channels angles
Tees, flats, with connecting plates or angle cleats as in main
and cross beams. Hip and jack rafters, purlins conneted to
common rafters and the like
14 60.00 Providing corrugated G.I. sheet of class-3 roofing fixed with
Smt glavanished iron J or L Hooks, Bolts and nuts 8mm diameter
with bitumen and G.I. limpet washer or G.I. limpet washer.
filled with white lead complete excluding the cost of purlins,
Rafters and Trusses.(1) 0.80 mm thick sheet.
15 240.00 Painting two coats (including priming coat) on new steel and
Smt other metal surface with synthetic enamel paint, brushing to
give an even shade including cleaning the surface of all dirt,
dust and other foreign matter
Add 18% GST charges Rs.
Add 2% Contengency charges Rs.
Add 1% Quality Control charges Rs.
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in
words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) ____________________________________________ Percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
SBD SECTION-7 BILL OF QUANTITIES-151
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good
for work under.
Note :3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Signature of Contractor President Chief Officer
Chhota Nagarpalika
Chhota Udepur Udepur Nagarpalika Chhota udepur
Chhota Nagarpalika
Udepur Nagarpalika
Chhota Udepur Chhota Udepur
SBD SECTION-7 BILL OF QUANTITIES-152
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD SECTION-1 TO 4.pdf
SBD SECTION-5 TECHNICAL SPECIFICATION.pdf
SBD SECTION-6 FORM OF BID.pdf
SBD SECTION-7 BILL OF QUANTITIES.pdf
SBD SECTION-7.1-Schedule-B-tromel shed 10 x 6.pdf
SBD SECTION-8 SECURITIES AND OTHER FORMS.pdf
SBD SECTION-9 DRAWING.pdf
SBD SECTION-10 DOCUMENTS FURNISHED BY BIDDER.pdf
GENERAL INSTRUCTIONS TO BIDDERS.pdf
Notes.pdf
Required Attachment Form as Per Bid Evaluation Criteria.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid